Hatami-Moghaddam, L.; Khalilzadeh, M.; Shahsavari-Pour, N.; Sajadi, S.M.
Developing a Robust Multi-Skill, Multi-Mode Resource-Constrained Project Scheduling Model with Partial Preemption, Resource Leveling, and Time Windows. Mathematics 2024, 12, 3129.
https://doi.org/10.3390/math12193129
AMA Style
Hatami-Moghaddam L, Khalilzadeh M, Shahsavari-Pour N, Sajadi SM.
Developing a Robust Multi-Skill, Multi-Mode Resource-Constrained Project Scheduling Model with Partial Preemption, Resource Leveling, and Time Windows. Mathematics. 2024; 12(19):3129.
https://doi.org/10.3390/math12193129
Chicago/Turabian Style
Hatami-Moghaddam, Ladan, Mohammad Khalilzadeh, Nasser Shahsavari-Pour, and Seyed Mojtaba Sajadi.
2024. "Developing a Robust Multi-Skill, Multi-Mode Resource-Constrained Project Scheduling Model with Partial Preemption, Resource Leveling, and Time Windows" Mathematics 12, no. 19: 3129.
https://doi.org/10.3390/math12193129
APA Style
Hatami-Moghaddam, L., Khalilzadeh, M., Shahsavari-Pour, N., & Sajadi, S. M.
(2024). Developing a Robust Multi-Skill, Multi-Mode Resource-Constrained Project Scheduling Model with Partial Preemption, Resource Leveling, and Time Windows. Mathematics, 12(19), 3129.
https://doi.org/10.3390/math12193129