Next Article in Journal
Investigating the Effects of Concrete Mix Design on the Environmental Impacts of Reinforced Concrete Structures
Next Article in Special Issue
Re-Thinking Spatial Design in Homes to Include Means and Access Restriction with Material Impacts as Passive Suicide Prevention Methods: A Systematic Review of Design for Australian Homes
Previous Article in Journal
A Test Road with Unbound Base and Sub-Base Course from MSWI Bottom Ash Mixtures
Previous Article in Special Issue
Comparative Response Spectrum Analysis on 15- and 50-Story Reinforced Concrete Buildings Having Shear Walls with and without Openings as per EN1998-1 Seismic Code
 
 
Font Type:
Arial Georgia Verdana
Font Size:
Aa Aa Aa
Line Spacing:
Column Width:
Background:
Article

Deterministic and Probabilistic Risk Management Approaches in Construction Projects: A Systematic Literature Review and Comparative Analysis

by
Ania Khodabakhshian
1,
Taija Puolitaival
2 and
Linda Kestle
3,*
1
Department of Architecture, Built Environment and Construction Engineering, Politecnico di Milano, Via Ponzio, 31, 20133 Milan, Italy
2
Faculty of Built Environment, Tampere University, FI-33014 Tampere, Finland
3
School of Building Construction, Unitec Institute of Technology, P.O. Box 92025, Auckland 1142, New Zealand
*
Author to whom correspondence should be addressed.
Buildings 2023, 13(5), 1312; https://doi.org/10.3390/buildings13051312
Submission received: 19 March 2023 / Revised: 17 April 2023 / Accepted: 11 May 2023 / Published: 18 May 2023

Abstract

:
Risks and uncertainties are inevitable in construction projects and can drastically change the expected outcome, negatively impacting the project’s success. However, risk management (RM) is still conducted in a manual, largely ineffective, and experience-based fashion, hindering automation and knowledge transfer in projects. The construction industry is benefitting from the recent Industry 4.0 revolution and the advancements in data science branches, such as artificial intelligence (AI), for the digitalization and optimization of processes. Data-driven methods, e.g., AI and machine learning algorithms, Bayesian inference, and fuzzy logic, are being widely explored as possible solutions to RM domain shortcomings. These methods use deterministic or probabilistic risk reasoning approaches, the first of which proposes a fixed predicted value, and the latter embraces the notion of uncertainty, causal dependencies, and inferences between variables affecting projects’ risk in the predicted value. This research used a systematic literature review method with the objective of investigating and comparatively analyzing the main deterministic and probabilistic methods applied to construction RM in respect of scope, primary applications, advantages, disadvantages, limitations, and proven accuracy. The findings established recommendations for optimum AI-based frameworks for different management levels—enterprise, project, and operational—for large or small data sets.

1. Introduction

The construction industry has some of the highest accident and fatality rates, delays, and cost overruns, which are caused primarily by uncontrolled risks. Risks occur at various levels, operational, project, portfolio, strategic, and business and enterprise levels, derived from external and internal factors, and can be: (a) a field-based risk, including financial, market, operational, political, reputational, and disaster risks, or (b) a property-based risk, including uncertainty, dynamics, interconnection and dependence, and complexity [1]. Risk management (RM), as depicted in best practices and project management standards, tends to be a proactive approach consisting of risk identification, analysis and assessment, mitigation planning, and control stages [2] to exploit or enhance positive risks (opportunities) while avoiding or mitigating negative risks (threats) and to ensure the project’s success, to meet the project’s objectives and constraints, and to secure the project’s safety. However, it is still conducted in a manual, time-consuming, superficial, and ineffective manner. Risk identification and assessment, in their conventional ways, are conducted based on individual and experience-based expert judgments and seem highly personalized and context-dependent [3]. Therefore, knowledge transfer and model generalization remain critical issues for future projects.
On the other hand, the construction industry is experiencing a digitalization revolution thanks to the abundant production of data and the development of digital tools and data-driven decision-support systems such as artificial intelligence (AI), digital twins, and the Internet of Things (IoT). These technologies prepare the technical foundation for an intelligent and ever-improving construction industry. AI is one of the key pillars of the Industry 4.0 revolution and digitalization era, to create an active connection between the physical and digital worlds. It includes the science and engineering techniques that aim to make machines mimic human cognitive processes of learning, reasoning, perception, planning, and self-correcting [4]. AI is gaining vast applications for fostering, optimizing, and automating processes throughout the entire construction project life cycle for the “intelligent management” of projects.
AI models can improve analytical capabilities across the RM domain whilst offering a high granularity and depth of predictive analysis [5]. However, through its vital role in securing the project’s success and ability to solve the shortcomings of traditional RM methods, AI applications in construction RM have been limited and behind other industries. Robust AI-based RM frameworks are missing [6]. This study aims to analyze the AI algorithms and models from the risk reasoning and judgment point of view, for a functional classification addressable by practitioners and researchers in the field. This is a novel way of grouping the widespread AI algorithms’ applications in the construction industry. Unlike previous studies where the AI algorithm’s structure was the focus of analysis [7,8,9,10,11], this study bases the analysis and comparison of AI algorithms on the risk assessment statistical models and reasoning approaches that they utilize.

2. Background

Construction engineering and management are going through constant innovations toward digitalization and intelligence in the context of “Industry 4.0” [6]. AI is receiving increased attention due to its ability to provide increasingly accurate results in uncertain, dynamic, and complex environments [12], such as the construction industry. Having the intent of boosting labor efficiency by 40%, and doubling annual economic growth rates by 2035 [13], AI is becoming the focus for companies. The construction industry is experiencing a considerable boost in automation, productivity, and reliability and is reshaping itself along the whole life cycle of projects, including planning, construction, operation, and maintenance [10].
The advancement of AI and digital technologies can significantly change conventional risk assessment and management methods, making them factual, efficient, generalizable, and able to be performed in real time [6]. However, RM is a lesser studied and progressed domain in construction projects due to the complex and probabilistic nature of assessments, inferences, and the direct influence of RM on other knowledge areas such as stakeholders management [14]. The key reasons are (a) lack of structured data and infrequent documentation in the projects, (b) over-reliance on individual and experience-based judgement by experts in RM, (c) isolated risk analysis and ignorance of the causal inferences between variables in risk path analysis, and (d) incorrect choice of the AI model for a given problem, regarding data availability and requirements, the role of probability, expert judgement, and the reasoning behind the analysis [6,15].
AI is a vast umbrella term that includes various technologies, applications, types, and subfields. Based on a categorization provided by Abioye et al. [16], these subcategories are (a) machine learning, (b) knowledge-based systems, (c) computer vision, (d) robotics, (e) Natural Language Processing, (f) automated planning and scheduling, and (g) optimization. Machine learning (ML) algorithms can draw on extensive real-time data generated by cutting-edge technologies such as the Internet of Things (IoT), sensors, Cyber-Physical Systems (CPS), cloud computing, Big Data Analytics (BDA), text mining, and Information and Communication Technologies (ICT) for more reliable and smart management and decision making in construction projects [4]. This data, if transformed into a structured and understandable form, can serve as the basis of further data-driven analysis, which brings valuable insights for knowledge management in projects and economical and societal development in the industry [17]. ML processes take place based on historical data records, in which the machine tries to recognize the relationships between input data and output data by constant weighting and correction [16]. ML algorithms can analyze large volumes of data to extract insights from previous data, recognize the data pattern, generalize the rules, and make a prediction for upcoming data entries in complicated, non-linear, and uncertain problems [18]. Figure 1 presents the key pillars of the Industry 4.0 revolution in the construction industry.
AI-based RM systems can function as (a) early warning systems for risk control, (b) AI-based risk analysis systems, using algorithms such as neural networks for identifying complex data patterns, (c) risk-informed decision support systems for predicting various outcomes and scenarios of the decisions, (d) game-theory-based risk analysis systems, (e) data mining systems for large data sets, (f) agent-based RM systems for supply chain management risks, (g) engineering risk analysis systems based on optimization tools, and (h) knowledge management systems by integrating decision support systems, AI, and expert systems, to capture the tacit knowledge within organizations’ computer systems [1].
As depicted in Figure 2, an AI-based RM system aims to (a) mine and analyze real-time project data, historical records, or elicited experts’ opinions [20], (b) conduct automatic identification, evaluation, and assessment of risks, (c) conduct proactive decision making on responses to mitigate these risks, and (d) share these insights and predictions in a collaborative environment of data integration, such as Cloud Building Information Modelling (BIM), and digital twin platforms [10]. This research focuses specifically on the AI-based analytical models for risk assessment and management and aims to study the relevant aspects of a successful AI model, i.e., input data requirements, model structure and reasoning, application and scope, et cetera.
Most of the data-driven methods, such as ML algorithms, require a significant amount of data in a structured format to draw information from and make a prediction for future projects [21]. However, risk data are usually not frequently registered or updated in project documents. The data are often presented as unstructured text or in image formats, have missing values and scarcity problems, and are affected by different individual perceptions. As there are a variety of risk types, individual experts might not have encountered, nor have sufficient knowledge on, all of them. Human-based risk analysis systems tend to suffer from low accuracy, incomplete risk identification, and inconsistent risk breakdown structures [22]. Therefore, AI-based methods for data structuralizing and pre-processing are required, such as Natural Language Processing for text mining, Generative Adversarial Networks (GANs) for synthetic data production, and clustering and classification methods such as Support Vector Machine (SVM) and K-Nearest Neighbor (KNN) [23,24,25,26].
Figure 2. AI-based risk management framework [20,27,28].
Figure 2. AI-based risk management framework [20,27,28].
Buildings 13 01312 g002
ML algorithms’ structures, processing formats, and the role of probability in the process are important issues to consider. Probability theory has been studied via various models within the past few decades, such as Gaussian models, Pareto distributions, stochastic process theory, Markov processes, and Monte Carlo simulations [1]. However, an important factor that is missing in many of the previous techniques is the isolated analysis of risks [14] and there is ignorance of the causal interrelations and correlations among risk factors. The assessment of the individual risk factor’s magnitude, regardless of the occurrence, the probability of the risk events chain, and the effects each risk cause to the others, may result in an underestimation of the overall project risk level. Some previous studies have focused on the concept of risk paths and scenario analysis, rather than individual risk factors, which is a more accurate and realistic delineation [29].
The same concept is also applicable to the ML algorithms’ structures and processing formats. ML algorithms can generally conduct deterministic or probabilistic analyses which are grouped under deterministic or probabilistic approaches. Deterministic models follow a frequentist statistic and provide a fixed prediction amount, simply based on historical data and the effects of input variables on the output. Therefore, they require high volumes of data to base the judgements on [10]. The probabilistic approaches mainly follow a Bayesian statistic and base judgement on multiple sources, such as experts’ opinion, model simulation, and historical records [30,31,32,33,34]. Moreover, they provide a probability distribution of possible outcomes, considering the interrelation and causal inferences of input variables on each other. Therefore, they do not need a big database to draw from, and can update the probability distribution based on new observations or sources of judgement [35]. The first step, therefore, is to create a statistical analysis model, identify the problem to solve, and then decide which statistical approach to use, as improper choice of the statistical approach can result in the wrong influence of priors and variables, the wrong interpretation of results, and an improper reporting of results.
The same judgment-based and distribution-based grouping exists in conventional and non-AI-based RM methods, classifying them into deterministic and stochastic (probabilistic) models [36]. Deterministic models, such as the Probability–Impact matrix [37] or Pareto analysis [38], predict a fixed value and mostly follow a frequentist statistic. On the other hand, the stochastic models represent the random behavior of risk factors through various types of distributions that emerge from data (frequentist) or expert opinion (Bayesian) and provide a probability distribution of each outcome. For instance, the Monte Carlo method runs multiple simulations on the model to reach a frequentist distribution of possible outcomes with an objective and data-based judgment [36], or Program Evaluation Review Technique (PERT) is a probabilistic method based on the assumption that the duration of a single activity can be described by a probability density function [39]. However, a main difference between these methods and AI-based algorithms is that they predict outcomes based on some rules, distributions, and formulas set by the model, whereas AI algorithms learn these rules by observing many samples of input and output data and detecting the patterns between them. Therefore, the processing process and structure are not comparable to the ML algorithms.
This research aims to address the above-mentioned issue through a thorough study of ML algorithms applied in the construction RM domain, which can have either a deterministic (frequentist inference) or probabilistic (Bayesian inference) approach. A systematic literature review and comparative analysis between AI models for RM domain was conducted to answer the following questions:
(a)
In which capacities, and through the application of which algorithms, can the RM domain benefit from AI?
(b)
What are the entry data requirements for each algorithm? In the case of data scarcity and uncertainty, which algorithms are the most applicable?
(c)
What are the advantages, disadvantages, applications, scope, prediction accuracy, and limitations of probabilistic and deterministic AI-based RM approaches?

