Next Article in Journal
Study on Vibration Effects and Optimal Delay Time for Tunnel Cut-Blasting Beneath Existing Railways
Previous Article in Journal
Application of Extra-Trees Regression and Tree-Structured Parzen Estimators Optimization Algorithm to Predict Blast-Induced Mean Fragmentation Size in Open-Pit Mines
 
 
Article

Article Versions Notes

Appl. Sci. 2025, 15(15), 8364; https://doi.org/10.3390/app15158364
Action Date Notes Link
article xml file uploaded 28 July 2025 11:00 CEST Original file -
article xml uploaded. 28 July 2025 11:00 CEST Update https://www.mdpi.com/2076-3417/15/15/8364/xml
article pdf uploaded. 28 July 2025 11:00 CEST Version of Record https://www.mdpi.com/2076-3417/15/15/8364/pdf
article html file updated 28 July 2025 11:04 CEST Original file https://www.mdpi.com/2076-3417/15/15/8364/html
Back to TopTop