Application of Battery Energy Storage Systems for Relief of Generation Curtailment in Terms of Transient Stability

1
Korea Electric Power Research Institute, Korea Electric Power Corporation, 105 Munji-ro, Yuseong-gu, Daejeon 34056, Korea
2
Department of Electrical and Information Engineering, Seoul National University of Science and Technology, 232 Gongneung-ro, Nowon-gu, Seoul 01811, Korea
*
Author to whom correspondence should be addressed.
Energies 2021, 14(13), 3898; https://doi.org/10.3390/en14133898
Submission received: 13 May 2021 / Revised: 23 June 2021 / Accepted: 24 June 2021 / Published: 29 June 2021

Abstract

:
Maintaining transient stability is crucial in power system operation. Transient stability is mainly affected by the generation amount of the study region, as well as the transmission topology. Several countermeasures can be taken for transient stability, but the usually used control means are generating unit tripping and generation curtailment. In terms of economic operation, one can say that the solution of generating unit tripping is more beneficial. To maintain the transient stability of the east coast region in the Korean power system, applying generation curtailment in the normal state is further needed, because the required tripping amount is too large for the case of only taking generator tripping, and this might cause a critical decrease in system frequency, possibly resulting in operation of the first stage of under frequency relay (UFR). This paper presents the application of battery energy storage systems (BESSs) to relieve the generation curtailment, using the characteristic of fast response of BESS. Assuming that BESSs are installed in the candidate location in the study region, the adequate BESS action of absorbing the kinetic energy from those critical generators after disturbances can improve transient stability, and it can decrease the amount of generation curtailment. This paper includes the results of simulation studies to show the effectiveness of the BESS control for the relief of generation curtailment.

1. Introduction

In power system operation, maintaining transient stability is one of important factors to secure the system subjected to a severe disturbance, which may lead to a large impact, such as the loss of synchronism of rotating machines [1]. Transient stability as one of subcategories of rotor angle stability is mainly affected by the generation level of the study region and the transmission topology [2]. The challenge in maintaining transient stability might increase for future power systems as the total inertia in the system reduces due to the high penetration of power electronic interfaced generators [3,4]. To improve transient stability, several countermeasures can be taken, including equipping new facilities in the system planning stage, but the usually used control means in the system operating stage are generating unit tripping and generation curtailment. Of them, tripping critical generating units is considered more economical because it is in the category of corrective actions that can be applied when the event actually happens during system operation.
If the generation level in the study region is critically high without enough transmission capability after the critical event, such as in the east coast region of Korea, the required amount of generation tripping is so high and the action might cause a critical frequency decrease, possibly resulting in operation of the first stage of under frequency relay (UFR). According to the Korean power system reliability criteria [5], if system operator notices the operation of UFR in the normal design contingent states, the countermeasures against the UFR operation should be devised. In this situation, the other control mean, generation curtailment, needs to be adopted to satisfy a certain rule with a limited generation tripping amount.
In most cases, relieving generation curtailment is desirable with other control means, because generation curtailment is a preventive measure applied in the normal state. Therefore, this paper proposes the application of the energy storage system (ESS) to relieve the required generation curtailment. Several ESS applications for grid support including its benefits and challenges have been being studied and reviewed. In Reference [6], a battery energy storage system (BESS), with its fast response, contributes to the power system by providing a better emergency control. BESS also offers several important benefits to individual customer by gaining the flexibility of the power system, which further leads to cost efficiency. For grid support applications, adequate design of the inverter is required as in Reference [7]. In Reference [8], the application of BESS is identified into ten key applications for the entire power system chain from generation system, transmission and distribution system, and customers. Multiple benefits of each key application are analyzed resulting in three applications with the highest value in terms of total cost resource, namely the wholesale service with regulation, commercial and industrial power quality and reliability, and stationary and transportable systems for grid support and transmission and distribution deferral. In some circumstances, a combination of two or more ESS applications is required to produce total benefits that exceed total costs [9]. Furthermore, ESS application for modern power system is reviewed in References [10,11]; Reference [10] presents potential applications for wind power support, while Reference [11] identifies ESS issues and challenges for microgrid applications. There are some challenges in the policy aspects which may limit the true potential of BESS, particularly due to its multifunctional characteristic so that ownership and operational rules among various stakeholders are difficult to establish [8]. However, several significant changes in policy aspects have been implemented with the support of technological developments so that more benefits from the ESS can be obtained [12].
The ESS applications can be categorized into three groups, from the viewpoint of grid support type, such as energy, power and flexibility support services. For energy support service, ESS with large energy capacity is required as it is used for long charge/discharge durations from some minutes to hours, and this kind of service is mainly for energy time shift. For power support service, the required capacity of energy storage is not as large as the one for energy support service, since the ESS is used for short period of time; however, the ESS power output should be high. Flexibility support service is to provide additional flexibility to the system with high penetration rate of renewable energy resources. Of them, network stability improvement by ESS is included in power support service. Pertaining to this ESS application, there were some works conducted in the literature. In Reference [13], a feasibility study on transient stability improvement using superconducting magnetic energy storages (SMES) was performed. In Reference [14], a controller for damping improvement and voltage regulation using energy storage devices was proposed using the input–output feedback linearization method. In Reference [15], tube-based model predictive control method was employed to obtain power output signals of SMES for transient stability improvement.
This paper presents a feasibility study on the application of battery energy storage systems (BESSs) for the relief of generation curtailment caused by a severe disturbance affecting the transient stability of Korean power systems. In the study, a control model of the BESS was needed to obtain their impact on transient stability. To improve transient stability, the desirable behavior of BESS to absorb the kinetic energy of critical generators increased during disturbances, assuming that BESSs are equipped near the generators. There are two methods that can be considered to implement the action, namely the frequency response and the event-based control. The first strategy uses the frequency deviation as the input for the droop control to determine the output power of BESS. The other is a type of special protection scheme such that the critical event activates the charging control of BESS with a specified constant active power. The impact of both control strategies in terms of stability improvement is compared, and the control parameter of each strategies is observed to obtain the most adequate setting. By taking the advantages of each strategy, this study proposes the combination of the two control schemes, and this is called a hybrid control strategy, and the proper control parameters that have been observed previously are also applied. Based on the simulation result, the hybrid control strategy proved to be able to outperform the other two strategies. The impact of the proposed hybrid control-based BESS is not only improving the transient stability but also enhancing the frequency stability of the system, which is another issue that requires generation curtailment. Moreover, the effectiveness of BESS using the proposed hybrid control to relieve the generation curtailment is examined. It is obtained that the relief effect of the generation curtailment can be maximized when the BESS output is below 40 MW.
The rest of this paper is organized as follows. In Section 2, the application of BESS for relief of generation curtailment is explained. The control strategy of BESS for relief of generation curtailment is presented in Section 3. Simulation results and the analysis are discussed in Section 4. Finally, several concluding remarks are provided in Section 5.