3. Research Methodology

This research used a systematic literature review approach with various analysis methods to answer the research questions. The systematic literature review has a comprehensive, structured, reproducible, transparent, and quantitative nature [40]. There are also some disadvantages such as potential biases in the search. These have been minimized by following a systematic process throughout [40]. As topics and domains related to the scope of this research are numerous, the systematic literature review approach helped locate the most relevant inter-disciplinary publications, extract knowledge areas, and categorize their applied AI techniques, after some filtering. The publication search was conducted in Scopus and Web of Science libraries in July 2022, as the result of a preliminary search. These sources provided relevant publications for the research theme. The Preferred Reporting Items for Systematic Reviews and Meta-Analyses (PRISMA) guidelines were used as required by the Buildings journal author guidelines, to conduct the systematic literature review, consisting of a 27-item checklist, and a 4-phase flow diagram consisting of (a) identification, (b) screening, (c) eligibility, and (d) inclusion for review. Following PRISMA provides a systematic structure for the review process and allows better and unbiased comparisons of findings, strengths, and weaknesses.
Figure 3, which was created based on the PRISMA guidelines, presents the literature search scheme, including the four phases which are further elaborated in the following paragraphs. The findings serve as the source papers to identify and classify AI algorithms for RM. The algorithms are classified into two groups of probabilistic and deterministic approaches. These are based on their analytical reasoning, input data requirements, and level of intaking uncertainty, and helped shape an important component of the AI-based RM framework in Figure 2.
In the identification phase (Figure 3), the search rule in the scientific databases was ((“construction”) OR (“AEC”) OR (“construction industry”) OR (“construction project”)) AND ((“risk”) OR (“risk assessment”) OR (“risk management”) OR (“risk evaluation”)) AND ((“Artificial Intelligence”) OR (“Machine Learning”) OR (“Data Mining”)). As a result of which, and after duplicates removal, 533 articles remained.
In the screening phase (Figure 3), the criteria used included the engineering domain, English language, and the type of review paper. Among the 533 papers in this phase, only 356 were in the engineering and building domain, and the rest in other domains were excluded. Moreover, only 314 of these 356 were in English, only 69 of which were review papers. As a result, 69 articles were selected for this phase. Review papers were the focus, as they had a wider variety of techniques included, often had had a comparison conducted, and had the correct level of detail for each method for our research scope. It is noteworthy that the exclusion process up to this point was fully automatic and based on the filtering rules of the scientific libraries. Therefore, any potential biases or errors were out of the control of the researchers.
In the eligibility phase (Figure 3), which had some overlaps with the screening phase, abstracts and keywords of the 69 documents were reviewed to remove the outlier publications. For instance, some publications were studying RM in other industries, some were focused on AI methods for other purposes such as data generation, and some were focused on non-AI methods. As an example, Li et al. [41] developed an occupational risk assessment indicators system of power grid enterprises using AHP, which, although containing valuable insights, was out of the scope of this study. A similar case was the review study conducted by Cao et al. [42] on AI algorithm applications in civil engineering issues, such as determining the compressive strength of concrete and predicting and evaluating the different parameters of composite beams and shear connectors, which was also out of this study’s scope. The exclusion process at this point was manual and based on the researcher’s judgment. There might have been some mistakes caused by incomplete abstracts, which could have led to the wrong exclusion or inclusion of papers. However, the final 48 source papers were fully reviewed to guarantee their compliance with the research questions and objectives and to reduce selection errors. There might have been other insightful papers not included in the analyzed scientific libraries, which is an inevitable issue in any literature review study.
In the inclusion phase (Figure 3), 48 final documents were selected as the source papers, and these were thoroughly studied and analyzed using quantitative and qualitative analyses to answer the research questions. For the quantitative analysis, a bibliometric analysis was conducted as it includes many techniques, such as science mapping and particularly co-word analysis—both considered to be applicable for this research. Co-word analysis examines the content of the publications’ “words” themselves [43]. As an example, co-word analysis can show a thematic relationship with words that frequently appear together. It also shows keywords’ and research areas’ co-occurrence. Main areas of research concentration, common techniques, interrelation of topics, application scopes, and trending topics were identified. It is noteworthy that a number of papers were particularly focused on health and safety risks, which were only analyzed regarding the AI algorithms that they proposed. For instance, Kamari and Ham [33] presented a vision-based digital twinning and thread assessment framework for natural disaster risk modeling at a construction jobsite and analyzing the impacts of potential windborne debris in construction site digital twin models.
As the bibliometric analysis is quantitative in nature and produced mainly background data, qualitative analyses followed to answer the research questions in more detail. AI-based risk data structuralizing and pre-processing methods through qualitative content analysis were undertaken first. Then, secondly, thematic content analysis was carried out, using a deductive approach to identify, analyze, and report repeated patterns [44]; in this case, these were deterministic and probabilistic approaches for risk identification, analysis, and mitigation planning. Thirdly, a comparative analysis was performed between probabilistic and deterministic approaches regarding their reasoning basis in risk identification, assessment, and mitigation planning stages, advantages and disadvantages, application areas, and data requirements.
The PRISMA checklist is best suited for quantitative studies and analyses. Due to the qualitative nature of the main analysis stage, some of the checklist items, such as risk ratio, risk of bias, mean difference, and sensitivity analysis, were not applicable for this study. However, the reporting herein does follow the PRISMA checklist topics: rationale and objectives can be found in the Introduction and Background, methods in the Research Methodology, results and discussion in the Findings and Discussion sections and finally in the Conclusions and Further Research section.

4. Findings and Discussion

4.1. Background Data

All the 48 source papers served as references for the bibliometric analysis of the findings. Figure 4, Figure 5 and Figure 6 were created for a visual presentation of trending topics and research areas, technologies, and publication rate. Figure 4 illustrates the co-occurrence diagram between keywords and research areas in the source papers created by the Bibliometrix application, providing the big picture of the interdisciplinary research in the field. The circles represent the keywords in articles, and their colors are assigned by the clustering algorithms in Bibliometrix. Moreover, the authors grouped these keywords into five main areas based on their similarity and content, represented by the colored squares. As indicated on the diagram, the papers introduce a number of AI algorithms applicable to various steps of RM, such as risk identification and analysis and for decision making on different aspects of construction projects, such as contracts or cost. There are a number of papers particularly focused on health and safety risks, which were only analyzed regarding the techniques they proposed. Figure 5 records the annual scientific publication rate in the research area and demonstrates a significant increase within the past couple of years. Figure 6 indicates the various topics’ trends within the past 15 years. Big Data, machine learning, and deep learning lead the current trend, followed by health, safety, and occupational risks. Decision support systems and knowledge-based systems used to be trending during the last decade, but have now been superseded by AI-based techniques that foster decision making.

4.2. AI-Based Risk Data Structuralizing and Pre-Processing

Text mining tools such as Natural Language Processing and adaptive lexicon have been implemented to convert textual and unstructured risk data into a proper structured format for AI algorithms [45]. Given that 80% of construction data are stored in text format in project reports, TM can extract valuable data for identifying contract risks from contract conditions, socio-technical risks from licensee event reports, and safety risks from accident reports [46] for the further analysis of risks. Computer vision techniques are for detecting hazardous objects and situations that might trigger safety risks through images. Clustering and classification methods are used to categorize risks and can be integrated with text mining methods as a next step in text structurization. These methods are widely applied in the safety and contract risk domains, for instance, various ML methods, such as Support Vector Machine (SVM), Linear Regression (LR), K-Nearest Neighbor (KNN), Decision Tree (DT), and Naïve Bayes (NB) models, are used in the literature to classify the causes of accidents [47].
As construction companies and institutions do not document frequently and do not share their data in the form of open sources, a common issue in construction is data scarcity and missing values, which hinders the application of machine learning and deep learning algorithms requiring huge amount of data to have proper performance. There-fore, data augmentation techniques such as Generative Adversarial Networks (GANs) are applied to improve the quantity and distribution of data by producing synthetic data through learning from the training sample [48]. Although GANs have broader application in creating synthetic images, which can be highly beneficial in analyzing safety risks and hazards in construction sites, they are recently being applied on tabular data as well, which are the common form of risk data registration. However, advanced GANs’ algorithms for tabular data generation are still missing and the produced data might face an overfitting problem. Another solution to the data scarcity problem is elicitation. Elicitation is the process of obtaining knowledge and subjective assessment about the underlying relationships and dependencies between variables and their probabilities from domain experts, which is being vastly used in learning structure and parameters in Probabilistic Graphical Models such as Bayesian Networks [49].

4.3. AI Algorithms Classification for Risk Identification, Analysis, and Mitigation Planning

Various categories have been proposed for AI-based risk analysis and reasoning methods in the literature. Based on the categorization for AI application areas in the construction industry proposed by Pan and Zhang [10], RM falls under the category of expert systems/fuzzy logic for knowledge representation and reasoning mainly formed on probabilistic, qualitative, and linguistic analysis, and machine learning for supervised learning based on either probabilistic or deterministic analysis. Samantra et al. [50] classified construction risk assessment approaches as (a) probabilistic, dealing with risk probability and impact estimation based on historical numeric data, including sensitivity analysis, Decision Tree analysis, Bayesian Networks, Monte Carlo simulation, etc. [51], and (b) possibilistic, dealing with risk possibility and impact estimation based on qualitative or descriptive data including fuzzy logic [52]. The advantage of the possibilistic approach is that it can embrace the uncertain and vague definition of risk factors and their magnitude in a linguistic and subjective description [50]. Although called by various names, the notion and reasonings for classifying the methods are the same, in most cases. For ease of reference, this paper called them probabilistic and deterministic approaches. It is noteworthy that this classification basis is the risk reasoning itself, which is applicable to all phases of the RM process from risk identification to assessment and mitigation planning. This classification aims to bridge the gap in previous studies and provide a standardized and holistic grouping applicable to all ML algorithms in the realm. Furthermore, unlike previous studies that focus mostly on the structure of the ML algorithms and their theoretical backgrounds, this study has a practical and problem-driven approach, assessing and grouping the algorithms based on their potential to fit different situations and scenarios in real-world projects.
The probabilistic approach is mostly based on Bayesian inference, which allows for making judgements on prior and posterior probabilities in random variables based on various sources, such as expert judgement, model simulation, or historical data [53]. Prior probability is the likelihood of a particular state of a variable happening without seeing any evidence, and posterior probability is the updated belief or likelihood of that state of a variable happening after seeing evidence [54].
Benefitting from multiple sources of data in probabilistic approaches, the priors can be learned based on one source and the posteriors can be updated by another source. On the other hand, the deterministic approach is mostly based on the frequentist approach, which can be based on historical records and the priors are learned based on the frequency of an event happening in the database. These methods perform best when a huge amount of data is available. The learning and development processes are much more straight forward and simpler compared to the probabilistic approach, as the elicitation process to obtain information on probabilities from experts is usually challenging and time-consuming. However, the downside, in contrast to probabilistic approaches, is the inability to assign probability to a particular event happening after witnessing evidence, i.e., the posterior update. The downside of the probabilistic approaches, on the other hand, is the subjectivity, bias, and over reliance on experts’ opinions if not calibrated properly [55].

