Optimization of Intermittent Production Well Strategy in Jingbian Gas Field

1
The First Natural Gas Plant, PetroChina Changqing Oilfield Company, Jingbian 718500, China
2
MOE Key Laboratory of Petroleum Engineering, China University of Petroleum, Beijing 102249, China
*
Author to whom correspondence should be addressed.
Processes 2025, 13(7), 2170; https://doi.org/10.3390/pr13072170
Submission received: 9 May 2025 / Revised: 1 July 2025 / Accepted: 3 July 2025 / Published: 7 July 2025
(This article belongs to the Section Chemical Processes and Systems)

Abstract

As a crucial natural gas production base in China, the Jingbian Gas Field has gradually entered its mid-to-late development stage with prolonged exploitation. The increasing number of intermittent production wells and reliance on empirical settings for single-well opening/shut-in durations have resulted in low production efficiency and high energy consumption. Concurrently, concentrated intermittent production across multiple wells frequently triggers severe pressure fluctuations in the pipeline network, jeopardizing overall field production stability. Achieving cost reduction and improved efficiency through single-well intermittent production optimization and staggered production scheduling for multi-well systems has become a critical challenge in this late-development phase. The absence of flow meters in most Jingbian wells introduces substantial difficulties in adjusting both single-well operating durations and multi-well staggered production schedules. This study first introduces a novel coefficient D inspired by the load factor concept, proposing a methodology to adjust opening/shut-in durations using only tubing pressure, casing pressure, and pipeline delivery pressure. Second, a dynamic workflow is developed for staggered multi-well production scheduling to mitigate pressure surges caused by simultaneous well restarts. Field applications demonstrate that optimized single-well operations achieved steady efficiency improvements, with the average tubing–casing pressure differential in severe liquid-loading wells decreasing by 80% post-adjustment. The staggered multi-well scheduling ensures that no two or more wells (n > 1) restart simultaneously, significantly enhancing the stability of the gas transmission network. These findings provide theoretical and technical guidance for the efficient development of similar low-pressure gas fields.