2. Generation Curtailment Relief with BESS

This chapter explains how the application of BESS for transient stability improvement can relieve the generation curtailment. To obtain the insight transient stability, equal-area criterion (EAC) with a single machine infinite bus (SMIB) equivalent model is usually considered [1,2]. The swing equation for the SMIB system with classical machine model is as follows:
2 H ω R d 2 δ d t 2 = P m P e ( δ ) = P a
where P a is the accelerating power, H is the per unit inertia constant, and ω R is the rotor angular speed. The mechanical input of the generator ( P m ) is assumed to be constant, while the electrical output ( P e ) is a function of the rotor angle ( δ ) . The electric output has different values in every sub-process. P e 0 ( δ ) , P e 1 ( δ ) and P e 2 ( δ ) represent Pe at the pre-fault, during fault and post-fault conditions, respectively.
Figure 1 depicts the concept of EAC in terms of transient stability. Before the occurrence of the fault, mechanical input of the generator is equal to the electrical output P e 0 ( δ ) , and the synchronizing is maintained at the stable operating point (δ0). When a large disturbance occurs in the external system, line impedance increases resulting in electrical output of the generator suddenly decreases from the initial balanced power by a certain amount depending on the severity of the fault. The power imbalance causes an increase in the rotor angle from δ 0 along the curve of P e 1 ( δ ) with a positive value of P a . During the fault, the inertial energy of the corresponding generator is accumulated by the angular acceleration of the rotor. If the accelerated energy, A 1 , in Figure 1, can be resolved by the decelerated energy, A 2 , resulting from the restored power transmission after fault-clearing; and, hence, the synchronism is regained, and the system is said to be stable. The impedance between the generator and infinite bus will change again, leading to an increased level of the electrical output to P e 1 ( δ ) . When A 2 is less than A 1 because of high loading or not enough transmission in the post-fault condition, adequate countermeasures need to be devised to stabilize the system.
To improve transient stability, several countermeasures can be considered. In the stage of operation and operational, applying generation curtailment and tripping critical generators are practically applicable. Generation curtailment is to reduce the generation level of the critical generators in the normal operation state, so it is regarded as a precautionary measure. If their generation costs are comparatively cheap, the action of curtailment might increase the total operation cost. Thus, the action of tripping critical generators would be more economical because it is taken when the corresponding events actually happen.
If the generation amount from the region of interest is too high considering transmission capability after critical events, tripping action might not resolve all the security issues in terms of both transient and frequency stability. The east coast region of the Korean power system experiences this problem, because of the lack of transmission system considering the generation level. The east coast region has two 345 kV routes and one 765 kV route to transfer the generation to the external region, and they are all double-circuited. When a two-circuit tower outage is applied to the 765 kV route, the scheme of generation tripping is required for transient stability and the tripping amount is determined for the peak load system. However, if the same amount of tripping is performed in the lightly loaded condition, the minimum point of the system frequency during transient might be lower than the pick-up value of the first stage of UFR setting. Therefore, a combined countermeasure with generation tripping and generation curtailment needs to be established.
This section focuses on the relief of generation curtailment with BESS application, assuming that the tripping scheme is given. Applying generation curtailment by reducing P m basically reduces the accumulated kinetic energy of the critical generators, A 1 , during the fault. If the curtailed amount is enough to satisfy the EAC, the problem of stepping out can be resolved. As mentioned above, however, generation curtailment might degrade economical operation. Thus, reducing the amount of curtailment is desirable, and the installation of BESS for stability improvement and curtailment reduction can be employed by using their fast responding characteristic of absorbing the kinetic energy of the critical generators after the fault. This action can increase the decelerated energy, A 2 , and, hence, it can secure transient stability.