4.3.1. Probabilistic Approach

The probabilistic approach is used by Structural Equation Modelling (SEM), Bayesian Network (BN), fuzzy logic, and fuzzy cognitive map that can be integrated with other methods such as fault tree analysis. These methods have a vast application in expert systems and knowledge representation and can have one of the below-mentioned risk reasonings [56]:
  • Probability-based reasoning, referring to probability theory to indicate the uncertainty in knowledge, including fault tree analysis (FTA), SEM, and BNs.
  • Rule-based reasoning, deploying a set of rules in the “if <conditions>, then <conclusion>” format with logical connectives, such as AND, OR, and NOT, for analyzing the qualitative and linguistic data of expert opinion, including fuzzy logic.
  • Fuzzy cognitive map (FCM) learned from data or expert opinions, in which the fuzzy graph structure enables interpreting complex relationships and systematic causal propagation for the immediate identification of risks’ root causes in uncertain conditions.
SEM is a versatile multivariate statistical technique consisting of a schematic diagram representing causal structural relationships among multiple variables [57], and has a vast application in construction safety risk analysis with Exploratory Factor Analysis (EFA). EFA can uncover the underlying structure of a large set of variables when there are no hypotheses about the nature of the underlying structure of a model [58].
Bayesian Networks are the most applied Probabilistic Graphical Model in the construction industry [20], and are statistical techniques based on probability and graph theory that represent the causal relationships between the variables and their probabilities in a risk networks. BNs are presented as graphs consisting of nodes, as random variables, and directed arcs, as causal relationships among these variables, which is referred to as the Directed Acyclic Graphical model (DAG) [59] and includes a Conditional Probability Distribution (CPD) for continuous variables or a Conditional Probability Table (CPT) for categorical variables, representing the influences between the nodes. The structure and parameters for CPD or CPT can be learned through algorithms from extensive historical data, expert opinion, or both. BNs have a wide application in modelling, identifying, and analyzing project-related risks such as claims and contract risks, structural health, operation quality, cost and schedule overruns, and safety hazards [60,61].
Fuzzy logic has wide application in modelling qualitative and subjective data extracted from expert opinion, which allows reasoning with ambiguous information. The probability of verbal expressions are transformed into fuzzy numbers, with degrees of truthfulness or falsehood represented by a range of values between 1 (true) and 0 (false), using triangular, trapezoidal, or Gaussian fuzzy membership functions, and through four subprocesses of fuzzification, inference, composition, and defuzzification [62]. Fuzzy logic integration with Bayesian Network, Analytic Hierarchy Process (AHP), and TOPSIS is proven to be a robust risk assessment and decision-making approach, especially when the problems are characterized by subjective uncertainty, ambiguity, and vagueness [63]. A fuzzy cognitive map [56] is a combination of fuzzy logic and cognitive map, which uses subjective and vague linguistic variables from domain experts, performs a Root Cause Analysis, and models complex and dynamic systems with numerous indicators, causal dependencies, and weights. FCM forms a what-if scenario analysis for the prediction and evaluation of risks in a fuzzy weighted graph model with a tolerance of imprecision and uncertainty [64].
There are some interesting previous studies that proposed probabilistic and subjective RM models for construction projects. Afzal et al. [65] proposed a hybrid method of fuzzy logic and BBN based on a systematic literature review on subjective RM methods for cost overrun risk in construction projects, which proved to have better performance compared to other AI-based methods. The integration of Monte Carlo simulation (MCS) and multi-criteria decision model (MCDM) techniques for measuring complexity and risk relationship for cost overrun in construction projects was studied and proposed by Floyd et al. [66] and Qazi et al. [67]. Cardenas et al. [31] addressed the data unavailability and incompleteness problem in tunneling projects through expert elicitation in BBNs. Lee and Kim [68] proposed a Failure Mode and Effects Analysis (FMEA)-based method to find primary factors responsible for causing cost increases throughout the modular construction life cycle. Ferdous et al. [69] developed a Quantitative Risk Analysis model based on event tree analysis (ETA) and fault tree analyses (FTA) to handle and describe the uncertainties in the input event likelihoods. Kim et al. [70] conducted a comparative analysis between SEM, multiple regression, and ANN and developed an SEM-based model to predict the project success of uncertain international construction projects.
There is a trend of integrating fuzzy logic with other AI-based methods in the literature. Fuzzy logic applications in construction management literature can be divided into two main fields (a) fuzzy set/fuzzy logic and (b) hybrid fuzzy techniques, with the applications in four main categories, including decision making, performance, evaluation/assessment, and modeling [71]. For instance, Zhao et al. [72] developed a risk assessment model using a fuzzy synthetic evaluation approach for green building projects in Singapore, which grouped and calculated the likelihood of each risk factor’s occurrence, risk magnitude, and criticality. Kabir et al. [73] incorporated fuzzy logic into BBN and proposed a fuzzy Bayesian belief network (FBBN) model to represent the dependencies of events and uncertain knowledge (such as randomness, vagueness, and ignorance) for the safety analysis of oil and gas pipeline projects. In another study, Shafiee [74] proposed a fuzzy analytic network process (FANP) approach to select the most appropriate risk mitigation strategy for offshore wind farms with regard to four criteria: safety, added value, cost, and feasibility. Zhong et al. [75] proposed a project risk prediction model using an entropy weight method (EW), a fuzzy analytic hierarchy process (FAHP), and a 1D convolutional neural network for risk indexing. Cheng and Lu [76] presented a hybrid risk analysis model combining fuzzy inference with failure mode and effect analysis (FMEA) to improve the existing risk assessment methods for pipe jacking construction by mapping the relationship between occurrence (O), severity (S), and detection (D) and the level of criticality of risks. Liu and Ling [77] constructed a fuzzy-logic-based artificial neural network model, or fuzzy neural network (FNN), to facilitate the decision-making process for contractors, providing a clear explanation to justify the rationality of the estimated markup output. There are also some remarkable literature review studies on fuzzy and hybrid risk assessment methods in construction projects, such as the one that Islam et al. [78] conducted, which delineated the advantages of the fuzzy Bayesian belief network (FBBN) over other hybrid models such as FANP, due to overcoming systematic constraints such as the lengthy calculations required for the pairwise comparisons. Petroutsatou et al. [79] proposed a probabilistic model for pre estimating the life cycle cost of road tunnels’ construction using multiple regression analysis and Monte Carlo simulation. A detailed table of related papers and their techniques can be found in Appendix A.

4.3.2. Deterministic Approach

A list of ML techniques applied in construction-related disciplines includes artificial neural networks (ANN), Decision Trees, Logistic Regression, Naïve Bayesian Models, and Support Vector Machines. ML combines methods from statistics, database analysis, data mining, pattern recognition, and AI to extract trends, inter-relationships, patterns of interest, and useful insights from complex data sets [80]. A deterministic approach is used by most of the machine learning algorithms. These algorithms can be used for one of the following applications in RM: (a) regression to predict continuous numerical outcomes such as delay caused by a risk, including Linear Regression, Decision Trees, Support Vector Machines (SVM), and neural network (NN) techniques; (b) classification to present the class of the output based on some input features, such as risk identification, including NNs, Random Forest, SVM, and Genetic Algorithm; (c) clustering to explore data for natural groupings, such as finding related events causing a risk, including K-means and SVM; (d) attribute importance to rank attributes based on their relationships to the target variable, such as identifying the most significant causes of accidents, including Decision Trees and Random Forest; (e) anomaly detection to identify unusual cases based on deviation, such as identifying accident risks, including SVM and deep neural networks. In contrast to other realms in construction, ML applications have been limited and mainly related to predicting delay risks in construction, predicting the impact of contract changes on the time and quality performance, and analyzing and modeling incident databases for predicting H&S risks. The format of the input risk data for risk assessment in the deterministic approach can be numeric, categorical, video data, sensor data, textual data, etc., and input data acquisition approaches could be historical, real-time, or a combination of historical and real-time data [81].
ANNs are the most applied ML method in engineering risk assessment, followed by SVM, Decision Trees, RF, CART, Naïve Bayes, K-means, KNN, Linear Regression, and BRT [81]. NNs are formed by layers of interconnected nodes using activation function, weight, and bias, which simulate the human brain structure and behavior for solving problems such as recognition, classification, and regression [82]. The reasoning behind these layers relies on the weights and biases assigned to each node, being learned and optimized, based on forward propagation and backpropagation processes, with an objective to minimize the loss function as an indicator of prediction precision. They provide notable performance in the presence of abundant data, capturing linear and nonlinear relationships of the data. They also act as a predicting–analytical model for industrial RM control and accidents’ severity assessment, firstly to estimate the S-curve in a construction project, secondly to analyze the causes of accidents, and to also predict delay risk in construction logistics [83].
DT is a supervised learning method that explores the relationships of many input attributes to an output attribute by creating a top-down branching structure consisting of a root node splitting into branches as probable outcomes. DTs do not need any assumptions regarding the independence of variables or variable values. They can process both numerical (continuous) and categorical (discrete) data and perform regression and classification. Support Vector Machines (SVM) perform regression and classification by mapping data to a high-dimensional feature space. This is to categorize the data points by forming a separator between the categories in the form of a hyperplane. Genetic Algorithm, which is an optimization and complex problem-solving method using an adaptive heuristic search, is also useful in measuring project risk interdependencies for the optimal cost solution under uncertainties [84].
The deterministic approach has been widely studied in the RM literature. Jallan and Ashuri [85] used text mining and Natural Language Processing techniques to identify and classify risk types and trends affecting publicly traded construction companies by leveraging their 10-K reports filed with the Securities and Exchange Commission. Chattapadhyay et al. [86] used a cross-analytical machine learning model with K-means clustering and Genetic Algorithm to exploit different risk factors and their impacts on the performance aspects of construction megaprojects. Valpeters et al. [87] determined the probability of contract execution risk at a given stage of its establishment using Logistic Regression, Decision Tree, and Random Forest algorithms. Creedy et al. benefited from Multivariate Regression Analysis for evaluating risk factors that lead to cost overruns in delivering highway construction projects. Yaseen et al. [12] developed a hybrid artificial intelligence model called integrative Random Forest classifier with Genetic Algorithm optimization (RF-GA) for delay problem prediction. Joukar and Nahmens [88] extracted and forecasted the short-term volatilities of the Construction Cost Index (CCI), like price volatilities, by assessing the cost risk of construction projects, and quantified the risk of overestimation or underestimation, using Generalized Autoregressive Conditional Heteroskedasticity (GARCH) model and ARIMA. Gondia et al. [83] used Decision Tree and Naïve Bayes model to analyze and predict project delay risks using objective data from previous projects. Alshboul et al. [89] implemented an ensemble machine learning technique combining various ML algorithms, such as XGBoost, Categorical Boosting, K-Nearest Neighbor, Light Gradient Boosting, ANN, and DT, to predict the liquidated damages in highway construction projects.
Neural networks are the most used algorithms in this group and have been integrated with other algorithms in hybrid models as well. Goh and Chua [90] used NN analysis in a quantified occupational safety and health management system audit with accident data obtained from the Singaporean construction industry in order to predict accidents and identify safety critical factors. Gajzler [91] developed a method for supporting the decision-making process of materials and technology selection for repairing industrial building floors using knowledge-based NN and fuzzy logic. Jin and Zhang [92] developed an ANN-based risk allocation decision-making process in public–private partnership (PPP) projects. Chenyun and Zichun [93] conducted an analysis and evaluation of project cost risk and the identification of critical factors based on NN. A detailed table of the related studied papers and their techniques can be found in Appendix A.