1. Introduction

With the deepening implementation of China’s “Dual Carbon” strategy, the nation has explicitly proposed to intensify natural gas exploration and development [1]. In the era of intelligent gas fields, remote well control systems have been widely implemented across the Jingbian Gas Field [2]. However, two persistent challenges remain: the reliance on manual judgment for determining intermittent production timing of individual wells and the suboptimal effectiveness of multi-well control. The Jingbian Gas Field is situated in the northeastern section of the ancient central uplift zone within the Ordos Basin. It serves as a crucial gas source for the West–East Gas Pipeline Project. The Jingbian Gas Field boasts abundant cumulative proven geological reserves. The main producing zones of the Jingbian Gas Field are characterized by stable sedimentation, layered distribution, low porosity and permeability, low abundance, large areal extent, moderate-to-low productivity, deep burial depth, unconventional nature, and strong reservoir heterogeneity.
Currently, there are 263 intermittent production wells in the Jingbian Gas Field. Well opening and closing operations are remotely controlled, while production parameters (e.g., flow rates, shut-in durations) are manually adjusted. None of the production wells in Jingbian Gas Field are equipped with gas flow meters, but are only installed with tubing pressure gauges and casing pressure gauges. To date, 59 wells (22% of the total) exhibit improperly configured production parameters or untimely adjustments to their operating schedules. As production progresses, the number of gas wells requiring intermittent production operations continues to rise annually, leading to a significant surge in workload for parameter optimization. However, due to a limited workforce, the number of wells with suboptimal production schedules and delayed adjustments is gradually increasing. This often results in failures to timely open low-productivity wells to release production potential when reservoir pressure is high, or to promptly shut in wells to restore pressure when reservoir pressure is low. There is an urgent need to implement intelligent solutions for rapidly determining optimal well-opening/shut-in schedules for intermittent production wells.
Additionally, intermittent production wells in the Jingbian Gas Field exhibit higher gas production rates during the initial opening phase. With the increasing number of intermittent wells, there is a heightened risk of multiple wells opening simultaneously within a specific timeframe. This causes significant fluctuations in gas gathering station pressure and flow rates, adversely impacting the operation of compressors and dehydration skids, and frequently leading to surface overpressure issues. In severe cases, this can trigger production shutdowns. To ensure optimal utilization of production capacity across all gas wells, it is critical to implement a staggered well opening/closing schedule for intermittent production wells, thereby mitigating pressure instability across the surface network.
Gao et al. implemented automatic intermittent production in gas wells by installing various control valves, including pneumatic diaphragm valves, electrically controlled needle valves, and high/low-pressure shut-off valves, based on a comprehensive analysis of production rates, pressure data, and geographical conditions. The intermittent production schedule issued by the gas well control platform is transmitted to the wellsite via network, where the Remote Terminal Unit (RTU) receives signals to control wellhead valves for opening/shut-in operations, significantly reducing technicians’ workload. However, it fails to explicitly propose optimization methods for intermittent production schedules [3]. Zhang et al. proposed an optimization method for intermittent production by analyzing wellhead pressure characteristics during shut-in phases. They suggested determining optimal opening timing through inflection points in tubing pressure recovery curves, while identifying shut-in timing through peak points in daily gas production variation curves, aiming to maximize average daily gas production. However, its classification relies solely on production rates and casing pressure, neglecting the impacts of tubing pressure and tubing–casing pressure differentials [4]. Ma et al. optimized plunger-lifted intermittent well schedules using load coefficient (defined as the difference between casing pressure and tubing pressure during shut-in divided by the difference between tubing pressure and pipeline pressure). Their research indicated optimal opening occurs when the load coefficient ranges between 0 and 0.3. However, it disregards scenarios of inefficient liquid unloading and wellbore liquid accumulation in gas wells [5]. Lin et al. developed an intermittent production optimization model for plunger-lift wells based on shut-in duration and casing pressure increments. The system cyclically operates by initiating production when the load coefficient reaches specified thresholds and shutting in when casing pressure increases and meets predetermined criteria. However, it does not provide computational methods for quantifying casing pressure buildup rates across different intermittent producers [6]. Xia et al. investigated plunger-lift intermittent production systems, revealing that formation pressure exhibits a positive correlation with plunger cycle duration. Reduced formation pressure prolongs plunger ascent time and pressure restoration periods. Increased liquid-gas ratio shortens both production time and plunger cycles while decreasing periodic gas production. Notably, plunger lift operation becomes unsustainable when the liquid–gas ratio exceeds critical values. However, the proposed fixed casing pressure buildup value of 0.1 MPa is inapplicable to intermittent wells with higher baseline casing pressures [7].
The peak-shifting group control of intermittent production wells constitutes a large-scale scheduling optimization problem, with the most effective solutions involving mathematical approaches such as Mixed-Integer Linear Programming (MILP) models and Mixed-Integer Nonlinear Programming (MINLP) models. Zhang et al. proposed a three-stage stochastic programming method for LNG supply issues, establishing a multi-scenario MILP model under constraints of delivery modes, quantities, vehicles, timelines, and infrastructure construction, thereby providing a systematic approach for LNG supply system development [8]. Heungjo et al. addressed maritime transportation challenges by developing an integrated short-term scheduling MILP model, resolving the economic and stable operation of closed-loop transportation systems for scheduling tankers from petrochemical plants to international ports [9]. Zhang et al. formulated an MILP model for large-scale single-truck well cluster transportation scheduling optimization, achieving transportation cost minimization [10]. Gao et al. proposed a multi-period Mixed-Integer Nonlinear Programming (MINLP) model addressing the integrated planning of well operation and flow assurance, achieving total operational cost minimization in oilfields [11]. Liang et al. developed a single-source multi-pump station product pipeline MINLP model for multi-pump station pipeline flow problems, comprehensively reducing pipeline scheduling costs [12]. Tan et al. analyzed liquid supply insufficiency in cluster wells of low-permeability reservoirs during middle-late development stages, identifying potential gathering pipeline over- or under-dimensioning caused by intermittent production. They established an MINLP model targeting minimum energy consumption with total production constraints, optimizing intermittent production effectiveness for cluster wells [13]. Despite extensive research on large-scale scheduling algorithms, studies on staggered peak-shaving group control for intermittent production wells remain limited.
This paper addresses challenges in intermittent production wells at Jingbian Gas Field. On one hand, drawing from the load coefficient concept in plunger-lifted intermittent production wells, a novel z-coefficient is proposed to categorize these wells, with determination criteria established for optimal opening and shut-in timing for each classification. On the other hand, considering the practical absence of flow meters in these wells, a peak-shifting group control method is developed, prohibiting the simultaneous opening of n (n > 1) wells within identical timeframes, along with formulated peak-shifting principles and operational procedures. Field implementation of single-well intermittent production schedule optimization and multi-well group control optimization has achieved significant improvements in Jingbian Gas Field.

2. Optimization of Intermittent Production Well Opening–Closing System in Jingbian Gas Field

2.1. Determination of D Factor for Intermittent Production Well

In the formulation of well opening–closing schedules for plunger gas lift intermittent production wells, the load factor serves as a critical parameter for determining optimal switching timing. This coefficient is conventionally employed to evaluate gas well energy recovery status, predict plunger arrival at wellhead, and verify successful liquid unloading, thereby establishing appropriate opening duration for plunger-assisted intermittent production. Given the similarities in liquid unloading characteristics between conventional intermittent wells and plunger-assisted intermittent wells in Jingbian Gas Field, this study proposes a modified coefficient D by substituting casing pressure (CP) in the denominator of traditional load factor with tubing pressure (TB), based on field practice experience.
The new coefficient D is defined as the ratio of casing-tubing pressure differential to tubing–pipeline pressure differential prior to well opening, as expressed in Equation (1):
D = P casing   pressure P tubing   pressure P tubing   pressure P pipeline   pressure