An EAC illustration that considers generation curtailment and BESS charging action changes is presented in Figure 2. Applying these two countermeasures yield the new operating point, the accelerated area, and the decelerated area as with δ0, A 1 , and A 2 , respectively. Besides, from Figure 2, one can notice that the generation curtailment can be exchanged with the charging operation of the BESS. When the capacity of BESS is limited, both actions can be included in the designed scheme for transient stability.
By reviewing the EAC, one can notice that the relief of generation curtailment results the deceleration area becoming lower than the accelerated area, so that a certain action is needed to compensate the unfulfilled deceleration area for stability. The required additional deceleration energy can be provided by the action of BESS charging, which operates after the action of fault clearing. The required amount of BESS power for transient stability would be proportional to the relieved capacity of the generation curtailment, which can be further expressed as follows.
Δ P c u r t = P c u r t , 0 P c u r t , B E S S
P c u r t , k = δ 0 δ n ( P m P e P B E S S )   d δ
R e f f = Δ P c u r t P B E S S
where Δ P c u r t represents the relieved amount of the generation curtailment for the generator, which is the difference between the generation curtailment before and after applying the BESS strategy ( P c u r t , 0 and P c u r t , B E S S ). It is obvious that the effectiveness of the BESS action is slightly less than that of generation curtailment because it is a corrective measure and there is an electrical distance between the generator and BESS. As in (4), R e f f is the ratio of the possible relief of generation curtailment to the power of BESS.

3. Control Strategy of BESS for Relief of Generation Curtailment

This section depicts control strategies of BESS that can be adopted to relief the amount of curtailing generation by absorbing the excessive kinetic energy of the critical generators during disturbances.

3.1. Transient Stability Problem in the East Coast Region in the Korean Power System

The east coast region in the Korean power system poses a problem of transient stability. Figure 3 illustrates the structure of the region. As in Figure 3, there are three interface routes between the east coast region and the external system. The routes are all two-circuited; routes #1 and #2 are 345 kV, and route #3 is 765 kV. Each line in route #1 and route #2 has rating of 2173 MVA, while in route #3 each line rating is 7290 MVA. The critical fault that might cause transient instability in the east coast region is a tower outage on route #3 that results in a severe reduction in transfer capability to the external system, and the transfer capability cannot cover the fault current. Thus, after tripping the faulted lines, the kinetic energy and rotor angles of those generations in the region are dramatically increased without taking any control actions for transient stability. The action of generation tripping for transient stability is realized by a Special Protection Scheme (SPS). Thus, it applies not only at the peak load level, but also at the lightly load level in the event of the corresponding fault. When the amount of generation tripping is applied to the system with 60% and 70% load level, the system frequency might fall below the first pickup level of UFR operation in the system. This kind of load interruption, however, is prohibited by the Korean power system reliability criteria [5], so if the operation of UFR might happen in the situation, another countermeasure should be devised, considering both transient and frequency stability.
Then the tripping amount needs to be reduced to get the minimum transient frequency increased, possibly less than the pickup level, and for this purpose, generation curtailment is adopted in the normal state. The units for generation tripping are nuclear power plants, but those for generation curtailment are coal-fired. The reason is that, in the regulation, nuclear power plants should be operated with a non-governor operation. Thus, the action of curtailing more generation is needed for transient stability with the reduced generation tripping. Then the minimum transient frequency gets increased, which is higher than the UFR pickup level after the corresponding contingency in lightly loaded conditions.

