Legal Disputes under Time Charter in Connection with the Stranding of the MV Ever Given

,
,
and
1
Department of Logistics, College of Engineering, Korea Maritime and Ocean University, Busan 49112, Korea
2
Korea Institute of Maritime and Fisheries Technology, Busan 48562, Korea
3
Division of Navigation Convergence Studies, College of Maritime Sciences, Korea Maritime and Ocean University, Busan 49112, Korea
*
Author to whom correspondence should be addressed.

Abstract

The MV Ever Given’s stranding in the Suez Canal in March 2021 prompted renewed awareness of the heightened risk of marine accidents in narrow channels as global shipping companies continuously expand vessel sizes. However, there has been limited consideration of ways to improve accident response, and little analysis of future-oriented liabilities and damage compensation schemes for similar maritime accidents. First, key issues related to the Suez Canal stranding accident were analyzed based on web crawling using the R studio program (Version: R-4.0.5) to extract text data from unstructured format text (HTML tags). We designed the research questions to address the key issues/disputes, such as definitions of legal terms related to the Ever Given’s stranding accident and the declaration of a general average (G/A), liability for maintaining seaworthiness, source of command authority over the captain, and liability for compensation for delay in delivery. Then, the liability of stakeholders was legally interpreted through causal inductive reasoning based on relevant legal theories and precedents. To help secure safe and sustainable shipping routes, this study demystifies the problems resulting from the side effects of the trend of ultra-large vessels based on technology bias, and will contribute to responses to similar accidents in the future.

1. Introduction

1.1. Research Background

The opening of the Suez Canal in 1869 greatly facilitated global commerce by providing a direct route for ships to move between Asia and Europe. The New Suez Canal is an artificial waterway in Egypt, opened in 2015 to provide a second shipping route along part of the Suez Canal. The New Suez Canal is expected to expand international trade along the fastest shipping route between Europe and Asia and save sailing hours in both directions. Although the Suez Canal has a competitive relationship with the Transpolar Sea Route, the Trans-Siberia Railroad, and the Cape of Good Hope in terms of shipping through Eurasia, it is still preferred over those routes due to advantages such as time reduction, shipping efficiency, and profit. Due to these strengths, the Suez Canal has solidified its role as a key channel for Asian and European trade, with an average of approximately 51.5 vessels a day (approximately 18,800 per year) as of 2019, and as a global logistics hub, with about 12% of world trade moving through it [1]. Despite its high importance, however, the Suez Canal has responded to various maritime risks with complementary post-measures rather than precautionary responses. Representative accident cases in which the Suez Canal has been temporarily closed due to maritime risk include the following. First, the Six-Day War between Israel and some Arab states, in 1967, limited vessel traffic for eight years due to mines and sunken vessels [2]. Second, in 2004, the tanker Tropic Brilliance ran aground, limiting normal vessel traffic in the Suez Canal for three days [3]. Third, in February 2016, the bulk carrier New Katerina ran aground for 12 days, again limiting vessel traffic in the canal [4]. Fourth, in 2017, the 21,000 TEU (twenty-foot equivalent unit)-class OOCL Japan was stranded due to engine failure, once more limiting ship traffic in the Suez [5]. The most representative bottleneck straits in the world are the Panama Canal, connecting the Pacific Ocean and Atlantic Ocean; the Gibraltar Strait, connecting the Mediterranean Sea and Atlantic Ocean; the Malacca Strait, connecting the Pacific Ocean and Indian Ocean, and the Suez, connecting the Indian Ocean and Mediterranean Sea. However, canal management departments, including the Suez Canal Authority (SCA), have been underprepared for the expanding size, increasing speed, and increasingly minimal crews of vessels, and SCA emergency response facilities and staffing have not grown in proportion.
In 1956, the 58 TEU-class Ideal-X, a modified tanker, appeared as the world’s first dedicated container ship, and the sizes of container ships have continued to expand ever since. In 2018, HMM, a Korean national maritime container company, ordered twelve 24,000 TEU-class container ships with a twin-island design, which are the largest container ships in history [6]. In the liner service sector, the operating vessel size in global shipping companies has expanded for complex reasons, including the rapid development of shipbuilding technology, the maximization of economies of scale by reducing operating and labor costs per unit, the reducing of greenhouse gas emissions, growing shipping alliances, and joint services [7]. However, on March 23, 2021, the Ever Given’s stranding in the Suez Canal caused an accidental bottleneck, prompting global shipping and logistics companies to pay renewed attention to the issue of globalization bottlenecks caused by Suez Canal blockage, and the side effects of the trend of ultra-large vessels [8,9]. After the accident, due to the considerations of sustainable business, some shipping and logistics portfolios are expected to be redistributed to other routes, such as those mentioned above. However, the most important key factor in each case will still be the safety and efficiency of the vessel.
In short, the expansion of vessel sizes centered on container ships has not been properly addressed in the field because of cost concerns, although experts have pointed out an increase in marine perils, such as unexpected ship collisions and strandings [10,11,12,13]. The Ever Given’s stranding accident, unlike previous accidents, was a case in which a large vessel completely blocked the narrow canal in a two-way manner. As a result, complicated legal issues have arisen among stakeholders, such as shipowners, charterers, ship management companies, shippers, and the SCA [10,11], and these are likely to arise again in future cases [14].
Thus, given the importance of keeping major shipping routes safe and sustainable [15,16], the 2021 Ever Given stranding accident in the Suez Canal is “a wake-up call” for the shipping and logistics industries, and provides researchers with a key case for the testing of theoretical solutions to the problematic side effects of the trend towards ultra-large vessels [8,9] in the global supply chain of shipping and logistics, such as increasing the cost of detouring, the expansion of delay damage, and liability for damages.