4.4. Comparative Analysis between Probabilistic and Deterministic Models

Following determining and listing the probabilistic and deterministic algorithms based on the source papers in Figure 3, an analytical comparison was performed between them regarding their reasoning basis in risk identification, assessment, and mitigation planning stages, advantages and disadvantages, application areas, and data requirements for each, presented in Table 1. The basis of this comparison was the points mentioned in the sourced papers of the systematic literature review regarding the precision, problem type, analytical reasoning, input data requirements, level of probability included, and characteristics of each of these methods.
In general, algorithms with a deterministic approach have advanced structure, quicker processing time, and higher result precision in complex problems, but they require a large amount of structured data with no missing values or uncertainties. Given that documentation is in a less than optimum condition in the industry, data scarcity and infrequent data updates are the main challenges in these models. The probabilistic approach, on the other hand, due to functioning in the state of data scarcity and missing values and being closer to reality regarding the inter-dependencies between risk variables, is more practical. It can integrate subjective and experience-based experts’ opinions through the elicitation of objective historical data gathered from previous projects or simulations to overcome the data scarcity issue. Moreover, it benefits from the risk path approach instead of isolated risk assessment. However, the structure and parameter learnings are daunting and complicated tasks as the model becomes more complex, containing more variables and relationships. The probabilistic approach is based on Bayesian inference, as mentioned in Equation (1), and the deterministic approach is based on frequentist inference, as mentioned in Equation (2). These equations are the basis of risk reasoning and assessment for different AI algorithms, which can lead to different results and accuracies in the RM process. Construction firms can refer to this study and Table 1 to choose the most appropriate AI model to foster their RM processes, their enterprise requirements, and data availability.
P P o s t e r i o r H | D = P D | H P P r i o r H P D
L i k e l i h o o d   L H ; D = P ( D | H )

4.5. Results Comparison with Previous Studies

The main foci of previous review studies were the structure of the AI algorithms or the data mining technologies [121], the classification of AI methods based on their structure, or the used technology, such as ML or computer vision [15]. The grouping of these technologies was based on their area of application in construction projects. For instance, Afzal et al. [65] conducted a comprehensive review analysis on AI-based risk assessment methods, and listed papers based on the technique used, identifying six key techniques used. In another study, the tree structure consisting of nodes in data mining was studied by Rao and Chen [121] in the scope of construction risk control. Islam et al. [78] conducted an extensive review of hybrid and fuzzy models’ structures and then explored the areas of their applications, such as roads and highways and building projects [122]. A few articles just focused on one type of risk, such as safety risk, and one type of project, such as urban railway construction. Some other studies [7,8,9,10,11] highlighted the RM domain, focusing on the types and structures of AI technologies applied in construction. In other studies, a specific method, such as the SEM, was analyzed thoroughly regarding technical aspects, sample size issues, data screening and reliability testing, model evaluation and validation processes, etc. [57].
Although such studies provide helpful insights, they contain highly detailed and advanced information and formulas that might be from the experience and roles of the audience and, in our case, the practitioners and industrial researchers in the field. Most of the technologies discussed in these papers are at the research stage. Their future potential application in practice is therefore still unknown. Applying a practical approach to the topic, this study aims to analyze the ML algorithms from the risk reasoning and judgment point of view, and classify the methods based on the established statistical reasonings in probability studies, i.e., frequentist and Bayesian approaches. Such a functional and right-to-the-point classification is easily comprehensible and able to be addressed by practitioners and researchers in the field, meaning they can choose the method that best fits their requirements and resources. This is an interdisciplinary and novel way of grouping the widespread ML algorithms already implemented in the construction industry. Furthermore, this practical viewpoint assisted the integration of the various, heterogeneous findings of previous studies in the literature, which had differing scopes. Underlying similarities between this study and previous investigations in terms of the systematic literature review process are inevitable and expected in part.
It is noteworthy that the validation of results produced by different ML algorithms is outside the scope of this study. However, previous studies proved the higher accuracy, efficiency, and processing speed of the ML algorithms compared to traditional methods. Their accuracy is assessed using performance metrics such as Root Mean Square Error (RMSE), Mean Absolute Error (MAE), Mean Absolute Percentage Error (MAPE), and Coefficient of Determination (R2) [89], which compare the estimated value with the actual value of outcomes. Different algorithms are of varying accuracy and performance in different contexts; therefore, it is only possible to evaluate their overall performance and validate them by knowing the context and scope of their application.

5. Conclusions and Further Research

The construction RM process benefits significantly from AI in terms of automation, optimization, fostering decision making, and standardization, as supported by the systematic literature review findings. Machine learning and deep learning algorithms, with ANN, SVM, BN, and fuzzy logic in the lead, have found significant applications in RM research. However, in order to implement these methods in practice, and to identify the causes of various risks and to analyze them in construction projects, experience, prior knowledge, and historical data are required. In most cases, those experiences are not always well documented nor easily accessible. Therefore, the data requirements, reasoning, and structure of each AI model needs to be thoroughly analyzed to select the most appropriate one based on the requirements and data availability in an organization. Furthermore, AI-based methods, such as text mining and computer vision, can assist in structuring the risk data and overcome the data scarcity problem.
This study provided a systematic literature review based on the PRISMA guidelines provided for classifying AI algorithms that can be applied during different phases of the RM process. The source papers were studied thoroughly to extract insights on common AI algorithms used for risk management, as well as their main areas of application. These algorithms were grouped under probabilistic and deterministic groups based on their risk reasoning, learning process, data requirements, flexibility toward data scarcity, uncertainty, integration of qualitative and quantitative data, and application scope.
The deterministic approaches are mostly based on frequentist statistics and can predict an outcome without attaching a likelihood to it. Moreover, ML algorithms with a deterministic approach, such as deep learning algorithms, have a black-box structure; that is, the workflow between input and output variables is complex and incomprehensible to users. Therefore, there is no room for subjective expert judgment in the process. The relationships between inputs and outputs are merely learned from historical data and simulations, making the model require a huge amount of data for learning and adjusting weights.
Alternatively, the probabilistic approaches are based on Bayesian statistics and predict the likelihood of different possible outcomes. While black-box models are being programmed with minimum human guidance, probabilistic models such as Bayesian Networks and SEMs are the closest examples to the Explainable AI (XAI) concept, being more comprehensible for users due to their transparent and graph-based structure indicating the inter-relationships between input variables and the output. Therefore, they can serve as knowledge-based systems representing domain knowledge and expert opinions through elicitation, integrating subjective expert judgment with objective historical data. This is an advantage when there are not enough data available to base the entire learning process on. It is noteworthy that hybrid models, such as fuzzy neural networks or Bayesian neural networks, combine the two approaches and benefit from both linear and non-linear relationships between input variables. They usually have more robust performance and better flexibility and are becoming more widespread in construction research.
The contribution of this paper is providing an analytical comparison between different AI algorithms for practitioners and researchers to choose the appropriate AI model for a targeted risk, which, as proven by the results of previous studies in the literature, can bring many advantages in terms of automation, optimization, digitalization, and decision making, increasing the RM processes’ performance and projects’ success rate. This comparison is made from a practical and problem-driven viewpoint and highlights the most influential features when choosing and implementing a model in practice. That is, instead of focusing on the structure of each algorithm and trying to fit them into the RM problem, which can often fail, this study focuses on the situations and problems in which each algorithm can work best regarding data availability, the emphasis on uncertainty, the existence of different data sources, etc. The algorithms’ categorization provided by this study is also based on risk reasoning statistics to bring the theoretical topics one step closer to practical processes. It is the main difference from previous literature review studies, which put their focus on the algorithms’ structures and types with great theoretical detail and formulas rather than their practical capacities, reasonings, and challenges. An AI-based RM framework is presented, in which this study focuses on the data analysis phase. Future phases will be the subject of further studies.
One of the limitations of this research was the paucity of publications when validating the proposed analytical comparison. Being a highly specialized topic, many previous studies were out of the scope of this study and could not serve as a benchmark for comparing results. Another limitation was using English language as one of the filters. This might have excluded some relevant studies. Further, the classifications provided by previous researchers for the AI algorithms were based on different criteria, such as the project phase, the algorithms’ efficiency levels, supervised or unsupervised learning, etc., which in some cases were incompliant, contradictory, or partial. Therefore, this study grouped them under probabilistic and deterministic approaches to include the majority of these criteria. A more detailed classification would provide a more accurate comparison. Another limitation is the variety of methods and techniques, both AI-based and non-AI-based; each has a different scope and target process. Therefore, not all of the techniques could be analyzed within one article, and most of them applied to other phases such as data gathering and digital twin integration. However, these topics will be the focus of future research work to complete the AI-based RM framework proposed in this study.
In addition to analyzing the AI-based data gathering and preprocessing tool, a further study can involve the discussion and validation of the comparative table by experts in the field and/or through case studies for the implementation of algorithms and comparison of the results. The systematic literature review could also be expanded into other generic AI-based RM framework phases, such as data production and documentation techniques, integration with digital twins, etc. Moving toward a fully automated RM process, the findings of the practical application of AI in real-world case studies throughout different phases of the proposed framework, for instance, the data gathering, data analysis, and automating document update, would be the topic of further studies.

Author Contributions

Conceptualization, A.K.; methodology, A.K.; validation, A.K.; formal analysis, A.K.; investigation, A.K.; data curation, A.K.; writing—original draft preparation, A.K., T.P. and L.K.; writing—review and editing, A.K., T.P. and L.K.; visualization, A.K. All authors have read and agreed to the published version of the manuscript.

Funding

This research received no external funding.

Data Availability Statement

No new data were created or analyzed in this study. Data sharing is not applicable to this article.

Acknowledgments

We want to thank Fulvio Re Cecconi (Politecnico di Milano) for supervising the research project on “Machine Learning-based Risk Management in Construction Industry”, which provided a partial base for this study.

Conflicts of Interest

The authors declare no conflict of interest.