3.2. Hybrid Control Strategy for BESS Application

This paper adopts a hybrid control strategy for BESS application to relieve the amount of curtailing generation. As in Figure 3, when the event of the 765 kV interface fault happens in the east coast region, kinetic energy of the generators in the region gets increased because of the limited transfer capability of the other 345 kV interface routes. It is obvious that, in the situation, bus frequencies in the region also get increased before the required control actions are taken. Thus, a frequency-response-based control strategy can be employed for BESS. From the viewpoint of transient stability improvement, it is desirable to operate the control strategy as soon as the event happens. As another BESS control strategy, therefore, a method based on special protection scheme can be established. The first one is similar to frequency regulation, which determines the charging amount by using the frequency deviation. The other one is one type of SPS. When the predefined outage happens in the system, the activation signal of charging control is sent to BESS.
Figure 4 illustrates the hybrid control strategy, combining the two strategies for the BESS application to stability improvement proposed in this paper. From Figure 4, one can notice that the primary control strategy is the event-based constant charging action where the control strategy is presented in the control block of fixed charge operation. When applying the frequency-response-based control strategy shown in the frequency response operation control block, there exists a time-delay to capture bus frequency values at BESS locations. The time-delay comes from using a moving average to determine bus frequency as well as the communication time-delay between power conditioning systems (PCSs) and power management systems (PMSs) of BESS [16]. Then the total time delay is around 300 ms. For transient stability improvement, the fast charging action of BESS is desirable to absorb the excessive kinetic energy of the region and hence to ensure transient stability of the east coast region. Thus, the event-based constant charging control is chosen as the primary strategy.
The first stage of the scheme using the event-based constant charging is to ensure transient stability with the defined power output of the BESS within a short period of time after fault. In the simulation study, a 1 s power injection is adequate. Then the BESS control is switched to the second stage for frequency regulation support, using a frequency-response operation scheme. As in Figure 3, when the 765 kV interface fault occurs, the action of generator tripping is activated with SPS, and the tripping amount about 2.5 GW. This action might cause a deep frequency drop, especially in the lightly loaded condition. The BESS action for frequency regulation support can relieve the amount of generation curtailment by the frequency drop after the event in the east coast. The impact of the action on the amount of relief of generation curtailment is stated in the next chapter.

3.3. Procedure to Evaluate the BESS Impact on Relief of Generation Curtailment

In the cases where transient stability is not secured by applying the generation tripping amount, additional countermeasures are further needed, such as generation curtailment in the study region. The generation curtailment can be replaced by the power injection of BESS, even though it is taken after the event actually happens because of its fast responding capability. To examine the hybrid control action of BESS on transient stability, the procedure performed in the study is given below, in Figure 5.
Step 1:
The initial generation curtailments are applied to the peak and off-peak load condition data.
Step 2:
The fault of the 765 kV interface is applied
Step 3:
Fault clearing is performed a few cycles after the fault occurs. For 765 kV lines, the typical fault clearing time (CT) is 5 cycles, but CT with 4.5 cycles is applied for some critical cases.
Step 4:
The capability of the BESS action is examined as an alternative to the generation curtailment. The action starts 3 cycles after the fault clearing, considering detection time, communication time, and the preparation time for BESS operation.
Step 5:
Then generator tripping is taken 4 cycles after the fault clearing. To the peak and off-peak load data, the same amount of generation tripping is applied.
Step 6:
Thyristor controlled series compensators (TCSC) equipped on the other 345 kV interfaces change their compensation level from 50% to 70%. This is called boost-up control, and it is applied 3 cycles after tripping generation. For the peak and off-peak load data, it checks whether the system is secured when applying the generation tripping amount and generation curtailment. If not secured, it increases the curtailment amount and repeats the simulation.
Step 7:
For the peak and off-peak load data, it checks whether the system is secured when applying the generation tripping amount and generation curtailment. If not secured, it increases the curtailment amount and repeats the simulation.
Step 8:
If transiently secured, it checks whether the minimum transient frequency in the off-peak condition is over the pick-up value of UFR setting considering the margin. If there is no violation of the criteria, it outputs the results and ends; otherwise, it increases the tripping amount for the peak and off-peak load data and repeats the simulation.