2.2. Classification of Intermittent Production Well Types Based on D Factor in Jingbian Gas Field

This study collected production data from 54 intermittent production wells in the Jingbian Gas Field, sourced from six-month daily production reports. Each well’s report contains half-hourly records, including tubing pressure, casing pressure, pipeline pressure (PP), and well opening–closing status. Through statistical processing and calculations, key parameters for each production cycle were derived: coefficient D, opening duration, closing duration, casing pressure, tubing pressure, and average tubing–casing pressure differential per cycle. These parameters were integrated into individual dynamic characteristic charts for each of the 54 intermittent production wells. By organizing and categorizing these charts, the intermittent production wells in the Jingbian Gas Field were classified into six distinct categories.
(1)
Type I Intermittent Production Wells
Type I intermittent production wells exhibit stable coefficient D values consistently within the 0.2–0.5 range, with cycle-averaged tubing–casing pressure differential predominantly below 2 MPa. This operational state indicates high liquid unloading efficiency, stable gas–liquid flow regime, timely reservoir energy recharge, and the establishment of a favorable gas-liquid dynamic equilibrium, demonstrating strong stability and high productivity. For example, Well G1 (a representative Type I well) displays the dynamic characteristics shown in Figure 1. The upper panel illustrates casing pressure/tubing pressure variations over time, while the lower panel presents coefficient D/tubing–casing pressure differential trends. This well maintains a mean coefficient D of 0.35 with a fluctuation range of ±0.08, and cycle-averaged tubing–casing pressure differentials between 1.2 and 1.8 MPa, confirming its classification as a typical Type I intermittent production well.
(2)
Type II Intermittent Production Wells
Type II intermittent production wells exhibit coefficient D fluctuations within the 0.15–0.75 range, with cycle-averaged tubing–casing pressure differentials around 2 MPa. This operational state reflects relatively high liquid unloading efficiency, stable gas-liquid flow regime, and sufficient reservoir energy recharge, demonstrating robust stability and significant production capacity. For instance, Well G2 (a representative Type II well) displays dynamic characteristics illustrated in Figure 2. The upper panel shows casing pressure/tubing pressure temporal variations, while the lower panel depicts coefficient D/tubing–casing pressure differential trends. This well maintains a mean coefficient D of 0.45 with fluctuations of ±0.30, and cycle-averaged tubing–casing pressure differentials between 1.6 and 2.2 MPa, confirming its classification as a typical Type II intermittent production well.
(3)
Type III Intermittent Production Wells
Type III intermittent production wells exhibit coefficient D values approaching zero, with cycle-averaged tubing–casing pressure differentials typically around 1 MPa. This operational state reflects exceptionally high liquid unloading efficiency, stable gas–liquid flow regime, and robust production capacity. The extended closing duration indicates potential for operational parameter optimization. For example, Well G3 (a representative Type III well) demonstrates dynamic characteristics shown in Figure 3. The upper panel illustrates casing pressure/tubing pressure temporal variations, while the lower panel displays coefficient D/tubing–casing pressure differential trends. This well maintains a mean coefficient D of 0.04 with fluctuations of ±0.13, and cycle-averaged tubing–casing pressure differentials between 0.5 and 1.5 MPa, definitively classifying it as a typical Type III intermittent production well.
(4)
Type IV Intermittent Production Wells
Type IV intermittent production wells exhibit significantly elevated coefficient D values exceeding 3, with cycle-averaged tubing–casing pressure differentials above 5 MPa. This operational state indicates persistent liquid loading in the wellbore, requiring multiple well-opening–closing schedule adjustments to restore normal dynamic equilibrium. For example, Well G4 (a representative Type IV well) demonstrates dynamic characteristics shown in Figure 4. The upper panel illustrates casing pressure/tubing pressure temporal variations, while the lower panel displays coefficient D/tubing–casing pressure differential trends. After 400 min of operation, through successive schedule adjustments, the well achieved stabilized coefficient D at 0.9 with fluctuations of ±1.1, and cycle-averaged tubing–casing pressure differentials between 2.0 and 3.3 MPa, conclusively identifying it as a typical Type IV intermittent production well.
(5)
Type V Intermittent Production Wells
Type V intermittent production wells demonstrate a progressive increase in coefficient D from baseline (approaching 0) to elevated levels, accompanied by rising cycle-averaged tubing–casing pressure differentials from 0.5 MPa. This operational state signifies cumulative liquid loading in the wellbore, gradually destabilizing gas-liquid flow regimes, and insufficient reservoir energy recharge, manifesting as deteriorating stability and declining productivity, characteristic of progressive deterioration due to delayed anomaly detection. For instance, Well G5 (a representative Type V well) exhibits dynamic characteristics depicted in Figure 5. The upper panel shows casing pressure/tubing pressure temporal variations, while the lower panel tracks coefficient D/tubing–casing pressure differential evolution. This well demonstrates coefficient D escalation from 0 to 3.4, with cycle-averaged tubing–casing pressure differentials increasing from 0.5 MPa to 8 MPa, definitively categorizing it as a typical Type V intermittent production well.
(6)
Type VI Intermittent Production Wells
Type VI intermittent production wells exhibit extreme coefficient D fluctuations (−1 to 2) with cycle-averaged tubing–casing pressure differentials oscillating between 2.5 and 4 MPa. This operational state indicates severe liquid loading, manifested by minimal casing pressure reduction during opening phases and insufficient pressure buildup during closing phases, resulting in attenuated overall CP dynamics. For example, Well G6 (a representative Type VI well) displays dynamic characteristics illustrated in Figure 6. The upper panel depicts CP/TP temporal variations with constrained amplitude, while the lower panel captures violent coefficient D/tubing–casing pressure differential oscillations. This well demonstrates coefficient D fluctuations spanning −1 to 2, accompanied by cycle-averaged tubing–casing pressure differentials varying between 2.5 and 4 MPa, establishing it as a definitive Type VI intermittent production well.