Appendix A

Table A1. References of source papers and partially used papers for the systematic literature review.
Table A1. References of source papers and partially used papers for the systematic literature review.
ReferencesModelTechniqueContext
Love et al. (2021) [123]Review Paper Review on risk and uncertainty of rework in construction
Afzal et al. (2019) [65]Review Paper Systematic literature review and content analysis on AI-based risk assessment methods
Cao et al. (2021) [42]Review Paper Review on AI algorithms, e.g., ANN, GA, SVR, etc., applications in civil engineering domains such as predicting and evaluating the different parameters of composite beams and shear connectors
Chenya et al. (2022) [6]Review Paper Systematic literature review on research gaps and future trends of intelligent risk management in construction projects
Saka et al. (2023) [124]Review Paper Review on conversational AI systems, e.g., Natural Language Processing
Xiong et al. (2015) [57]Review Paper Critical review of SEM applications in construction
Basaif et al. (2020) [27]Review Paper Study on technology awareness of AI application for risk analysis in Malaysian construction projects
An et al. (2021) [15]Review Paper Literature review on five type of popular AI algorithms, including Primary Component Analysis, Multilayer Perceptron, fuzzy logic, Support Vector Machine and Genetic Algorithm
Okudan et al. (2021) [125]Review Paper Review of knowledge-based RM tools in construction projects using AI, ML, and fuzzy set
Abioye et al. (2021) [16]Review Paper Review on AI status, opportunities and future challenges in the construction industry
Adams (2008) [126]Review Paper Review on risk identification and analysis techniques in construction projects in the UK
Pan and Zhang (2021) [10]Review Paper A systematic literature review and qualitative analysis on the current state of AI adoption in the context of construction engineering and management and discussion on its future trends.
Wu et al. (2021) [122]Review Paper Safety risk investigation framework in urban rail transit engineering construction using AI algorithms and data clouds
Yucelgazi and Yitmen (2020) [112]ProbabilisticAnalytical network processing (ANP)Risk assessment for large infrastructure projects
Khodabakhshian and Re Cecconi (2022) [60]ProbabilisticBN, process miningRisk identification in construction projects
Chen et al. (2012) [127]ProbabilisticExpert system Knowledge managementEvaluating performance heterogeneity through a knowledge management maturity test in the building sector
Khademi et al. (2014) [128]ProbabilisticANP and AHPConstruction risk analysis
Liu et al. (2016) [129]ProbabilisticSEMInternational construction projects risk assessment
Lu et al. (2022) [130]PorbabilisticBN, fuzzy logicSystem risk management
Qazi et al. (2016) [67]ProbabilisticANP and BNRisk path measuring and modeling project complexity in construction projects
Khakzad et al. (2013) [97]ProbabilisticBNRisk analysis of offshore drilling operations
Boughaba and Bouabaz (2020) [131]Probabilistic and DeterministicANN, fuzzy logic, RNNAI-based tendering decision-making model considering the success and failure factors
Islam et al. (2017) [78]ProbabilisticMCSHybrid methods for risk assessment in construction projects
Samantra et al. (2017) [50]ProbabilisticFuzzy SetFuzzy-based risk assessment module for an underground metro rail station construction project
Tian et al. (2022) [132]ProbabilisticBNCrossed risk assessment of construction safety
Adeleke et al. (2018) [133]ProbabilisticSEMNigerian companies’ construction risk management
Chen et al. [94]ProbabilisticBN, fuzzy logicCatenary construction risk assessment based on expert fuzzy evaluation and BN
Kabir et al. (2016) [134]ProbabilisticANN, BN, and FTARisk assessment in energy projects
Chen et al. (2020) [135]ProbabilisticFuzzy set, ELECTRE III, multi-attribute decision makingFuzzy- and ELECTRE III-based construction bid evaluation framework under uncertainty
Moradi et al. (2022) [136]ProbabilisticBayesian neural networks, BNCondition and operation risk monitoring of complex engineering systems
Karakas et al. (2013) [110]ProbabilisticMultiagent systems, BN, fuzzy setMultiagent system to simulate risk-allocation and cost-sharing processes in construction projects
Eybpoosh et al. (2011) [29]ProbabilisticSEMRisk rath identification of international construction projects
Vagnoli and Remenyte-Prescott (2022) [137]ProbabilisticBNExpert knowledge elicitation into system monitoring data
Omondi et al. (2021) [105]ProbabilisticMCS, Markov chain model, Bayes’ theoremInvestigate how the capacity of probabilistic reasoning to handle uncertainty can be combined with the capacity of Markov chains to map the stochastic environmental phenomena to improve performance of tuning decisions under uncertainty
Valipour et al. (2016) [138]ProbabilisticFuzzy ANPHybrid fuzzy cybernetic model to identify shared risks in projects
Senova et al. (2023)ProbabilisticMCSFinancial risk assessment using Monte Carlo simulation
Kamari and Ham (2022) [33]DeterministicComputer vision, point cloud segmentation, digital twinningDeep-learning-based digital twinning framework for construction siter disaster preparedness
Fang et al. (2013) [113]DeterministicGARisk planning under resource constraints
Choi et al. (2021) [26]DeterministicNLP, text miningDeveloping a digital EPC contract risk analysis tool for contractors, using AI and text mining techniques
Wu and Lu (2022) [139]DeterministicRF, XGBoost, Bagging Regressor, SVR,AI-based for accident and safety risk assessment in bridge construction
Alshboul et al. (2022) [89]DeterministicXGBoost, KNN, ANN, DT, LightGBM, CatBoostLiquidated damages prediction in highway construction projects
Esmaeili and Hallowell (2012) [140]DeterministicDelphi method, SSRAMDeveloping a decision support system called scheduled-based safety risk assessment and management (SSRAM)
Habbal et al. (2020) [95]DeterministicANNANN-based planning risk forecasting model in construction projects
Yaseen et al. (2019) [12]DeterministicRF, GARisk delay prediction in construction projects by hybrid an AI model
Choi and Lee (2022) [141]DeterministicNLP, bi-directional long short-term memory (bi-LSTM)Contractor’s risk analysis of Engineering Procurement and
Construction (EPC) contracts Using Ontological Semantic
Model and bi-long short-term memory (LSTM) technology
Hosny et al. (2015) [96]DeterministicNNDevelopment of an NN-based predictive and decision awareness framework for construction claims using backward optimization.
Chattapadhyay et al. (2021) [86]DeterministicCross-analytical machine learning model, K-means clustering, GAExploiting different risk factors and their
impacts on the performance aspects of construction megaprojects
Valpeters et al. [87]DeterministicLogistic Regression, DT, Random Forestdetermination of the probability of contract execution at a stage of its establishment
Fan et al. (2020) [142]DeterministicNN, AHPDevelopment of a credit risk index system of water conservancy projects
Anysz et al. (2021) [107]DeterministicDecision Tree, ANNPredicting the result of a dispute
Zhong et al. (2021) [75]Deterministic and ProbabilisticCNN, fuzzy AHP, entropy weight methodCost and schedule risk prediction model for construction projects using 1D-CNN, EW, and FAHP.