4. Study Results

In this paper, a dynamic time simulation study was carried out by using PSS/E [17] to examine the effect of BESS on transient stability after a large disturbance on the 765 kV interface for the east coast. For the simulation, the system models were the modified KEPCO 2019 network data with 100% and 60% load level by adding BESS located near the generation complex in east coast region. For BESS, CBEST model was adopted in PSS/E for the dynamic model of BESS, as shown in Figure 6. Output of BESS control strategy ( P B E S S ) , as in Figure 4, is used as the input signal of CBEST-based BESS dynamic model. Furthermore, the hybrid control block for BESS, as detailed in Figure 5, was implemented based on the imbedded Python in PSS/E.

4.1. Application of Conventional Countermeasures for Transient Stability

Pertaining to transient stability after a large disturbance, as mentioned in the previous section, generation tripping and curtailment are main countermeasures usually taken in system operation. Of them generation tripping is considered as more economical, but its effect on system frequency should be examined. Figure 7 shows the system frequency curves when the 3.5 GW and 2.5 GW generation tripping is applied to a lightly loaded system. To stabilize the transient stability, 2.5 GW generation tripping needs to be combined with 1.369 GW generation curtailment.
From Figure 7, one can notice that the system frequency with 2.5 GW generation tripping is above the pickup frequency level and hence that the event does not cause the UFR operation. The pickup frequency level of the 1st stage of UFR in the system set to 59.0 Hz, but in the simulation, the margin of 0.2 Hz is adopted as in Korean power system reliability criteria [5]. Thus, the simulation of this study takes tripping generation with 2.5 GW in the east coast region after the occurrence of a fault on the 765 kV interface to the east coast region, as illustrated in Figure 3. The generation tripping amount indeed affects the required amount of generation curtailment.
Figure 8 shows the result of transient stability simulation for those cases with adjusting fault clearing time when applying the conventional countermeasures. Basically, fault clearing time (CT) for 765 kV lines is five cycles after the event, but CT of 4.5 cycles was also applied to unstable cases. By only applying the generation tripping of 2.5 GW, the system was unstable in first-swing. Then, the additional countermeasure with generation curtailment was taken, and 200 MW and 250 MW were examined for the amount of curtailing in the simulation. When using CT of five cycles for the event, critical generators in the east coast region experienced a stepping out with 2.5 GW tripping and 200 MW curtailment. However, when CT was changed to 4.5 cycles, transient stability was secured. In the case of taking 2.5 GW tripping and 250 MW curtailment, the system was transiently stable.
If one or more BESSs are installed in the region, then the hybrid control action of BESS can absorb the excessive kinetic energy of the critical generators and hence can stabilize the system for the case with 200 MW curtailment; in other words, it can replace the amount of generation curtailment for the stable case with 250 MW curtailment even though the control signal is sent to BESS throughout a certain SPS after the event happens. Then, the issue is the ratio of BESS injection capacity to the relieved amount of generation curtailment. Section 4.3 provides the simulation results on the issue.