1.2. Outline of Accident

The Ever Given, a 20,124 TEU super-large container ship with a length of 399.94 m and a beam of 58.8 m, departed from the Port of Tanjung Pelepas in Malaysia on 13 March 2021, and began its voyage to the Port of Rotterdam in the Netherlands on 31 March. However, on 23 March 2021, the Suez Canal accident [17] occurred in a west-bound convoy from Asia to Europe, as shown in Figure 1; the stranding has been blamed on narrow channels, vessel size, strong winds, poor operation, and rule violations.
Figure 1. Outline of Ever Given’s stranding accident in Suez Canal. Source: Created by authors.
Soon after the accident, the positions of stakeholders were clearly different, and to some extent, adversarial. The SCA pointed to technical problems with the ship as a root cause, stating that it would claim about USD 1 billion in compensation for lost transit fees during the accident period, canal damage, dredging, salvage operations, and loss of reputation [18,19]. Meanwhile, the Taiwanese shipping company Evergreen, which is responsible for the operation of the Ever Given, claimed that it was not responsible for the delay in delivery, and that Shoei Kisen Kaisha (SKK), the shipowner, had liability for compensation for various financial damages [20]. After that, the scientific investigation and causal confirmation, conducted using a Voyage Data Recorder (VDR), an Auto Identification System (AIS), track analysis and interviews with officials, found multiple causes for the unprecedented accident. According to the investigation, strong winds threw the ship off course, and then a series of commands from pilots made the situation worse, leading the vessel to slam into both banks of the canal. Moreover, the SCA violated the Rule of Navigation Section II, Art. No. 11 (pilotage) about deploying tugboats next to any vessel of the Ever Given’s size while navigating in the Canal to prevent direct collision with the canal’s embankment. Nevertheless, as of September 2021, when we are writing this paper, individual stakeholders are still trying to escape responsibility for the accident, or to reduce the scale of compensation [21]. Therefore, we review the core problems of the accident and determine the direction of this study by examining the progress of the responsibility issues that have arisen between individual stakeholders in a time series after the Ever Given’s stranding accident.
According to the situation report for the Ever Given, the progress of the stranding accident and refloating work based on local time was as follows [22]: On 23 March 2021, at about 8:00 local time, the Ever Given was stranded in the Suez Canal. On 25 March, the shipowner, SKK, designated SMIT Salvage (Netherlands) and Nippon Salvage (Japan) as salvage companies, and began salvage work on the Ever Given. On 26 March, the salvage companies developed a detailed plan for removing sand and mud around the Ever Given’s bulbous bow and re-floating the ship at high tide. As of 28 March, the salvage companies were working with the SCA to remove more than 20,000 tons of sand and mud, and decided to deploy additional salvage tugboats from the sandbank. At around 15:04 local time on 29 March, the rescue company succeeded in refloating the Ever Given, which was towed to the Great Bitter Lake for inspection of its seaworthiness. The vessel was officially impounded by Egyptian courts from 13 April. On 4 July, an undisclosed settlement was agreed upon between SKK and SCA. Finally, on 7 July, after about 3 months (106 days) of seizure, the Egyptian court released the vessel, and it resumed its journey to the Port of Rotterdam.