References

  1. Wu, D.D.; Chen, S.H.; Olson, D.L. Business Intelligence in Risk Management: Some Recent Progresses. Inf. Sci. 2014, 256, 1–7. [Google Scholar] [CrossRef]
  2. Project Management Institute (PMI). A Guide to the Project Management Body of Knowledge (PMBOK Guide), 6th ed.; Project Management Institute, Inc.: Newtown Square, PA, USA, 2017. [Google Scholar]
  3. Li, J.; Wang, J.; Xu, N.; Hu, Y.; Cui, C. Importance Degree Research of Safety Risk Management Processes of Urban Rail Transit Based on Text Mining Method. Information 2018, 9, 26. [Google Scholar] [CrossRef]
  4. Zhong, R.Y.; Xu, X.; Klotz, E.; Newman, S.T. Intelligent Manufacturing in the Context of Industry 4.0: A Review. Engineering 2017, 3, 616–630. [Google Scholar] [CrossRef]
  5. Guzman-Urbina, A.; Aoyama, A.; Choi, E. A Polynomial Neural Network Approach for Improving Risk Assessment and Industrial Safety. ICIC Express Lett. 2018, 12, 97–107. [Google Scholar] [CrossRef]
  6. Chenya, L. Intelligent Risk Management in Construction Projects: Systematic Literature Review. IEEE Access 2022, 10, 72936–72954. [Google Scholar] [CrossRef]
  7. Darko, A.; Chan, A.P.C.; Adabre, M.A.; Edwards, D.J.; Hosseini, M.R.; Ameyaw, E.E.; Estate, R.; Hong, T.; Polytechnic, K.; Kong, H. Artificial Intelligence in the AEC Industry: Scientometric Analysis and Visualization of Research Activities. Autom. Constr. 2020, 112, 103081. [Google Scholar] [CrossRef]
  8. Yan, H.; Yang, N.; Peng, Y.; Ren, Y. Data Mining in the Construction Industry: Present Status, Opportunities, and Future Trends. Autom. Constr. 2020, 119, 103331. [Google Scholar] [CrossRef]
  9. Xu, H.; Chang, R.; Pan, M.; Li, H.; Liu, S.; Webber, R.J.; Zuo, J.; Dong, N. Application of Artificial Neural Networks in Construction Management: A Scientometric Review. Buildings 2022, 12, 952. [Google Scholar] [CrossRef]
  10. Pan, Y.; Zhang, L. Roles of Artificial Intelligence in Construction Engineering and Management: A Critical Review and Future Trends. Autom. Constr. 2021, 122, 103517. [Google Scholar] [CrossRef]
  11. Soust-verdaguer, B.; Llatas, C.; García-martínez, A. Critical Review of Bim-Based LCA Method to Buildings. Energy Build. 2017, 136, 110–120. [Google Scholar] [CrossRef]
  12. Yaseen, Z.M.; Ali, Z.H.; Salih, S.Q.; Al-ansari, N. Prediction of Risk Delay in Construction Projects Using a Hybrid Artificial Intelligence Model. Sustainability 2020, 12, 1514. [Google Scholar] [CrossRef]
  13. Purdy, M.; Daugherty, P. Why Artificial Intelligence Is the Future of Growth. In Remarks at AI Now: The Social and Economic Implications of Artificial Intelligence Technologies in the Near Term. 2016, pp. 1–72. Available online: https://www.accenture.com/t20161031T154852__w__/us-en/_acnmedia/PDF33/Accenture-Why-AI-is-the-Future-of-Growth.PDF#zoom=50 (accessed on 18 March 2023).
  14. Xia, N.; Zou, P.X.W.; Griffin, M.A.; Wang, X.; Zhong, R. Towards Integrating Construction Risk Management and Stake- Holder Management: A Systematic Literature Review and Future Research Agendas. Int. J. Proj. Manag. 2018, 36, 701–715. [Google Scholar] [CrossRef]
  15. An, Y.; Li, H.; Su, T.; Wang, Y. Determining Uncertainties in AI Applications in AEC Sector and Their Corresponding Mitigation Strategies. Autom. Constr. 2021, 131, 103883. [Google Scholar] [CrossRef]
  16. Abioye, S.O.; Oyedele, L.O.; Akanbi, L.; Ajayi, A.; Manuel, J.; Delgado, D.; Bilal, M.; Akinade, O.O.; Ahmed, A. Artificial Intelligence in the Construction Industry: A Review of Present Status, Opportunities and Future Challenges. J. Build. Eng. 2021, 44, 103299. [Google Scholar] [CrossRef]
  17. Kozlovska, M.; Klosova, D.; Strukova, Z. Impact of Industry 4.0 Platform on the Formation of Construction 4.0 Concept: A Literature Review. Sustainability 2021, 13, 2683. [Google Scholar] [CrossRef]
  18. Mellit, A.; Kalogirou, S.A. Artificial Intelligence Techniques for Photovoltaic Applications: A Review. Prog. Energy Combust. Sci. 2008, 34, 574–632. [Google Scholar] [CrossRef]
  19. Forcael, E.; Ferrari, I.; Opazo-vega, A. Construction 4.0: A Literature Review. Sustainability 2020, 12, 9755. [Google Scholar] [CrossRef]
  20. Hon, C.K.H.; Sun, C.; Xia, B.; Jimmieson, N.L.; Way, K.A.; Wu, P.P.Y. Applications of Bayesian Approaches in Construction Management Research: A Systematic Review. Eng. Constr. Archit. Manag. 2021, 29, 2153–2182. [Google Scholar] [CrossRef]
  21. Alshboul, O.; Shehadeh, A.; Almasabha, G.; Emhamed, R.; Mamlook, A.; Almuflih, A.S. Evaluating the Impact of External Support on Green Building Construction Cost: A Hybrid Mathematical and Machine Learning Prediction Approach. Buildings 2022, 12, 1256. [Google Scholar] [CrossRef]
  22. Siraj, N.B.; Fayek, A.R. Risk Identification and Common Risks in Construction: Literature Review and Content Analysis. J. Constr. Eng. Manag. 2019, 145, 03119004. [Google Scholar] [CrossRef]
  23. Ledig, C.; Theis, L.; Huszár, F.; Caballero, J.; Cunningham, A.; Acosta, A.; Aitken, A.P.; Tejani, A.; Totz, J.; Wang, Z.; et al. Photo-Realistic Single Image Super-Resolution Using a Generative Adversarial Network. arXiv 2017. [Google Scholar] [CrossRef]
  24. Fan, C.; Sun, Y.; Zhao, Y.; Song, M.; Wang, J. Deep Learning-Based Feature Engineering Methods for Improved Building Energy Prediction. Appl. Energy 2019, 240, 35–45. [Google Scholar] [CrossRef]
  25. Akinosho, T.D.; Oyedele, L.O.; Bilal, M.; Ajayi, A.O.; Delgado, M.D.; Akinade, O.O.; Ahmed, A.A. Deep Learning in the Construction Industry: A Review of Present Status and Future Innovations. J. Build. Eng. 2020, 32, 101827. [Google Scholar] [CrossRef]
  26. Choi, S.J.; Choi, S.W.; Kim, J.H.; Lee, E.B. AI and Text-mining Applications for Analyzing Contractor’s Risk in Invitation to Bid (ITB) and Contracts for Engineering Procurement and Construction (EPC) Projects. Energies 2021, 14, 4632. [Google Scholar] [CrossRef]
  27. Basaif, A.A.; Alashwal, A.M.; Mohd-Rahim, F.A.; Karim, S.B.A.; Loo, S.C. Technology Awareness of Artificial Intelligence (Ai) Application for Risk Analysis in Construction Projects. Malays. Constr. Res. J. 2020, 9, 182–195. [Google Scholar]
  28. Oztemel, E.; Gursev, S. Literature Review of Industry 4.0 and Related Technologies. J. Intell. Manuf. 2020, 31, 127–182. [Google Scholar] [CrossRef]
  29. Eybpoosh, M.; Dikmen, I.; Talat Birgonul, M. Identification of Risk Paths in International Construction Projects Using Structural Equation Modeling. J. Constr. Eng. Manag. 2011, 137, 1164–1175. [Google Scholar] [CrossRef]
  30. Low Choy, S.; O’leary, R.; Mengersen, K. Elicitation by Design in Ecology: Using Expert Opinion to Inform Priors for Bayesian Statistical Models. Ecology 2009, 90, 265–277. [Google Scholar] [CrossRef]
  31. Cárdenas, I.C.; Al-Jibouri, S.S.H.; Halman, J.I.M.; van Tol, F.A. Modeling Risk-Related Knowledge in Tunneling Projects. Risk Anal. 2014, 34, 323–339. [Google Scholar] [CrossRef]
  32. Karimiazari, A.; Mousavi, N.; Mousavi, S.F.; Hosseini, S. Risk Assessment Model Selection in Construction Industry. Expert Syst. Appl. 2011, 38, 9105–9111. [Google Scholar] [CrossRef]
  33. Kamari, M.; Ham, Y. AI-Based Risk Assessment for Construction Site Disaster Preparedness through Deep Learning-Based Digital Twinning. Autom. Constr. 2022, 134, 104091. [Google Scholar] [CrossRef]
  34. Debnath, J.; Biswas, A.; Sivan, P.; Nirmalya, K. International Journal of Industrial Ergonomics Fuzzy Inference Model for Assessing Occupational Risks in Construction Sites. Int. J. Ind. Ergon. 2016, 55, 114–128. [Google Scholar] [CrossRef]
  35. Gelman, A.; Carlin, J.B.; Stern, H.S.; Dunson, D.B.; Vehtari, A.; Rubin, D.B. Bayesian Data Analysis, 3rd ed.; CRC Press: Boca Raton, FL, USA, 2013. [Google Scholar] [CrossRef]
  36. Senova, A.; Tobisova, A.; Rozenberg, R. New Approaches to Project Risk Assessment Utilizing the Monte Carlo Method. Sustainability 2023, 15, 1006. [Google Scholar] [CrossRef]
  37. El-sayegh, S.M.; Manjikian, S.; Ibrahim, A.; Abouelyousr, A.; Jabbour, R. Risk Identification and Assessment in Sustainable Construction Projects in the UAE. Int. J. Constr. Manag. 2021, 21, 327–336. [Google Scholar] [CrossRef]
  38. Pareto, V.; Bousquet, G.H.; Busino, G. Cours d’Économie Politique: Nouvelle Édition; Librairie Droz: Geneva, Switzerland, 1964. [Google Scholar]
  39. Liu, M. Program Evaluation and Review Technique (PERT) in Construction Risk Analysis. Appl. Mech. Mater. 2013, 360, 2334–2337. [Google Scholar] [CrossRef]
  40. Pickering, C.; Byrne, J. The Benefits of Publishing Systematic Quantitative Literature Reviews for PhD Candidates and Other Early-Career Researchers. High. Educ. Res. Dev. 2014, 33, 534–548. [Google Scholar] [CrossRef]
  41. Li, H.; Liu, R.; Li, L.; Liu, Z.; Lu, S.; Pan, L.; Lin, A. A Framework for Occupational Risk Assessment in Power Grid Using AHP Method. In Data Processing Techniques and Applications for Cyber-Physical Systems (DPTA 2019), Advances in Intelligent Systems and Computing 1088; Huang, C., Chan, Y.W., Yan, N., Eds.; Springer: Singapore, 2020; pp. 817–822. [Google Scholar] [CrossRef]
  42. Cao, Y.; Zandi, Y.; Agdas, A.S.; Wang, Q.; Qian, X.; Fu, L.; Wakil, K.; Selmi, A.; Issakhov, A.; Roco-Videla, A. A Review Study of Application of Artificial Intelligence in Construction Management and Composite Beams. Steel Compos. Struct. 2021, 39, 685–700. [Google Scholar] [CrossRef]
  43. Donthu, N.; Kumar, S.; Mukherjee, D.; Pandey, N.; Marc, W. How to Conduct a Bibliometric Analysis: An Overview and Guidelines. J. Bus. Res. 2021, 133, 285–296. [Google Scholar] [CrossRef]
  44. Braun, V.; Clarke, V. Using Thematic Analysis in Psychology. Qual. Res. Psychol. 2006, 3, 77–101. [Google Scholar] [CrossRef]
  45. Fan, H.; Li, H. Retrieving Similar Cases for Alternative Dispute Resolution in Construction Accidents Using Text Mining Techniques. Autom. Constr. 2013, 34, 85–91. [Google Scholar] [CrossRef]
  46. Xu, N.; Ma, L.; Liu, Q.; Wang, L.; Deng, Y. An Improved Text Mining Approach to Extract Safety Risk Factors from Construction Accident Reports. Saf. Sci. 2021, 138, 105216. [Google Scholar] [CrossRef]
  47. Zhang, F.; Zhang, F.; Fleyeh, H.; Wang, X.; Lu, M. Construction Site Accident Analysis Using Text Mining and Natural Language Processing Techniques. Autom. Constr. 2019, 99, 238–248. [Google Scholar] [CrossRef]
  48. Berthelot, D.; Milanfar, P.; Goodfellow, I. Creating High Resolution Images with a Latent Adversarial Generator. arXiv 2020. [Google Scholar] [CrossRef]
  49. Laitila, P.; Virtanen, K. Improving Construction of Conditional Probability Tables for Ranked Nodes in Bayesian Networks. IEEE Trans. Knowl. Data Eng. 2016, 28, 1691–1705. [Google Scholar] [CrossRef]
  50. Samantra, C.; Datta, S.; Mahapatra, S.S. Fuzzy Based Risk Assessment Module for Metropolitan Construction Project: An Empirical Study. Eng. Appl. Artif. Intell. 2017, 65, 449–464. [Google Scholar] [CrossRef]
  51. Zhang, L.; Skibniewski, M.J.; Wu, X.; Chen, Y.; Deng, Q. A Probabilistic Approach for Safety Risk Analysis in Metro Construction AND. Saf. Sci. 2014, 63, 8–17. [Google Scholar] [CrossRef]
  52. Dikmen, I.; Birgonul, M.T.; Han, S. Using Fuzzy Risk Assessment to Rate Cost Overrun Risk in International Construction Projects. Int. J. Proj. Manag. 2007, 25, 494–505. [Google Scholar] [CrossRef]
  53. Phan, T.D.; Smart, J.C.R.; Capon, S.J.; Hadwen, W.L. Environmental Modelling & Software Applications of Bayesian Belief Networks in Water Resource Management: A Systematic Review. Environ. Model. Softw. 2016, 85, 98–111. [Google Scholar] [CrossRef]
  54. Zhang, L.; Wu, X.; Qin, Y.; Skibniewski, M.J.; Liu, W. Towards a Fuzzy Bayesian Network Based Approach for Safety Risk Analysis of Tunnel-Induced Pipeline Damage. Risk Anal. 2016, 36, 278–301. [Google Scholar] [CrossRef]
  55. Bar-hillel, M.; Neter, E. How Alike Is It Versus How Likely Is It: A Disjunction Fallacy in Probability Judgments. J. Personal. Soc. Psychol. 1993, 65, 1119–1131. [Google Scholar] [CrossRef]