4.2. Impact of BESS Control Strategies

In the study, several control strategies were examined to determine the adequate control strategy for stability enhancement with BESS to replace the generation curtailment. This subsection describes the study results on that issue. In the study, the examined control strategies for BESS were modeled with Python imbedded in PSS/E, and the signals were given to the output of the active power part of CBEST model.
The strategies examined in the study were (i) constant power charging, (ii) frequency responsive and (iii) hybrid ones. From the time when the BESS power injection command is delivered, numerical integration is performed by the imbedded Python according to each corresponding control block in the model, and the integration time step is 0.5 cycles for the BESS simulation. It is assumed that the input for frequency responsive control uses the bus frequency in which the BESS is installed. For all the strategies, the BESS capacity was assumed to be 160 MW, which corresponds to the minimum required capacity for system stabilization. Figure 9 shows the results of applying the constant charging strategy.
In this simulation, the effect of the ramp-rate to reach the maximum output of the BESS was examined. The ramp-rates were varied from one cycle to four cycles. From the simulation result shown in Figure 9, one can notice that system stability could be secured when the ramp-rate to reach 160 MW for the BESS was one or two cycles. However, if the ramp-rate period time was three or four cycles, the system might be unstable, because the accelerated energy of the critical generators during the fault was not absorbed by the BESS within the required time delay.
The second strategy examined in the simulation is frequency responsive one, and it is similar to droop control for primary frequency regulation (PFR) [18]. The difference of the strategy from PFR is that it includes the block for checking the initial rate of change of frequency (ROCOF), and it activates the frequency responsive action by the BESS if the absolute value of ROCOF is greater than the threshold value. The threshold value is usually set to the one the system responds to when a generating unit with 500 MW is tripped. In this simulation, the event includes the tripping with a large amount generation for stabilization, so the impact of droop gain change was evaluated. Figure 10 presents the comparison of BESS transient stability effect when the droop gain is adjusted from 100 to 400 for a 160 MW-BESS. That is, it tried to verify what the required droop gain for transient stability. The required droop gain for stability is 300. The droop gain can be defined as a specific value that affects the relation between active power and frequency change rate of the BESS.
The last strategy tested in the simulation is the hybrid one, as described in Figure 4. Figure 11 shows the simulation result of the hybrid BESS control strategy.
Right after the system experiencing the event, the BESS applies a constant charging control for one second to absorb the accelerated energy in the study region, and then it is followed by the frequency responsive strategy to reduce the frequency decrease resulting from the large amount generation tripping. Figure 11 illustrates an outperforming improvement by the hybrid strategy from the other strategies in terms of frequency recovery. The transient stability after the fault was secured by using the constant charging of the 160 MW-BESS for one second. By applying frequency response control afterward, the frequency level is well-maintained even though the droop gain is lower than 300.

4.3. Relief Effect of Generation Curtailment by the Large-Capacity BESS Application

The sum of the rated power of those generators for curtailment operation in the east coast region is 2 GW (1 GW per unit), which is near the power plant for tripping. If the curtailment to the corresponding generators is not enough in the normal state, the required amount of generator tripping is increased for stabilization after the event, and, hence, it might decrease the minimum transient frequency in the lightly loaded system. With the fixed amount of tripping possible, to relieve the curtailment amount in the normal state, the BESS capacity needs to be increased because it can replace the curtailment. With such a concept, the main question is what the ratio of the possible relief of generation curtailment to the BESS capacity is, satisfying stability.
Figure 12 illustrates the simulation results of examining the minimum amount of generation curtailment to secure the transient stability, while increasing the BESS capacity. It verifies the reduction of required generation curtailment due to the increase of the BESS capacity. In addition, the ratio of generation curtailment reduction to the BESS capacity, as an index, can be found in Table 1.
As BESS output increases by 20 MW, the required generation curtailment gradually decreases while the transient stability can be maintained. In the simulation case, the net generation curtailment 130 MW without the BESS action. Considering the economy of installation and operation of the BESS equipment, it is noted that the relief effect of the generation curtailment can be maximized when the BESS output is below 40 MW. If the operating capacity of the BESS exceeds 60 MW, the ratio of the generation curtailment relief to the BESS capacity is slightly lowered.
From the simulation results of this section, one can notice that using the quick responding capability of BESS, system transient stability can be improved and the amount of generation curtailment can be relieved. In application of BESS to systems for stability improvement, the stage of charge needs to be kept within an adequate range when the BESS is in the idle mode, and the signal activating the BESS action for the event should be carefully determined, taking into account certain duplicate conditions with adequate relays.

5. Conclusions

This paper presents the BESS application for improving transient stability of Korean power system. To secure the system stability, generation curtailment is usually taken with the limited generator tripping to prevent low-frequency decline in lightly load system conditions. The relief of generation curtailment in the normal state is desirable, so a BESS control scheme was devised to replace the generation curtailment in this paper. The proposed control scheme is a hybrid one combining the constant charging action and frequency responsive one. The constant charging action can be realized as a form of SPS, and it needs to be sustained in a proper time period of 1 s to absorb the excessive kinetic energy of critical generators in the study region. Then the frequency-responsive action follows it to keep the frequency level. The simulation results described in this paper can verify that the BESS control can replace the generation curtailment in the normal state with the fixed generation tripping. Moreover, the performances of possible BESS control strategies were compared and observed, and among them, the hybrid control can provide the best performance. Based on these results, it is expected that the system operation can be optimized by using BESS facilities for stability improvement, which guarantees transient stability and minimizes the generation curtailment. In future works, more detailed operational control strategies for the stability improvement application will be devised, including key parameter settings of the BESS and the coordination control with the BESSs for the other applications.