1.3. Aims

The previous findings on the key issues discussed in this study are all based on the liabilities between shipowners and time charterers, both of whom are party to the time charter. In practice, time charters have been made between shipowners and time charterers in accordance with international shipping practices, such as “Baltime 1939,” “Revised 1974,” “New York Produce Exchange (NYPE) 1981,” and “Shelltime Form 4” [23]. The time charter is essentially initiated by the shipowner, providing the vessel and a crew of seafarers, but ultimately, the time charterer leads the operation of the vessel, so there is a clear cost-sharing aspect to accidents such as the Ever Given episode [24,25].
Therefore, this study selects the Ever Given’s stranding accident as a representative case for interpreting liability under the time charter with expansion of vessel size, and seeks to determine the logic of subsequent liabilities based on the associated legal principles and precedents. Considering the potential liability issues, based on various official opinions raised by SCA officials, time charterers, shipowners, and global insurers, this study selects as the main subjects the Japanese shipowners, SKK, who are directly responsible for managing hulls and engines; German ship management company Bernhard Schulte Shipmanagement (BSM), who substantially managed the Ever Given; the Egyptian SCA, engaged in direct management of the Suez Canal; and the Taiwanese time charterers, Evergreen, who held freight transportation responsibility. It then seeks to review liability on this basis. Through this approach, this study looks again at the side effects of the trend towards ultra-large vessels from the perspective of ensuring sustainable development, providing a basis for the consideration of various future issues by scholars and practitioners, and will contribute to the prevention of similar accidents and the promotion of rapid compensation for damages.
To this end, the relevant legal issues shall be analyzed in Section 3 and Section 4, in order to help the maritime industry by presenting legal theory-based information and drawing a reasonable interpretation in terms of future-oriented problem solving. It should be noted that this study only discusses problems related to the time charter within the contract period, since the legal disputes between the parties are not completely closed.

1.4. Key Issue and Research Questions

Beginning 23 March 2021, the Suez Canal was closed for approximately seven days in both directions, raising international oil prices and diverting some waiting vessels to the Cape of Good Hope [26]. As a result, global shippers suffered direct and indirect damage due to the disconnection in the maritime logistics supply value chain and the delay in delivery. The Ever Given’s stranding accident is a case showing the side effects of the trend toward ultra-large vessels, providing important insights to shipbuilding companies, which have been interested in developing ship technology and infrastructure exclusively [27]. From this point on, these actors must not only focus on ships, as they have done so far, but are also required to pay attention to improving the infrastructure of related facilities (such as ports, canals, and aqueducts) in the global maritime logistics supply value chain, and to establishing a legal basis for all stakeholders to agree upon. In other words, only efforts and investments in technology development, safety management, emergency response, and the establishment of a legal system across the global maritime logistics supply chain, undertaken all together, will enable the smooth response to unexpected major accidents, and enable rapid compensation for damages.
As fundamental research, this study aims to focus on legal disputes from a problem-solving perspective. From 23 March to 23 April 2021, a total of 115 documents related to the Ever Given’s stranding accident were extracted through web crawling and text mining, and major keywords were analyzed, as shown in Figure 2.
Figure 2. Keywords from the term frequency analysis. Source: Created by authors with R (Version: R-4.0.5).
Finally, based on the major keywords, we interpret the legal disputes surrounding the accident. To this end, we also considered reviewing the detailed official agreement or judgment. However, this has still not been disclosed, by agreement between the Egyptian court and the stakeholders. Accordingly, we derive the legal disputes by utilizing the keywords derived from the third-party perspectives of the global media, the fragments of information from the Egyptian court’s verdict, and the authors’ own insights, as shown in Figure 3.
Figure 3. Flow chart presenting legal disputes. Source: Created by authors.
The first dispute involves determining the correct legal definitions of terms, which are mainly divided into two parts: first are terms related to the Ever Given’s stranding, such as “Ever Given”, “blockage (block)”, “Suez Canal (waterway)”, “aground (stuck)”, “Shoei Kisen”, and “operating”; and second is the general average (G/A) declared by SKK regarding the enormous cost of refloating the stranded Ever Given, examining keywords such as “Ever Given”, “company (firm)”, “aground (stuck)”, “tug boat”, “Shoei Kisen”, and “refloat”. The second dispute relates to keywords such as “ship (vessel)”, “Ever Given”, “company (firm)”, “authority”, and “operating”, and whether due diligence had been maintained with regard to the Ever Given’s seaworthiness. The third dispute relates to keywords such as “Suez Canal (waterway)”, “company (firm)”, “authority”, “route (navigate)”, and “operating”, and involves the issue of command (navigation) authority with regard to the vessel during the passage of the Suez Canal. The fourth dispute relates to keywords such as “Suez Canal (waterway)”, “container”, “blockage (block)”, “day”, “Egypt (Egyptian)”, “wait (delay)”, “trade”, “Shoei Kisen”, and “time”, and involves the issue of delays in the delivery of cargo and the liability for compensation that followed the suspension of traffic through the canal.
Following these four disputes, the research questions are as follows.
  • Question 1. What is the legal dispute on the correct legal definition of terms related to Ever Given‘s stranding and the declaration of G/A?
  • Question 2. What is the legal dispute on whether due diligence for Ever Given’s seaworthiness has been maintained?
  • Question 3. What is the legal dispute on the status of command (navigation) authority over the captain under the time charter while passing the Suez Canal?
  • Question 4. What is the legal dispute on the liability for compensation for delay in delivery due to the suspension of Suez Canal operations?