2.3. Optimization of Well Opening–Closing Durations for Intermittent Production Wells

Based on the classification of intermittent production wells in Jingbian Gas Field and incorporating long-term gas well control experience, this study establishes optimal opening/closing timing for different well types and develops automated switching protocols enabling computer-controlled operations based on real-time tubing pressure, casing pressure, and pipeline pressure variations.
(1)
Optimization of Opening Duration for Intermittent Production Wells
Analysis of casing pressure dynamics and liquid loading relationships across multiple wells in Jingbian Gas Field reveals that casing pressure buildup during opening phases directly reflects wellbore liquid accumulation. Building upon prior research, we adopt casing pressure buildup as a critical monitoring index for opening duration determination, with field-specific refinements outlined in the operational workflow detailed in Table 1.
(2)
Optimization of Shut-in Duration for Intermittent Production Wells
Analysis of opening–closing durations across six well types reveals a strong positive correlation between tubing–casing pressure differentials and coefficient D when average casing pressure during opening phases exceeds 3.5 MPa. Specifically, elevated coefficient D values necessitate extended shut-in durations for pressure recovery, while reduced D values allow shortened shut-in durations to enhance production. To operationalize this relationship, we developed a shut-in duration adjustment methodology using coefficient D as the primary control parameter, with cycle-averaged tubing–casing pressure differentials serving as the performance evaluation metric. The detailed adjustment protocol is presented in Table 2.
Within the Jingbian Gas Field’s intermittent production well inventory, two special operational scenarios require distinct handling: wells with severely depleted reservoir pressure and those experiencing acute liquid loading.
For wells with critically low reservoir pressure—typically manifested by sustained average casing pressure below 3.5 MPa during opening phases, indicating severely compromised energy reserves—we established a shut-in duration adjustment methodology using opening-phase CP as the primary control parameter. This field-calibrated approach is detailed in Table 3.
For wells with severe liquid loading, typically manifested by nearly constant tubing–casing pressure differentials throughout both opening and closing phases—exhibiting only transient declines post-opening followed by rapid recovery—effective liquid removal necessitates high-frequency opening operations. Based on field-tested practices, we developed an adjustment strategy focused on shortened opening durations to enhance liquid expulsion efficiency. The detailed protocol is outlined in Table 4.
To mitigate stochastic and transient operational impacts while complying with Jingbian Gas Field’s mandatory safety thresholds, this methodology employs triple-cycle moving averages of the following parameters as monitoring criteria for systematic adjustments: opening–closing durations, tubing–casing pressure differentials during flow phases, coefficient D, casing pressure buildup, and average casing pressure during production cycles.
Compared to Jingbian Gas Field’s existing optimization approach—which relies solely on casing pressure, empirical casing pressure buildup thresholds, and manual experience—the Coefficient D-based systematic method incorporates more comprehensive factors. It achieves refined well-type classifications, delivers customized optimization schemes while reducing manual workloads and human errors. However, this method requires sufficient historical data collection before implementation due to its data dependency.

3. Research on Staggered Peak-Shifting Group Control Methodology for Multiple Wells in Jingbian Gas Field

3.1. Data Acquisition and Preprocessing

Intermittent production wells in Jingbian Gas Field exhibit high initial gas rates during opening phases, making simultaneous activation of multiple wells prone to cause significant pressure and flowrate fluctuations at gas gathering stations, thereby compromising compressor and dehydration skid operations. This necessitates the development of a staggered peak-shifting group control algorithm that coordinates well activation timing while maintaining optimal productivity. The staggered control methodology requires historical production data from individual wells to precisely predict peak-shifting windows, including: production timeline, well status (open/closed), current cycle shut-in duration, current cycle opening duration, elapsed time in current cycle, pipeline pressure, tubing pressure, and casing pressure. The absence of wellhead flow meters precludes the acquisition of instantaneous/cumulative flowrates. Given the dynamic switching status across the well population, the algorithm must prioritize real-time capability through continuous acquisition of system timestamps, well statuses, instantaneous flowrates (if available), and pressure data, ensuring time-sensitive optimization. This study established a dedicated database extracting critical parameters from Jingbian Gas Field’s existing data network platform, with a data polling interval of 10 min. Automated analysis of this dataset enables the derivation of cycle-specific parameters for each intermittent producer.
After confirming data sources and obtaining relevant permissions, real-time data is retrieved via an HTTP connection to the remote TDengine database on the centralized acquisition platform. For data preprocessing, standardized normalization and categorized anomaly handling address data inconsistencies including non-uniform storage formats across Jingbian Gas Field operational areas and abnormal intermittent well behaviors; specifically: production data for individual wells is extracted from separate well tables, and to maintain consistency, all source database time-series data is uniformly collected as analytical inputs. For anomaly processing, 72 h of historical data is secured as the analysis baseline to exclude non-cycled wells (permanently shut-in or flowing). Outliers in production data (e.g., well status “−3” or zero-value sequences) trigger well-level anomaly classification when exceeding a 15% threshold. Additionally, tiered communication failure protocols are implemented: (1) Wells offline for >4 h are treated as anomalies due to real-time data loss and control failure; (2) Wells with >70% missing historical data are classified as communication–failure anomalies.