  56. Wee, Y.Y.; Cheah, W.P.; Tan, S.C.; Wee, K. A Method for Root Cause Analysis with a Bayesian Belief Network and Fuzzy Cognitive Map. Expert Syst. Appl. 2015, 42, 468–487. [Google Scholar] [CrossRef]
  57. Xiong, B.; Skitmore, M.; Xia, B. A Critical Review of Structural Equation Modeling Applications in Construction Research. Autom. Constr. 2015, 49, 59–70. [Google Scholar] [CrossRef]
  58. Liu, W.; Zhao, T.; Zhou, W.; Tang, J. Safety Risk Factors of Metro Tunnel Construction in China: An Integrated Study with EFA and SEM. Saf. Sci. 2018, 105, 98–113. [Google Scholar] [CrossRef]
  59. Borujeni, S.E.; Nannapaneni, S.; Nguyen, N.H.; Behrman, E.C.; Steck, J.E. Quantum Circuit Representation of Bayesian Networks. Expert Syst. Appl. 2021, 176, 114768. [Google Scholar] [CrossRef]
  60. Khodabakhshian, A.; Re Cecconi, F. Data-Driven Process Mining Framework for Risk Management in Construction Projects. In Proceedings of the IOP Conference Series: Earth and Environmental Science, Melbourne, Australia, 27–30 June 2022; IOP Publishing: Bristol, UK, 2022. [Google Scholar] [CrossRef]
  61. Liu, A.; Jiao, Y.; Li, A.; Li, X. Key Risk Assessment of Urban Rail Transit PPP Project Construction Based on Bayesian Network. Sustainability 2021, 13, 11507. [Google Scholar] [CrossRef]
  62. Pokorádi, L. Risk Assessment Based upon Fuzzy Set Theory. In Proceedings of the 15th Building Services, Mechanical and Building Industry Days, Debrecen, Hungary, 15–16 October 2009. [Google Scholar]
  63. Fayek, A.R.; Ph, D.; Eng, P.; Asce, M. Fuzzy Logic and Fuzzy Hybrid Techniques for Construction Engineering and Management. J. Constr. Eng. Manag. 2020, 146, 04020064. [Google Scholar] [CrossRef]
  64. Chen, H.; Zhang, L.; Wu, X. Performance Risk Assessment in Public–Private Partnership Projects Based on Adaptive Fuzzy Cognitive Map. Appl. Soft Comput. J. 2020, 93, 106413. [Google Scholar] [CrossRef]
  65. Afzal, F.; Yunfei, S.; Nazir, M.; Bhatti, S.M. A Review of Artificial Intelligence Based Risk Assessment Methods for Capturing Complexity-Risk Interdependencies: Cost Overrun in Construction Projects. Int. J. Manag. Proj. Bus. 2019, 14, 300–328. [Google Scholar] [CrossRef]
  66. Floyd, M.K.; Barker, K.; Rocco, C.M.; Whitman, M.G. A Multi-Criteria Decision Analysis Technique for Stochastic Task Criticality in Project Management. Eng. Manag. J. 2017, 29, 165–178. [Google Scholar] [CrossRef]
  67. Qazi, A.; Quigley, J.; Dickson, A.; Kirytopoulos, K. Project Complexity and Risk Management (ProCRiM): Towards Modelling Project Complexity Driven Risk Paths in Construction Projects. Int. J. Proj. Manag. 2016, 34, 1183–1198. [Google Scholar] [CrossRef]
  68. Lee, J.; Kim, Y. Analysis of Cost-Increasing Risk Factors in Modular Construction in Korea Using FMEA. KSCE J. Civ. Eng. 2017, 21, 1999–2010. [Google Scholar] [CrossRef]
  69. Ferdous, R.; Khan, F.; Sadiq, R.; Amyotte, P.; Veitch, B. Fault and Event Tree Analyses for Process Systems Risk Analysis: Uncertainty Handling Formulations. Risk Anal. 2011, 31, 86–107. [Google Scholar] [CrossRef]
  70. Kim, D.Y.; Han, S.H.; Kim, H.; Park, H. Structuring the Prediction Model of Project Performance for International Construction Projects: A Comparative Analysis. Expert Syst. Appl. 2009, 36, 1961–1971. [Google Scholar] [CrossRef]
  71. Chan, A.P.C.; Chan, D.W.M.; Yeung, J.F.Y. Overview of the Application of ‘Fuzzy Techniques’ in Construction Management Research. J. Constr. Eng. Manag. 2009, 135, 1241–1252. [Google Scholar] [CrossRef]
  72. Zhao, X.; Hwang, B.; Gao, Y. A Fuzzy Synthetic Evaluation Approach for Risk Assessment: A Case of Singapore’s Green Projects. J. Clean. Prod. 2016, 115, 203–213. [Google Scholar] [CrossRef]
  73. Kabir, G.; Sadiq, R.; Tesfamariam, S. A Fuzzy Bayesian Belief Network for Safety Assessment of Oil and Gas Pipelines. Struct. Infrastruct. Eng. 2015, 12, 874–889. [Google Scholar] [CrossRef]
  74. Shafiee, M. A Fuzzy Analytic Network Process Model to Mitigate the Risks. Expert Syst. Appl. 2014, 42, 2143–2152. [Google Scholar] [CrossRef]
  75. Zhong, Y.; Li, H.; Chen, L. Construction Project Risk Prediction Model Based on EW-FAHP and One Dimensional Convolution Neural Network. PLoS ONE 2021, 16, e0246539. [Google Scholar] [CrossRef]
  76. Cheng, M.; Lu, Y. Developing a Risk Assessment Method for Complex Pipe Jacking Construction Projects. Autom. Constr. 2015, 58, 48–59. [Google Scholar] [CrossRef]
  77. Liu, M.; Ling, Y.Y. Modeling a Contractor’s Markup Estimation. J. Constr. Eng. Manag. 2005, 131, 391–399. [Google Scholar] [CrossRef]
  78. Islam, M.S.; Nepal, M.P.; Skitmore, M.; Attarzadeh, M. Current Research Trends and Application Areas of Fuzzy and Hybrid Methods to the Risk Assessment of Construction Projects. Adv. Eng. Inform. 2017, 33, 112–131. [Google Scholar] [CrossRef]
  79. Petroutsatou, K.; Vagdatli, T.; Maravas, A. Probabilistic Approach of Pre-Estimating Life-Cycle Costs of Road Tunnels. Struct. Infrastruct. Eng. 2023, 1–16. [Google Scholar] [CrossRef]
  80. Flath, D.C.; Nicolay, D.D.; Conte, T.; Van Dinther, P.D.C.; Filipova-neumann, L. Cluster Analysis of Smart Metering Data. An Implementation in Practice. Bus. Inf. Syst. Eng. 2012, 4, 31–39. [Google Scholar] [CrossRef]
  81. Hegde, J.; Rokseth, B. Applications of Machine Learning Methods for Engineering Risk Assessment–A Review. Saf. Sci. 2020, 122, 104492. [Google Scholar] [CrossRef]
  82. Bengio, Y.; Courville, A.; Vincent, P. Representation Learning: A Review and New Perspectives. IEEE Trans. Pattern Anal. Mach. Intell. 2013, 35, 1798–1828. [Google Scholar] [CrossRef] [PubMed]
  83. Gondia, A.; Siam, A.; El-Dakhakhni, W.; Nassar, A.H. Machine Learning Algorithms for Construction Projects Delay Risk Prediction. J. Constr. Eng. Manag. 2020, 146, 04019085. [Google Scholar] [CrossRef]
  84. Liu, H.; Yang, J.F.; Zhang, Z.Y. The Risk Evaluation Model of Construction Project Contract Based on BP Neural Network. Appl. Mech. Mater. 2013, 357–360, 2304–2307. [Google Scholar] [CrossRef]
  85. Jallan, Y.; Ashuri, B. Text Mining of the Securities and Exchange Commission Financial Filings of Publicly Traded Construction Firms Using Deep Learning to Identify and Assess Risk. J. Constr. Eng. Manag. 2020, 146, 04020137. [Google Scholar] [CrossRef]
  86. Chattapadhyay, D.B.; Putta, J.; Rama Mohan Rao, P. Risk Identification, Assessments, and Prediction for Mega Construction Projects: A Risk Prediction Paradigm Based on Cross Analytical-Machine Learning Model. Buildings 2021, 11, 172. [Google Scholar] [CrossRef]
  87. Valpeters, M.; Kireev, I.; Ivanov, N. Application of Machine Learning Methods in Big Data Analytics at Management of Contracts in the Construction Industry. MATEC Web Conf. 2018, 170, 01106. [Google Scholar] [CrossRef]
  88. Joukar, A.; Nahmens, I. Volatility Forecast of Construction Cost Index Using General Autoregressive Conditional Heteroskedastic Method. J. Constr. Eng. Manag. 2016, 142, 04015051. [Google Scholar] [CrossRef]
  89. Alshboul, O.; Shehadeh, A.; Mamlook, R.E.; Al Almasabha, G.; Almuflih, A.S.; Alghamdi, S.Y. Prediction Liquidated Damages via Ensemble Machine Learning Model: Towards Sustainable Highway Construction Projects. Sustainability 2022, 14, 9303. [Google Scholar] [CrossRef]
  90. Goh, Y.M.; Chua, D. Neural Network Analysis of Construction Safety Management Systems: A Case Study in Singapore. Constr. Manag. Econ. 2013, 31, 460–470. [Google Scholar] [CrossRef]
  91. Gajzler, M. The Idea of Knowledge Supplementation and Explanation Using Neural Networks to Support Decisions in Construction Engineering. Procedia Eng. 2013, 57, 302–309. [Google Scholar] [CrossRef]
  92. Jin, X.H.; Zhang, G. Modelling Optimal Risk Allocation in PPP Projects Using Artificial Neural Networks. Int. J. Proj. Manag. 2011, 29, 591–603. [Google Scholar] [CrossRef]
  93. Chenyun, Y.Z. The BP Artificial Neural Network Model on Expressway Construction Phase Risk. Syst. Eng. Procedia 2012, 4, 409–415. [Google Scholar] [CrossRef]
  94. Chen, Y.; Li, X.; Wang, J.; Liu, M.; Cai, C.; Shi, Y. Research on the Application of Fuzzy Bayesian Network in Risk Assessment of Catenary Construction. Mathematics 2023, 11, 1719. [Google Scholar] [CrossRef]
  95. Habbal, F.; Habbal, F.; Alnuaimi, A.; Alshimmari, A.; Alhanaee, N.; Safi, A. Applying Ann to the Ai Utilization in Forecasting Planning Risks in Construction. In Proceedings of the 37th International Symposium on Automation and Robotics in Construction: From Demonstration to Practical Use—To New Stage of Construction Robot (ISARC 2020), Kitakyushu, Japan, 27–28 October 2020; pp. 1431–1437. [Google Scholar] [CrossRef]
  96. Hosny, O.A.; Elbarkouky, M.M.G.; Elhakeem, A. Construction Claims Prediction and Decision Awareness Framework Using Artificial Neural Networks and Backward Optimization. J. Constr. Eng. Proj. Manag. 2015, 1, 11–19. [Google Scholar] [CrossRef]
  97. Khakzad, N.; Khan, F.; Amyotte, P. Quantitative Risk Analysis of Offshore Drilling Operations: A Bayesian Approach. Saf. Sci. 2013, 57, 108–117. [Google Scholar] [CrossRef]
  98. Mkrtchyan, L.; Podofillini, L.; Dang, V.N. Bayesian Belief Networks for Human Reliability Analysis: A Review of Applications and Gaps. Reliab. Eng. Syst. Saf. 2015, 139, 1–16. [Google Scholar] [CrossRef]
  99. Butler, A.J.; Thomas, M.K.; Pintar, K.D.M. Systematic Review of Expert Elicitation Methods as a Tool for Source Attribution of Enteric Illness. Foodborne Pathog. Dis. 2015, 12, 367–382. [Google Scholar] [CrossRef]
  100. Re Cecconi, F.; Khodabakhshian, A.; Rampini, L. Data-Driven Decision Support System for Building Stocks Energy Retrofit Policy. J. Build. Eng. 2022, 54, 104633. [Google Scholar] [CrossRef]
  101. Nguyen, L.D.; Tran, D. An Approach to the Assessment of Fall Risk for Building Construction. In Proceedings of the 2016 Construction Research Congress, San Juan, PR, USA, 31 May–2 June 2016; pp. 1803–1812. [Google Scholar] [CrossRef]
  102. Lele, S.R.; Allen, K.L. On Using Expert Opinion in Ecological Analyses: A Frequentist Approach. Environmetrics 2006, 17, 683–704. [Google Scholar] [CrossRef]
  103. Mohamed, M.; Tran, D.Q. Risk-Based Inspection for Concrete Pavement Construction Using Fuzzy Sets and Bayesian Networks. Autom. Constr. 2021, 128, 103761. [Google Scholar] [CrossRef]
  104. Regan, H.M.; Colyvan, M.; Burgman, A. A Taxonomy and Treatment of Uncertainty for Ecology and Conservation Biology A Taxonomy and Treatment of Uncertainty for Ecology. Ecol. Appl. 2002, 12, 618–628. [Google Scholar] [CrossRef]
  105. Omondi, A.O.; Lukandu, I.A.; Wanyembi, G. Probabilistic Reasoning and Markov Chains as Means to Improve Performance of Tuning Decisions under Uncertainty. Technol. J. Artif. Intell. Data Min. 2021, 9, 99–108. [Google Scholar] [CrossRef]
  106. Wang, P.; Fenn, P.; Wang, K.; Huang, Y. A Bayesian Belief Network Predictive Model for Construction Delay Avoidance in the UK. Eng. Constr. Archit. Manag. 2021, 29, 2011–2026. [Google Scholar] [CrossRef]
  107. Anysz, H.; Apollo, M.; Grzyl, B. Quantitative Risk Assessment in Construction Disputes Based on Machine Learning Tools. Symmetry 2021, 13, 744. [Google Scholar] [CrossRef]
  108. Tardioli, G.; Narayan, A.; Kerrigan, R.; Oates, M.; O’Donnell, J.; Finn, D.P. A Methodology for Calibration of Building Energy Models at District Scale Using Clustering and Surrogate Techniques. Energy Build. 2020, 226, 110309. [Google Scholar] [CrossRef]
  109. Yang, Z.; Bonsall, S.; Wang, J. Fuzzy Rule-Based Bayesian Reasoning Approach for Prioritization of Failures in FMEA. IEEE Trans. Reliab. 2008, 57, 517–528. [Google Scholar] [CrossRef]
  110. Karakas, K.; Dikmen, I.; Birgonul, M.T. Multiagent System to Simulate Risk-Allocation and Cost-Sharing Processes in Construction Projects. J. Comput. Civ. Eng. 2013, 27, 307–319. [Google Scholar] [CrossRef]
  111. Islam, M.S.; Nepal, M.P.; Skitmore, M.; Kabir, G. A Knowledge-Based Expert System to Assess Power Plant Project Cost Overrun Risks. Expert Syst. Appl. 2019, 136, 12–32. [Google Scholar] [CrossRef]
