Sun, W.; Wang, E.; Li, J.; Liu, Z.; Zhang, Y.; Qiu, J.
Mining-Induced Earthquake Risk Assessment and Control Strategy Based on Microseismic and Stress Monitoring: A Case Study of Chengyang Coal Mine. Appl. Sci. 2024, 14, 11951.
https://doi.org/10.3390/app142411951
AMA Style
Sun W, Wang E, Li J, Liu Z, Zhang Y, Qiu J.
Mining-Induced Earthquake Risk Assessment and Control Strategy Based on Microseismic and Stress Monitoring: A Case Study of Chengyang Coal Mine. Applied Sciences. 2024; 14(24):11951.
https://doi.org/10.3390/app142411951
Chicago/Turabian Style
Sun, Weichen, Enyuan Wang, Jingye Li, Zhe Liu, Yunpeng Zhang, and Jincheng Qiu.
2024. "Mining-Induced Earthquake Risk Assessment and Control Strategy Based on Microseismic and Stress Monitoring: A Case Study of Chengyang Coal Mine" Applied Sciences 14, no. 24: 11951.
https://doi.org/10.3390/app142411951
APA Style
Sun, W., Wang, E., Li, J., Liu, Z., Zhang, Y., & Qiu, J.
(2024). Mining-Induced Earthquake Risk Assessment and Control Strategy Based on Microseismic and Stress Monitoring: A Case Study of Chengyang Coal Mine. Applied Sciences, 14(24), 11951.
https://doi.org/10.3390/app142411951