3.2. Well Opening Time Prediction

When multiple wells exhibit overlapping opening schedules, the control system prioritizes deferral of low-productivity wells while minimizing production loss through constrained extension of individual well shut-in durations. Prior to implementing staggered optimization, 48 h opening time predictions must be generated for each intermittent producer. For every well, the prediction algorithm calculates prospective opening windows within the 48 h horizon based on current status (open/closed), active cycle durations (opening/shut-in), and remaining phase time. This workflow, detailed in Figure 7, generates time-staggered activation schedules that balance peak shaving with production optimization.
During field implementation, discrepancies between recorded and actual opening–closing durations may arise due to network latency in well clusters and valve actuation rate inconsistencies. These errors have been systematically incorporated into our error compensation framework through algorithmic adjustments and real-time calibration protocols within Jingbian Gas Field’s data network platform.

3.3. Staggered Peak-Shifting Group Control Methodology

Simultaneous activation of multiple wells induces pressure and flow rate fluctuations at gas gathering stations. Therefore, well clusters and timestamps generating such peaks are identified as conflict peaks requiring resolution. The control protocol prioritizes deferring low-productivity wells’ opening operations while minimizing shut-in duration extensions to mitigate production impacts.
The staggered peak-shifting group control algorithm requires three critical input parameters: (1) Peak Identification Time Window, defined as the maximum allowable time overlap for concurrent well openings among multiple wells; (2) Maximum Simultaneous Opening Capacity, specifying the permitted number of parallel-activated wells; and (3) Deferred Opening Interval, referring to the mandatory time delay imposed on low-productivity wells when resolving multi-well peak conflicts. The Peak Identification Time Window quantifies the temporal tolerance for synchronized operations, while the Deferred Opening Interval establishes prioritized displacement durations based on well productivity hierarchies.
This study employs an exhaustive enumeration method, systematically iterating through predicted opening schedules to detect and resolve all conflict peaks via temporal displacement. The workflow, as detailed in Figure 8, achieves complete peak elimination through predictive traversal and adaptive rescheduling.
The algorithmic framework initiates by predetermining prospective opening times for all intermittent production wells. Through systematic traversal of each well, those exceeding the Peak Identification Time Window threshold are aggregated into conflict peak sets. This process culminates in a finalized conflict peak set requiring resolution, where each set represents temporally overlapping operations within a defined window.
All wells are prioritized based on measured productivity rankings from Jingbian Gas Field’s single-well tests. During peak resolution, low-productivity wells undergo prioritized deferral with real-time updates to their opening schedules. The algorithm iteratively regenerates updated peak sets until complete elimination is achieved.
Assuming a 15 min Peak Identification Time Window, two operational scenarios are evaluated: ① Centered Window: ±15 min around a well’s scheduled opening time triggers peak identification. ② Forward Window: Only subsequent 15 min intervals post-opening are monitored. Empirical testing demonstrates that Scenario ① introduces false positives by overextending detection ranges, whereas Scenario ② enables precise peak elimination through controlled iterations.
After extensive trials, the deferred opening interval resolution achieves 1 min iteration precision. Post-deferral wells automatically revert to their original intermittent production schedules in subsequent cycles. The optimized staggered control parameters are then exported for field implementation.