1.5. Literature Review

Several previous studies have provided insights into legal issues related to the benefits and disadvantages of ultra-large vessels, the legal meaning of good faith and seaworthiness under marine insurance, liability for the shipowner’s commanding authority under contract of pilot services during the passage of the Suez Canal, and delay of cargo delivery. Here we review these studies and connect them to the present case.
On the (economic and environmental) benefits and disadvantages of ultra-large vessels, Notteboom and Rodrigue [7] found that larger vessels produced considerable reductions in cost per TEU of capacity provided; however, further scale advantages at sea incurred diseconomies of scale at seaports. They argued that growing vessel size has led to a massification of unit cargo at sea, which in turn requires seaports to implement an atomization process. Panayides and Wiedmer [28] provided an effective understanding of collaboration among service providers, starting from the business structure of liner services. Tran and Haasis [11] concentrated on capacity expansion and the growth of ship size, and demonstrated that investing in new capacity will lead to higher total revenue of operators but lower unit revenue. Moreover, they pointed out that, for large container ships to directly take advantage of scale economies, in addition to shipping cost, other factors, such as port cost, inventory cost, transshipment cost, and inland transportation cost, should be taken into consideration. Malchow [29] reviewed those further effects of lower slot costs and lessons learned: consistently, an increase in ship size was found not to significantly reduce transport costs. Nevertheless, all necessary efforts to prepare ports for ships of increasing size are growing proportionally with every additional meter of draught and beam. Ha and Seo [30] showed that freight rate had a significant positive impact and bunker fuel price a significant negative effect on total profits. Pedersen and Zhang [10] provided simple expressions involving the structural dimensions and building material of ships, showing that the density distribution for collision and grounding damage normalized by the main dimensions of the ship depends on the size of the ship—a larger ship has a higher probability of greater relative grounding damage length than a smaller ship. Shin et al. [31] explored why most container shipping companies in Europe with positive earnings purchase large vessels instead of chartering vessels, while some ocean carriers with poor financial performance (negative earnings), such as the Hanjin Shipping Company, instead charter larger ships, with higher charter rates and longer durations.
The second review, of the legal meaning of good faith and seaworthiness under marine insurance, proceeded as follows. Kay [32] focused on the duty of good faith, imposed by Section 17 of the English Marine Insurance Act 1906, which states that “A contract of marine insurance is a contract of the utmost good faith, and, if the utmost good faith is not observed by either party, the contract may be avoided by the other party.” Park et al. [33] aimed to analyze the Institute Act 1/7/76 as well as to suggest a reasonable level of additional premium for breach of warranties through not only a comparative analysis between the Institute Warranties clauses and those of the corresponding Institute Warranties used by Japanese Fire and Marine Insurance companies, but also considering the current circumstances of changes in climatic conditions, vessel design, navigation and communication requirements, and capabilities from the perspective of guarantees of seaworthiness. Kampantais [34] aimed to examine whether the current seaworthiness legal framework can encompass autonomous unmanned ships. Kim and Cheong [23] analyzed South Korea’s historical position on cases involving the extent of the shipowner’s liability and willful misconduct or other reckless acts or omissions committed.
The third review, of the legal status of shipowners commanding authority under the contract of the pilot service, was as follows. Yoshimoto [35] examined the concept of a time charter, and we must consider what types of use of the vessel fall within this category. In this respect, early American court decisions recognize that under the more familiar time charter, the charterer does not contract for the vessel per se, but rather contracts for the service of the vessel rendered by the owner through the owner’s master and crew. Adăscăliţei [36] focused on the whether the owner of the vessel operates a liner service, or a charter undertakes that his vessel, while performing its obligations under the contract of carriage, will not deviate from the contract of carriage. Kunnaala