3.2. Assumptions and Indices
This paper abstracts and simplifies certain mathematical problems, among which the specific assumptions are as follows:
Assumption 1. Cross-level operation is not allowed in the CLSC network presented in this paper. In addition, the potential locations of facilities in the CLSC are predetermined for the CLSC to function properly;
Assumption 2. Recycled products that go through the remanufacturing and reprocessing process can be used to meet the requirements of new products at varying levels. The quality of the new products made through this process is similar to that of the products made from raw materials;
Assumption 3. This paper solely considers CO2 emissions as the environmental assessment criterion. The unit CO2 emissions from manufacturing new products along with remanufactured and reprocessed recycled products are equivalent in the flexible capacity model and the fixed capacity model;
Assumption 4. To simplify modeling and calculations, this paper assumes that no products or materials are lost during processing and handling at any stage of the CLSC;
Assumption 5. To enhance the model’s applicability, this paper assumes that recycled products found unusable after testing at the inspection center, are non-recoverable at the three stages of remanufacturing, reprocessing, and energy recovery, and can only be disposed of at landfills;
The sets, parameters, and decision variables are defined as follows.
(1) Set and indicator set:
- T: the set of CLSC network operation time period t;
- P: the set of product categories p;
- M: the set of potential new product manufacturers m;
- D: the set of distributors d;
- C: the set of existing customer locations c;
- O: the set of existing recycled product collection centers o;
- I: the set of potential recycled product inspection centers i;
- R: the set of potential recycled product remanufacturing facilities r;
- U: the set of potential recycled product recycling facilities u;
- E: the set of potential recycled product energy recovery facilities e;
- F: the set of existing non-recyclable product landfill sites f;
- L: the set of flexible capacity levels for manufacturers m, inspection centers i, remanufacturing facilities r, recycling facilities u, and energy recovery facilities e.
(2) Parameters and related variables:
- : quality level of product p, with 1 being low quality, 2 being medium quality, and 3 being high quality;
- : Government subsidies for remanufacturing r, reprocessing u, and energy recovery e segments of the product p over the period t;
- : the proportion of recycled products reperiodd by collection centers for p products in period t as a percentage of products sold by distributors to customers;
- : the proportion of product p that applies to remanufacturing r, reprocessing u, and energy recovery e;
- : the proportion of product p that can be used for remanufacturing, reprocessing, and energy recovery if the product is of good quality;
- : the proportion of product p that is not available for remanufacturing, reprocessing, and energy recovery if the product is of good quality;
- : the minimum percentage of products that can be used for recycling as required by the government for CLSC construction;
- : the proportion of product p that is available for manufacturing new products after the remanufacturing step in period t;
- : the proportion of product p in period t that can be used to make new products after a reprocessing step;
- : the demand for product p at customer point c in period t;
- : the fixed costs of building manufacturers m, inspection centers i, remanufacturing facilities r, recycling facilities u, and energy recovery facilities e;
- : capacity level l fixed cost of construction of manufacturers m, inspection centers i, remanufacturing facility r, recycling facility u, energy recovery facility e;
- : variable costs of operating manufacturers m, inspection centers i, the remanufacturing facility r, the recycling facility u, and the energy recovery facility e over the period t;
- : variable costs of operating manufacturers m, inspection centers i, remanufacturing facility r, recycling facility u, and energy recovery facility e at capacity level l over period t;
- : manufacturing cost per unit of product p in period t;
- : raw material cost per unit of product p;
- : the cost of remanufacturing r, reprocessing u, and energy recovery e per unit of product p in period t;
- : the landfill cost per unit of product p in period t;
- : transportation cost per unit of product p transported per unit of distance in period t;
- : cost of capacity level change for manufacturer m, inspection center i, remanufacturing facility r, recycling facility u, energy recovery facility e;
- : capacity caps for manufacturers m, inspection center i, remanufacturing facility r, recycling facility u, energy recovery facility e;
- : capacity caps for manufacturers m, inspection center i, remanufacturing facility r, recycling facility u, and energy recovery facility e for l capacity level;
- : carbon emissions generated in the manufacturing m, inspecting i, remanufacturing r, reprocessing u, energy recovery e, and landfill f segments for each unit of product p in period t;
- : carbon emissions generated per unit of product p transported per unit of distance in period t;
- : unit distance between facilities at all levels in the CLSC.
(3) Decision variables:
- : a 0–1 variable that takes the value of 1 when the decision maker decides to build and use a manufacturer m, an inspection center i, a remanufacturing facility r, a recycling facility u, and an energy recovery facility e; otherwise, it takes the value of 0;
- : a 0–1 variable that takes the value of 1 when the decision maker decides to build a manufacturer m, an inspection center i, a remanufacturing facility r, a recycling facility u, and an energy recovery facility e with a capacity level of l; otherwise, it takes the value 0;
- : a 0–1 variable that takes the value of 1 when the decision maker decides to operate a manufacturer m, an inspection center i, a remanufacturing facility r, a recycling facility u, and an energy recovery facility e in period t; otherwise, it takes the value 0;
- : a 0–1 variable that takes the value of 1 when the decision maker decides to operate the manufacturers m, the inspection center i, the remanufacturing facility r, the recycling facility u, and the energy recovery facility e with a capacity level of l in period t; otherwise, it takes the value 0;
- : a 0–1 variable that takes the value of 1 when the manufacturers m, the inspection facility i, the remanufacturing facility r, the recycling facility u, and the energy recovery facility e change their capacity level during period t; otherwise, it takes the value 0;
- : continuous variable, the number of CLSC facilities manufacturing m, inspecting i, remanufacturing r, reprocessing u, energy recovery e, and landfill f products p in period t;
- : continuous variable, the quantity of raw materials purchased by manufacturers m for use in the production of product p in period t;
- : a continuous variable that follows a CLSC process in period t from the manufacturers to the distributor, the distributor to the point of customer, the point of the customer to the collection center, the collection center to the inspection center, the inspection center to the (remanufacturing facility, recycling facility, energy recovery facility, landfill), (remanufacturing Facility, recycling facility) to manufacturers in terms of the quantity of product p transported.