4. Jingbian Gas Field Application

4.1. Optimization of Well Opening–Closing Durations for Intermittent Production Wells in Practical Applications

(1)
Application of Conventional Intermittent Production Well Opening–Closing Duration Optimization
Well G1-1, a conventional intermittent production well in Jingbian Gas Field, underwent optimization of its opening–closing schedule using the established methodology. Based on three recent production cycles’ data—including opening–closing durations, tubing–casing pressure differentials during flow phases, coefficient D, casing pressure buildup, and average casing pressure—the original 5 h opening/30 min shut-in schedule was optimized to 2 h 50 min opening/2 h 40 min shut-in intervals. Post-adjustment, effective reservoir pressure recovery was achieved, and severe wellbore liquid loading was rapidly resolved. Despite an increased shut-in time ratio, daily gas production from Well G1-1 rose from 2987 m3/d to 5381 m3/d within 48 h due to successful liquid unloading, demonstrating significant productivity enhancement. Tubing and casing pressure variations before and after adjustment are illustrated in Figure 9.
Further analysis of coefficient D and tubing–casing pressure differentials for Well G1-1 reveals post-adjustment improvements: stabilized coefficient D within the 0.2–0.3 range and reduced pressure differentials, collectively enhancing production capacity and sustaining high production rates. Comparative trends of these parameters before and after optimization are detailed in Figure 10.
(2)
Application of Opening–Closing Duration Optimization for Wells with Severe Liquid Loading
Well G1-2, a severe liquid-loading well in Jingbian Gas Field with a tubing–casing pressure differential of 6.5 MPa, underwent schedule optimization using the intermittent production control methodology. Based on three recent production cycles’ data—including opening–closing durations, tubing–casing pressure differentials during flow phases, coefficient D, casing pressure buildup, and average casing pressure—the original 2 h opening/2 h shut-in schedule was adjusted to 1 h 30 min opening/6 h 30 min shut-in intervals. Within 48 h post-adjustment, daily gas production from Well G1-2 increased from 4398 m3/d to 5422 m3/d, achieving concurrent resolution of wellbore liquid loading and enhanced productivity. Tubing and casing pressure variations before and after adjustment are detailed in Figure 11.
Post-optimization analysis reveals an 80% reduction in average tubing–casing pressure differential to 1.3 MPa during opening phases, coupled with coefficient D stabilization within 0.1–0.9 (down from 3.5 pre-adjustment). These improvements significantly enhanced reservoir pressure recovery capacity. Comparative trends of coefficient D and pressure differentials before and after adjustment are detailed in Figure 12.

4.2. Application of Staggered Peak-Shifting Group Control Methodology

After configuring boundary conditions, including the deferred opening interval, peak identification time window, and maximum simultaneous opening capacity, and capturing at least 72 h of historical data, the algorithm executes intelligent scheduling using the staggered peak-shaving group control methodology. Gas Gathering Station 1 operates 20 production wells, comprising 12 intermittent production wells and 8 continuous-flow wells. Two operational scenarios were established to conduct staggered peak-shifting group control simulations.
First, the peak identification time window was set to 20 min, the maximum number of simultaneously opened wells was limited to 1, and the deferred opening interval for multi-well peak conflicts was defined as 1 min. Using the staggered peak-shifting group control method, a comparative analysis of the 48 h optimization results before and after peak adjustment is shown in Figure 13. In the Gantt chart, the X-axis represents time, and the Y-axis lists specific well IDs. Green segments indicate opening phases, while red segments denote shut-in periods.
Secondly, the peak identification time window was set to 45 min, the maximum number of simultaneously opened wells was limited to 2, and the deferred opening interval for multi-well peak conflicts was defined as 1 min. Using the staggered peak-shifting group control method, a comparative analysis of the 48 h optimization results before and after peak adjustment is shown in Figure 14.
As shown in the figure, through the optimization of the staggered peak-shifting group control method by configuring different parameters—including the peak identification time window, maximum number of simultaneously opened wells, and deferred opening interval for multi-well peak conflicts—effective peak mitigation is achieved. This significantly ensures operational stability across all gas gathering stations in Jingbian Gas Field.

5. Conclusions

This study addresses critical challenges in Jingbian Gas Field’s mid-to-late development phase—low efficiency, high energy consumption of intermittent production wells, and pipeline pressure fluctuations caused by clustered well activations—by proposing integrated solutions combining single-well optimization and multi-well staggered operations, significantly enhancing field development economics. Key conclusions are summarized as follows:
(1)
To resolve control challenges for non-metered wells, we developed a coefficient D-based optimization methodology for intermittent production scheduling, referencing load factor principles. This approach enables effective regulation of opening–closing durations using only tubing pressure, casing pressure, and pipeline pressure. Field applications demonstrate rapid liquid unloading in conventional intermittent wells and notable efficacy in severe liquid-loading scenarios.
(2)
A staggered multi-well activation protocol was established to mitigate compressor pressure fluctuations caused by simultaneous operations. The algorithm achieves group control effectiveness by preventing concurrent openings of any n wells (n > 1), effectively reducing pipeline pressure impacts. Case studies validate the methodology’s operational feasibility.
(3)
The research outcomes not only resolve production bottlenecks in Jingbian’s intermittent well clusters but also establish a technical paradigm for low-pressure, high-water-cut gas field development. The flow meter-independent single-well control method and staggered group control framework provide theoretical foundations for analogous reservoir developments.

Author Contributions

Methodology, Z.C. and Y.A.; Software, Q.Z., H.C., Q.Y. and J.Y. All authors have read and agreed to the published version of the manuscript.

Funding

This research received no external funding.

Data Availability Statement

The original contributions presented in this study are included in the article. Further inquiries can be directed to the corresponding author.

Conflicts of Interest

Authors Zhixing Cai, Qinyang Zhao, Hu Chen and Qin Yang was employed by the company The First Natural Gas Plant, PetroChina Changqing Oilfield Company. The remaining authors declare that the research was conducted in the absence of any commercial or financial relationships that could be construed as a potential conflict of interest.

