Next Article in Journal
Facilitating Building Projects’ Short-Term and Long-Term Value Creation
Next Article in Special Issue
A Social Network-Based Examination on Bid Riggers’ Relationships in the Construction Industry: A Case Study of China
Previous Article in Journal
Assessment of Summer Overheating in Concrete Block and Cross Laminated Timber Office Buildings in the Severe Cold and Cold Regions of China
Previous Article in Special Issue
A Case Study of a Negotiated Tender within a Small-to-Medium Construction Contractor: Modelling Project Cost Variance
 
 
Article

Article Versions Notes

Buildings 2021, 11(8), 331; https://doi.org/10.3390/buildings11080331
Action Date Notes Link
article xml file uploaded 30 July 2021 08:57 CEST Original file -
article xml uploaded. 30 July 2021 08:57 CEST Update -
article pdf uploaded. 30 July 2021 08:57 CEST Version of Record https://www.mdpi.com/2075-5309/11/8/331/pdf-vor
article html file updated 30 July 2021 08:58 CEST Original file -
article xml file uploaded 3 August 2021 04:33 CEST Update -
article xml uploaded. 3 August 2021 04:33 CEST Update https://www.mdpi.com/2075-5309/11/8/331/xml
article pdf uploaded. 3 August 2021 04:33 CEST Updated version of record https://www.mdpi.com/2075-5309/11/8/331/pdf
article html file updated 3 August 2021 04:34 CEST Update -
article html file updated 27 July 2022 07:20 CEST Update https://www.mdpi.com/2075-5309/11/8/331/html
Back to TopTop