  112. Yucelgazi, F.; Yitmen, I. An ANP Model for Risk Assessment in Large-Scale Transport. Arab. J. Sci. Eng. 2020, 44, 4257–4275. [Google Scholar] [CrossRef]
  113. Fang, C.; Marle, F. Dealing with Project Complexity by Matrix-Based Propagation Modelling for Project Risk Analysis. J. Eng. Des. 2013, 24, 239–256. [Google Scholar] [CrossRef]
  114. Serpella, A.F.; Ferrada, X.; Howard, R.; Rubio, L. Risk Management in Construction Projects: A Knowledge-Based Approach. Procedia-Soc. Behav. Sci. 2014, 119, 653–662. [Google Scholar] [CrossRef]
  115. Zhang, L.; Wu, X.; Skibniewski, M.J.; Zhong, J.; Lu, Y. Bayesian-Network-Based Safety Risk Analysis in Construction Projects. Reliab. Eng. Syst. Saf. 2014, 131, 29–39. [Google Scholar] [CrossRef]
  116. Sherafat, B.; Ahn, C.R.; Akhavian, R.; Behzadan, A.H.; Golparvar-Fard, M.; Kim, H.; Lee, Y.-C.; Rashidi, A.; Azar, E.R. Automated Methods for Activity Recognition of Construction Workers and Equipment: State-of-the-Art Review. J. Constr. Eng. Manag. 2020, 146, 03120002. [Google Scholar] [CrossRef]
  117. Von Platten, J.; Sandels, C.; Jörgensson, K.; Karlsson, V.; Mangold, M.; Mjörnell, K. Using Machine Learning to Enrich Building Databases-Methods for Tailored Energy Retrofits. Energies 2020, 13, 2574. [Google Scholar] [CrossRef]
  118. Wisse, B.W.; Gosliga, S.P.; Van Elst, N.P.; Van Barros, A.I. Relieving the Elicitation Burden of Bayesian Belief Networks. In Proceedings of the BMAW’08: Proceedings of the Sixth UAI Conference on Bayesian Modeling Applications Workshop, Helsinki, Finland, 9 July 2008; Volume 406, pp. 10–20. [Google Scholar]
  119. Giannakos, L.; Xenidis, Y. Risk Assessment in Construction Projects with the Use of Neural Networks. In Safety and Reliability–Safe Societies in a Changing World; CRC Press: Boca Raton, FL, USA, 2018; pp. 1563–1570. [Google Scholar] [CrossRef]
  120. Lamine, E.; Thabet, R.; Sienou, A.; Bork, D.; Fontanili, F.; Pingaud, H. BPRIM: An Integrated Framework for Business Process Management and Risk Management. Comput. Ind. 2020, 117, 103199. [Google Scholar] [CrossRef]
  121. Rao, W.; Chen, J. Risk Control System of Construction Engineering Based on Data Mining and Artificial Intelligence Technology. Adv. Intell. Syst. Comput. 2020, 1088, 1915–1923. [Google Scholar] [CrossRef]
  122. Wu, Y.; Zhao, L.Y.; Jiang, Y.X.; Li, W.; Wang, Y.S.; Zhao, H.; Wu, W.; Zhang, X.J. Research and Application of Intelligent Monitoring System Platform for Safety Risk and Risk Investigation in Urban Rail Transit Engineering Construction. Adv. Civ. Eng. 2021, 2021, 1–10. [Google Scholar] [CrossRef]
  123. Love, P.E.D.; Matthews, J.; Fang, W. Reflections on the Risk and Uncertainty of Rework in Construction. J. Constr. Eng. Manag. 2021, 147, 2–5. [Google Scholar] [CrossRef]
  124. Saka, A.B.; Oyedele, L.O.; Akanbi, L.A.; Ganiyu, S.A.; Chan, D.W.M.; Bello, S.A. Advanced Engineering Informatics Conversational Artificial Intelligence in the AEC Industry: A Review of Present Status, Challenges and Opportunities. Adv. Eng. Inform. 2023, 55, 101869. [Google Scholar] [CrossRef]
  125. Okudan, O.; Budayan, C.; Dikmen, I. A Knowledge-Based Risk Management Tool for Construction Projects Using Case-Based Reasoning. Expert Syst. Appl. 2021, 173, 114776. [Google Scholar] [CrossRef]
  126. Adams, F.K. Construction Contract Risk Management: A Study of Practices in the United Kingdom. Cost Eng. 2008, 50, 22–33. [Google Scholar]
  127. Chen, L.; Fong, P.S.W. Expert Systems with Applications Revealing Performance Heterogeneity through Knowledge Management Maturity Evaluation: A Capability-Based Approach. Expert Syst. Appl. 2012, 39, 13523–13539. [Google Scholar] [CrossRef]
  128. Khademi, N.; Behnia, K.; Saedi, R. Using Analytic Hierarchy/Network Process (AHP/ANP) in Developing Countries: Shortcomings and Suggestions. Eng. Econ. 2014, 59, 2–29. [Google Scholar] [CrossRef]
  129. Liu, J.; Zhao, X.; Yan, P. Risk Paths in International Construction Projects: Case Study from Chinese Contractors. J. Constr. Eng. Manag. 2016, 142, 05016002. [Google Scholar] [CrossRef]
  130. Lu, L.; Goerlandt, F.; Banda, O.A.V.; Kujala, P. Developing Fuzzy Logic Strength of Evidence Index and Application in Bayesian Networks for System Risk Management. Expert Syst. Appl. 2022, 192, 116374. [Google Scholar] [CrossRef]
  131. Boughaba, A.; Bouabaz, M. Identification and Risk Management Related to Construction Projects. Adv. Comput. Des. 2020, 5, 445–465. [Google Scholar] [CrossRef]
  132. Tian, Z.; Chen, Q.; Zhang, T. A Method for Assessing the Crossed Risk of Construction Safety. Saf. Sci. 2022, 146, 105531. [Google Scholar] [CrossRef]
  133. Adeleke, A.Q.; Bahaudin, A.Y.; Kamaruddeen, A.M.; Bamgbade, J.A.; Salimon, M.G.; Khan, M.W.A.; Sorooshian, S. The Influence of Organizational External Factors on Construction Risk Management among Nigerian Construction Companies. Saf. Health Work 2018, 9, 115–124. [Google Scholar] [CrossRef]
  134. Yazdi, M.; Kabir, S. A Fuzzy Bayesian Network Approach for Risk Analysis in Process Industries. Process Saf. Environ. Prot. 2017, 111, 507–519. [Google Scholar] [CrossRef]
  135. Chen, Z.S.; Zhang, X.; Pedrycz, W.; Wang, X.J.; Skibniewski, M.J. Bid Evaluation in Civil Construction under Uncertainty: A Two-Stage LSP-ELECTRE III-Based Approach. Eng. Appl. Artif. Intell. 2020, 94, 103835. [Google Scholar] [CrossRef]
  136. Moradi, R.; Cofre-Martel, S.; Lopez Droguett, E.; Modarres, M.; Groth, K.M. Integration of Deep Learning and Bayesian Networks for Condition and Operation Risk Monitoring of Complex Engineering Systems. Reliab. Eng. Syst. Saf. 2022, 222, 108433. [Google Scholar] [CrossRef]
  137. Vagnoli, M.; Remenyte-prescott, R. Updating Conditional Probabilities of Bayesian Belief Networks by Merging Expert Knowledge and System Monitoring Data. Autom. Constr. 2022, 140, 104366. [Google Scholar] [CrossRef]
  138. Valipour, A.; Yahaya, N.; Md Noor, N.; Mardani, A.; Antucheviciene, J. A New Hybrid Fuzzy Cybernetic Analytic Network Process Model to Identify Shared Risks in PPP Projects. Int. J. Strateg. Prop. Manag. 2016, 20, 409–426. [Google Scholar] [CrossRef]
  139. Wu, Y.; Lu, P. Comparative Analysis and Evaluation of Bridge Construction Risk with Multiple Intelligent Algorithms. Math. Probl. Eng. 2022, 2022, 1–12. [Google Scholar] [CrossRef]
  140. Esmaeili, B.; Hallowell, M. Integration of Safety Risk Data with Highway Construction Schedules. Constr. Manag. Econ. 2013, 31, 528–541. [Google Scholar] [CrossRef]
  141. Choi, S.-W.; Lee, E.-B. Contractor’s Risk Analysis of Engineering Procurement and Construction (EPC) Contracts Using Ontological Semantic Model and Bi-Long Short-Term Memory (LSTM) Technology. Sustainability 2022, 14, 6938. [Google Scholar] [CrossRef]
  142. Fan, X.; Li, Q.; Xu, Z. Green Credit Risk Assessment under the Background of Water Ecological Civilization City ConstructionBased on BP Neural Network Model. In IOP Conference Series: Earth and Environmental Science; IOP Publishing: Bristol, UK, 2020; Volume 446. [Google Scholar] [CrossRef]
Figure 1. Pillars of Industry 4.0 Revolution in the Construction Industry [7,8,10,16,17,19].
Figure 1. Pillars of Industry 4.0 Revolution in the Construction Industry [7,8,10,16,17,19].
Buildings 13 01312 g001
Figure 3. Systematic literature review flowchart based on PRISMA.
Figure 3. Systematic literature review flowchart based on PRISMA.
Buildings 13 01312 g003
Figure 4. Co-occurrence diagram of keywords/research areas of source papers. Buildings 13 01312 i001 AI algorithms, Buildings 13 01312 i002 decision support systems, Buildings 13 01312 i003 RM domains Buildings 13 01312 i004 construction project disciplines, Buildings 13 01312 i005 health and safety.
Figure 4. Co-occurrence diagram of keywords/research areas of source papers. Buildings 13 01312 i001 AI algorithms, Buildings 13 01312 i002 decision support systems, Buildings 13 01312 i003 RM domains Buildings 13 01312 i004 construction project disciplines, Buildings 13 01312 i005 health and safety.
Buildings 13 01312 g004
Figure 5. Annual scientific publication rate in the research area.
Figure 5. Annual scientific publication rate in the research area.
Buildings 13 01312 g005
Figure 6. Trending topics in the domain within the past 15 years.
Figure 6. Trending topics in the domain within the past 15 years.
Buildings 13 01312 g006
Table 1. Analytical comparison between probabilistic and deterministic RM models.
Table 1. Analytical comparison between probabilistic and deterministic RM models.
Comparison CriteriaProbabilistic ApproachDeterministic Approach
Reasoning basisProbability-based reasoning
Rule-based reasoning
Fuzzy logic [44,50,87,94]
Forward propagation and backpropagation
Loss function
Weights and biases [95,96]
StructureInterconnected graphs [67,68,97]Layers of neurons or branches [91,92]
Data SourceHistorical Data, model simulation
Experts’ opinion [98,99]
Historical data, model simulation [95,96,100]
InferenceBayesian inference [101]Frequentist inference [102]
Data RequirementsLimited amount of data
Able to deal with missing values
Numerical, categorical, and linguistic data [103,104]
High amount of data
Partial ability to deal with missing values [24]
Probability and dependencies’ roleEmbrace probability in assessments
Considering variables interdependencies with each other and final output [105,106]
Does not embrace probability in assessments
Considering variables interdependencies on final output [87,107]
Prediction precisionMid-high [108]Very high [25]
Application scopeSubjective and uncertain problems with limited data [109]Objective and complex problems with abundant data [83]
Application in RM processesRisk identification
Qualitative analysis
Risk control [110,111,112]
Risk identification
Qualitative and quantitative analysis
Mitigation planning
Risk control [86,87,113]
AdvantagesFlexibility to various problems
Ability to integrate qualitative and quantitative data (subjective and objective)
Risk path approach
Ability to include dynamic data [114,115]
Quick processing and learning
Ability to consider linear and nonlinear relationships among data
Ability to include dynamic data [116,117]
DisadvantagesTakes longer time to create the structure
Not high precision if merely based on historical data
High processing time in complex problems [67,118]
Individual risk analysis approach (isolated)
Not flexible toward change
Requirement of high data volume [119,120]
Disclaimer/Publisher’s Note: The statements, opinions and data contained in all publications are solely those of the individual author(s) and contributor(s) and not of MDPI and/or the editor(s). MDPI and/or the editor(s) disclaim responsibility for any injury to people or property resulting from any ideas, methods, instructions or products referred to in the content.

Share and Cite

MDPI and ACS Style

Khodabakhshian, A.; Puolitaival, T.; Kestle, L. Deterministic and Probabilistic Risk Management Approaches in Construction Projects: A Systematic Literature Review and Comparative Analysis. Buildings 2023, 13, 1312. https://doi.org/10.3390/buildings13051312

AMA Style

Khodabakhshian A, Puolitaival T, Kestle L. Deterministic and Probabilistic Risk Management Approaches in Construction Projects: A Systematic Literature Review and Comparative Analysis. Buildings. 2023; 13(5):1312. https://doi.org/10.3390/buildings13051312

Chicago/Turabian Style

Khodabakhshian, Ania, Taija Puolitaival, and Linda Kestle. 2023. "Deterministic and Probabilistic Risk Management Approaches in Construction Projects: A Systematic Literature Review and Comparative Analysis" Buildings 13, no. 5: 1312. https://doi.org/10.3390/buildings13051312

Note that from the first issue of 2016, this journal uses article numbers instead of page numbers. See further details here.

Article Metrics

Back to TopTop