References

  1. He, Z.; Zheng, C.; Wang, C.; Huang, D. Case Studies of Marine Oil and Gas Field Exploration in China (II): Discovery and Exploration of Jingbian Gas Field in Ordos Basin. Mar. Orig. Pet. Geol. 2005, 10, 8. [Google Scholar]
  2. Peng, X. Influencing Factors and Optimal Operational Systems for Low-Productivity Wells in Jingbian Gas Field. Master’s Thesis, Xi’an Shiyou University, Xi’an, China, 2010. [Google Scholar]
  3. Gao, C.; Liu, F.; Liang, Y.; Huang, S.; Han, H. Precision Management of Gas Well Production Based on Automated Intermittent Production Technology. Inn. Mong. Petrochem. Ind. 2023, 49, 33–38. [Google Scholar]
  4. Zhang, Y.; Yang, R.; Lü, M.; Cheng, Y.; Nan, X.; Liu, X.; Lin, M. Pressure Transient Analysis and Productivity Enhancement Strategies for Intermittent Wells. Petrochem. Ind. Appl. 2019, 38, 66–70. [Google Scholar]
  5. Ma, P.; Liu, Y.; Yang, Q.; Liu, X.; Zhang, L.; Zhang, P.; Wang, B.; Zhang, X. Optimization of Plunger Lift Operational Systems Using Load Factor Methodology. Petrochem. Ind. Appl. 2024, 43, 66–69. [Google Scholar]
  6. Lin, P.; Bai, P.; Wang, Y.; Wang, Y.; Wang, X.; Wang, P. Application of Intelligent Optimization Models in Plunger Lift Wells. Inn. Mong. Petrochem. Ind. 2021, 47, 46–49. [Google Scholar]
  7. Xia, X.; Xia, J.; Ji, W.; Jing, Y.; Gao, H.; Zhe, W. Optimization of Plunger Gas Lift Operational Systems in Shenmu Gas Field. Petrochem. Ind. Appl. 2017, 36, 66–68. [Google Scholar]
  8. Zhang, H.; Liang, Y.; Liao, Q.; Yan, X.; Shen, Y.; Zhao, Y. A three stage stochastic programming method for LNG supply system infrastructure development and inventory routing in demanding countries. Energy 2017, 133, 424–442. [Google Scholar] [CrossRef]
  9. An, H.; Choi, S.S.; Lee, J.H. Integrated scheduling of vessel dispatching and port operations in the closed-loop shipping system for transporting petrochemicals. Comput. Chem. Eng. 2019, 126, 485–498. [Google Scholar] [CrossRef]
  10. Zhang, Z.; Tan, C.; Gao, X.; Zuo, X.; Chen, T. A Mixed Integer Linear Programming Model for Production Scheduling of Non-Pipelined Wells. In Proceedings of the IEEE 15th International Conference on Control and Automation (ICCA), Edinburgh, Scotland, 16–19 July 2019; Volume 7, pp. 1397–1404. [Google Scholar]
  11. Gao, X.; Xie, Y.; Wang, S.; Wu, M.; Wang, Y.; Tan, C.; Zuo, X.; Chen, T. Offshore oil production planning optimization: An MINLP model considering well operationand flow assurance. Comput. Chem. Eng. 2020, 133, 1–13. [Google Scholar] [CrossRef]
  12. Zhang, H.; Liang, Y.; Liao, Q.; Wu, M.; Yan, X. A hybrid computational approach for detailed scheduling of products in a pipeline with multiple pump stations. Energy 2017, 119, 612–628. [Google Scholar] [CrossRef]
  13. Tan, C.; Li, Y.; Gao, X.; Ai, X.; Kui, G.; Sun, Y.; Feng, G. Staggered Pumping Schedule Optimization for Beam Pump Wells in Cluster Well Pads. J. Xi’an Shiyou Univ. (Nat. Sci. Ed.) 2021, 36, 83–90. [Google Scholar]
Figure 1. Dynamic characteristic chart of intermittent production well G1.
Figure 1. Dynamic characteristic chart of intermittent production well G1.
Processes 13 02170 g001
Figure 2. Dynamic Characteristic Chart of Intermittent Production Well G2.
Figure 2. Dynamic Characteristic Chart of Intermittent Production Well G2.
Processes 13 02170 g002
Figure 3. Dynamic characteristic chart of intermittent production well G3.
Figure 3. Dynamic characteristic chart of intermittent production well G3.
Processes 13 02170 g003
Figure 4. Dynamic characteristic chart of intermittent production well G4.
Figure 4. Dynamic characteristic chart of intermittent production well G4.
Processes 13 02170 g004
Figure 5. Dynamic characteristic chart of intermittent production well G5.
Figure 5. Dynamic characteristic chart of intermittent production well G5.
Processes 13 02170 g005
Figure 6. Dynamic characteristic chart of intermittent production well G6.
Figure 6. Dynamic characteristic chart of intermittent production well G6.
Processes 13 02170 g006
Figure 7. Algorithm diagram for 48-h well opening time prediction.
Figure 7. Algorithm diagram for 48-h well opening time prediction.
Processes 13 02170 g007
Figure 8. Flowchart for conflict peak identification and processing.
Figure 8. Flowchart for conflict peak identification and processing.
Processes 13 02170 g008
Figure 9. G1-1 tubing–casing pressure variations of well G1-1 before and after adjustment.
Figure 9. G1-1 tubing–casing pressure variations of well G1-1 before and after adjustment.
Processes 13 02170 g009