Author Contributions

H.B. and D.R.A. surveyed the backgrounds of this research, designed the control strategies, and performed the simulations to show the benefits of the proposed method. H.S. supervised and supported this study. All authors have read and agreed to the published version of the manuscript.

Funding

This research was partly supported by the research fund of KEPCO, and partly supported by Basic Science Research Program through the National Research Foundation of Korea (NRF) funded by the Ministry of Education (NRF-2019R1A6A1A03032119).

Institutional Review Board Statement

Not applicable.

Informed Consent Statement

Not applicable.

Data Availability Statement

Not applicable.

Conflicts of Interest

The authors declare no conflict of interest.

References

  1. Kundur, P. Power System Stability and Control; McGraw-Hill: New York, NY, USA, 1994. [Google Scholar]
  2. Vittal, V.; McCalley, J.D.; Anderson, P.M.; Fouad, A.A. Power System Control and Stability, 3rd ed.; IEEE Press: Newark, NJ, USA, 2019. [Google Scholar]
  3. Kundur, P.; Paserba, J.; Ajjarapu, V.; Andersson, G.; Bose, A.; Canizares, C.; Hatziargyriou, N.; Hill, D.; Stankovic, A.; Taylor, C.; et al. Definition and classification of power system stability IEEE/CIGRE joint task force on stability terms and definitions. IEEE Trans. Power Syst. 2004, 19, 1387–1401. [Google Scholar]
  4. IEEE PES Power System Dynamic Performance Committee. Stability Definitions and Characterization of Dynamic Behavior in Systems with High Penetration of Power Electronic Interfaced Technologies; Technical report PES-TR77; IEEE Power & Energy Society: Piscataway, NJ, USA, 2020. [Google Scholar]
  5. MOTIE. Power System Reliability and Electricity Quality Criteria; MOTIE: Sejong-si, Korea, 2020.
  6. Lachs, W.; Sutanto, D. Application of battery energy storage in power systems. In Proceedings of the 1995 International Conference on Power Electronics and Drive Systems, Singapore, 21–24 February 1995; Volume 2, pp. 700–705. [Google Scholar]
  7. Rahmani, F.; Payam, N.; Tanushree, A.; Mohammadreza, B. Gallium Nitride Inverter Design with Compatible Snubber Circuits for Implementing Wireless Charging of Electric Vehicle Batteries. Machines 2020, 8, 56. [Google Scholar] [CrossRef]
  8. EPRI. Electricity Energy Storage Technology Options; EPRI Report; EPRI: Palo Alto, CA, USA, 2010. [Google Scholar]
  9. Eyer, J.; Corey, G. Energy Storage for the Electricity Grid: Benefits and Market Potential Assessment Guide, A Study for the DOE Energy Storage Systems Program; SANDIA Report: SAND2010-0815; Sandia National Laboratories: Albuquerque, NM, USA; Livermore, CA, USA, 2010. [Google Scholar]
  10. Zhao, H.; Wu, Q.; Hu, S.; Xu, H.; Rasmussen, C.N. Review of energy storage system for wind power integration support. Appl. Energy 2015, 137, 545–553. [Google Scholar] [CrossRef]
  11. Faisal, M.; Hannan, M.A.; Ker, P.J.; Hussain, A.; Mansor, M.B.; Blaabjerg, F. Review of Energy Storage System Technologies in Microgrid Applications: Issues and Challenges. IEEE Access 2018, 6, 35143–35164. [Google Scholar] [CrossRef]
  12. Liua, J.; Hu, C.; Kimbera, A.; Wang, Z. Uses, Cost-Benefit Analysis, and Markets of Energy Storage Systems for Electric Grid Applications. J. Energy Storage 2020, 32, 101731. [Google Scholar] [CrossRef]
  13. Khanna, R.; Singh, G.; Nagsarkar, T.K. Power system stability enhancement with SMES. In Proceedings of the International Conference on Power, Signals, Controls and Computation, Kerala, India, 3–6 January 2021. [Google Scholar]
  14. Kim, S.-K.; Song, H.; Yoon, T.-W. Damping improvement and terminal voltage regulation for a synchronous machine using an energy storage device. Int. J. Electron. 2015, 102, 582–598. [Google Scholar] [CrossRef]
  15. Kiaei, I.; Lotfifard, S. Tube-Based Model Predictive Control of Energy Storage Systems for Enhancing Transient Stability of Power Systems. IEEE Trans. Smart Grid 2018, 9, 6438–6447. [Google Scholar] [CrossRef]