Figure 10. Tubing–casing pressure differential and coefficient D variations of well G1-1 before and after adjustment.
Figure 10. Tubing–casing pressure differential and coefficient D variations of well G1-1 before and after adjustment.
Processes 13 02170 g010
Figure 11. Tubing–casing pressure variations of well G1-2 before and after adjustment.
Figure 11. Tubing–casing pressure variations of well G1-2 before and after adjustment.
Processes 13 02170 g011
Figure 12. Tubing–casing pressure differential and coefficient D variations of well G1-2 before and after adjustment.
Figure 12. Tubing–casing pressure differential and coefficient D variations of well G1-2 before and after adjustment.
Processes 13 02170 g012
Figure 13. Gantt chart for well opening–closing operations in Case 1.
Figure 13. Gantt chart for well opening–closing operations in Case 1.
Processes 13 02170 g013
Figure 14. Gantt chart for well opening–closing operations in case 2.
Figure 14. Gantt chart for well opening–closing operations in case 2.
Processes 13 02170 g014
Table 1. Adjustment protocol for opening duration of intermittent production wells.
Table 1. Adjustment protocol for opening duration of intermittent production wells.
CP Increment RangeProposed Optimization Strategies
CP increment < 0.016 × CP + 0.136 MPaIncrease well opening duration by 1/5
0.016 × CP + 0.136 MPa ≤ CP increment < 0.5 MPaMaintain original well opening schedule
0.5 MPa ≤ CP incrementDecrease well opening duration by 1/5
Table 2. Adjustment protocol for shut-in duration of conventional intermittent production wells.
Table 2. Adjustment protocol for shut-in duration of conventional intermittent production wells.
Gas Well TypeRange of
Coefficient D
Proposed Optimization Strategies
Conventional
intermittent gas well (average CP ≥ 3.5 MPa)
D < 0.2Decrease well closing duration by 1/5
0.2 ≤ D < 0.3Well Opening–Closing System is reasonable,
no adjustment needed
0.3 ≤ D < 0.5Well Opening–Closing System is marginally
acceptable, Increase well closinging duration by 1/5
0.5 ≤ D < 1Well Opening–Closing System is suboptimal, Increase well closing duration by 1/3
1 ≤ D < 1.5Well Opening–Closing System is suboptimal, Increase well closing duration by 1/2
1.5 ≤ DWell Opening–Closing System is suboptimal, double closing duration
Table 3. Adjustment protocol for shut-in duration of wells with severely depleted reservoir pressure.
Table 3. Adjustment protocol for shut-in duration of wells with severely depleted reservoir pressure.
Gas Well TypeRange of Average Casing PressureProposed Optimization
Strategies
Under-pressured well
(average CP < 3.5 MPa)
Average CP > minimum TP + 2 MPaMaintain current settings
Average CP ≤ minimum TP + 2 MPaIncrease well closing duration by 1/5
Table 4. Adjustment protocol for shut-in duration of wells with severe liquid loading.
Table 4. Adjustment protocol for shut-in duration of wells with severe liquid loading.
Intermittent Well Parameter RangeGas Well Type Proposed Optimization Strategies
2.5 MPa ≤ Tubing–casing Pressure DifferentialSevere Liquid-Loading WellsDecrease well opening duration by 1/3
12 h ≤ Shut-in Time
D < 0.1
1.5 MPa ≤ Tubing–casing pressure differential one day before well opening
1 ≤ D
Disclaimer/Publisher’s Note: The statements, opinions and data contained in all publications are solely those of the individual author(s) and contributor(s) and not of MDPI and/or the editor(s). MDPI and/or the editor(s) disclaim responsibility for any injury to people or property resulting from any ideas, methods, instructions or products referred to in the content.

Share and Cite

MDPI and ACS Style

Cai, Z.; Zhao, Q.; Chen, H.; Yang, Q.; An, Y.; Yue, J. Optimization of Intermittent Production Well Strategy in Jingbian Gas Field. Processes 2025, 13, 2170. https://doi.org/10.3390/pr13072170

AMA Style

Cai Z, Zhao Q, Chen H, Yang Q, An Y, Yue J. Optimization of Intermittent Production Well Strategy in Jingbian Gas Field. Processes. 2025; 13(7):2170. https://doi.org/10.3390/pr13072170

Chicago/Turabian Style

Cai, Zhixing, Qinyang Zhao, Hu Chen, Qin Yang, Yongsheng An, and Jinpeng Yue. 2025. "Optimization of Intermittent Production Well Strategy in Jingbian Gas Field" Processes 13, no. 7: 2170. https://doi.org/10.3390/pr13072170

APA Style

Cai, Z., Zhao, Q., Chen, H., Yang, Q., An, Y., & Yue, J. (2025). Optimization of Intermittent Production Well Strategy in Jingbian Gas Field. Processes, 13(7), 2170. https://doi.org/10.3390/pr13072170

Note that from the first issue of 2016, this journal uses article numbers instead of page numbers. See further details here.