  16. Han, J.B.; Kook, K.S.; Chang, B. A Study on the Criteria for Setting the Dynamic Control Mode of Battery Energy Storage System in Power Systems. Trans. Korean Inst. Electr. Eng. 2013, 62, 444–450. [Google Scholar] [CrossRef] [Green Version]
  17. PSS/E 33. 5 Program Application Guide; Siemens PTI: Schenectady, NY, USA, 2013; Volume 2. [Google Scholar]
  18. Greenwood, D.M.; Lim, K.Y.; Patsios, C.; Lyons, P.F.; Lim, Y.S.; Taylor, P.C. Frequency response services designed for energy storage. Appl. Energy 2017, 203, 115–127. [Google Scholar] [CrossRef]
Figure 1. Illustration of equal area criterion (EAC).
Figure 1. Illustration of equal area criterion (EAC).
Energies 14 03898 g001
Figure 2. EAC with the generation curtailment and BESS.
Figure 2. EAC with the generation curtailment and BESS.
Energies 14 03898 g002
Figure 3. East coast region in the Korean power system.
Figure 3. East coast region in the Korean power system.
Energies 14 03898 g003
Figure 4. The proposed BESS hybrid control block.
Figure 4. The proposed BESS hybrid control block.
Energies 14 03898 g004
Figure 5. Evaluation procedure of generation curtailment relief using BESS.
Figure 5. Evaluation procedure of generation curtailment relief using BESS.
Energies 14 03898 g005
Figure 6. CBEST-based BESS dynamic model.
Figure 6. CBEST-based BESS dynamic model.
Energies 14 03898 g006
Figure 7. System frequency curves with the 3.5 and 2.5 GW generation tripping (60% load level).
Figure 7. System frequency curves with the 3.5 and 2.5 GW generation tripping (60% load level).
Energies 14 03898 g007
Figure 8. Examination of transient stability with different control measures.
Figure 8. Examination of transient stability with different control measures.
Energies 14 03898 g008
Figure 9. Performance of the constant charging strategy with different ramp-rates.
Figure 9. Performance of the constant charging strategy with different ramp-rates.
Energies 14 03898 g009
Figure 10. Performance of a frequency response BESS by varying the droop gain.
Figure 10. Performance of a frequency response BESS by varying the droop gain.
Energies 14 03898 g010
Figure 11. Performance of a hybrid control BESS with different frequency response droop gain.
Figure 11. Performance of a hybrid control BESS with different frequency response droop gain.
Energies 14 03898 g011
Figure 12. Relief effect of generation curtailment using BESS.
Figure 12. Relief effect of generation curtailment using BESS.
Energies 14 03898 g012
Table 1. Performance of a hybrid control BESS to relieve generation curtailment.
Table 1. Performance of a hybrid control BESS to relieve generation curtailment.
BESS Capacity (MW)020406080100120140160
Required Generation Curtailment (MW)1301109080604030100
Generation Curtailment Relief (MW)02040507090100120130
Ratio of Generation Curtailment Relief (%)010010083.387.590.083.385.781.3
Net Generation Curtailment Relief = 130 MW.
Publisher’s Note: MDPI stays neutral with regard to jurisdictional claims in published maps and institutional affiliations.

Share and Cite

MDPI and ACS Style

Bang, H.; Aryani, D.R.; Song, H. Application of Battery Energy Storage Systems for Relief of Generation Curtailment in Terms of Transient Stability. Energies 2021, 14, 3898. https://doi.org/10.3390/en14133898

AMA Style

Bang H, Aryani DR, Song H. Application of Battery Energy Storage Systems for Relief of Generation Curtailment in Terms of Transient Stability. Energies. 2021; 14(13):3898. https://doi.org/10.3390/en14133898

Chicago/Turabian Style

Bang, Hyeongpil, Dwi Riana Aryani, and Hwachang Song. 2021. "Application of Battery Energy Storage Systems for Relief of Generation Curtailment in Terms of Transient Stability" Energies 14, no. 13: 3898. https://doi.org/10.3390/en14133898

APA Style

Bang, H., Aryani, D. R., & Song, H. (2021). Application of Battery Energy Storage Systems for Relief of Generation Curtailment in Terms of Transient Stability. Energies, 14(13), 3898. https://doi.org/10.3390/en14133898