et al. [37] reviewed usage as a guideline for developing a pilotage process model and indicators for measuring the effectiveness and quality of the pilotage process. Lee and Kim [38] included wide comparisons of other special provisions with the existing time-charter by basing it on “Supply Time 2005”, which is the worldwide standard form of time charter in the offshore support vessel market, and its investigation, aiming to provide practical guidance and procedures for the implementation of arbitration and applicable law issues in legal disputes between parties. Rialland et al. [39] demonstrated how a standard set of key performance indicator definitions and corresponding benchmark values can greatly simplify the design of a performance-based contract scheme by providing well-defined references for both shipowners and ship managers. Kim [40] announced that many countries insert default rules into maritime law to apply it to a case wherein there is no agreement; this serves to enhance legal stability. China, Japan, and Germany are among such countries.
The fourth review, of the legal status of delay for cargo delivery, was as follows. Nunes [25] demonstrated that while charterers may escape the risks associated with operating a shipping company, a prudent charterer should still be concerned about potential liabilities to third parties, the ship’s crew, and the environment in connection with the transportation of its product, particularly if that cargo has been classified as a “dangerous cargo” by local or international law. Von Ziegler [41] reviewed the liability of the carrier for loss, damage, or delay based on Article 17 (Basis of liability) of the Rotterdam Rules. The carrier is liable for loss and damage to goods, as well as for delay in delivery, if the claimant proves that the loss, damage or delay, or the event or circumstance that caused or contributed to it, took place during the period of the carrier’s responsibility. Von Ziegler [42] demonstrated why the prevailing international rules for the law of carriage of goods by sea have not included harmonized rules on possible liability for delay, and for the most part have left the issue to national law, which in turn to a great extent has left the issue of liability for delay in maritime transport to the parties to contract freely on a time element and on how the contract is to function in the event of any delay. Sturley et al. [43] discussed that the intrinsic merits of a new carriage convention can be disagreed on. They recalled the many discussions and conferences from the late 1970s about whether to adopt the Hamburg Rules and the particularly forceful views of some in the shipping and insurance industries who warned against changing the existing system. Plomaritou [44] discussed the distribution of the liabilities and expenses between the shipowner and charterer in the most representative types of charter regarding the aspects of the vessel, the seaworthiness, the avoidance of unjustifiable deviations, the ship’s arrival at the port, the loading/discharging operations, the delivery of cargo, and so on. Aladwani [45] discussed the impact of multimodal carriage on the obligation of, and liability related to, seaworthiness, and proposed that a multimodal approach should not be used with some types of sea carriage, such as container carriages. Throughout the thesis, proposals for both regimes concerning changes to areas where the risk between contracting parties is imbalanced are provided.

2. Research Design and Method

2.1. Theory

This study offers legal theory-based information to address the research questions, derived from key issues such as the theory of charter contracts based on the principles of maritime-related trust, focusing on the Ever Given’s stranding accident in the Suez Canal. To that end, the first step must be the establishing of facts based on the outcome of the final stakeholder settlement or legal action. Descriptive theory is concerned with characterizing and explaining law, and is standardly distinguished from normative theory, which seeks to provide an account of the supporting framework that aims to improve on descriptive theory. In order to minimize gaps in maritime, ship, and cargo management technologies that reflect the latest ship operation and management technologies and environments, applying the existing legal theory during the argument process, we will apply an inductive method of study based on related precedents and clauses. Through this approach, a legal interpretation for solving major disputes in a future-oriented manner will be possible.
The analysis utilized the R program (version: R-4.0.5) and found that word roots such as “ship”, “canal”, “said”, “suez”, “vessel,” “container”, “ever given”, “day”, “company”, and “author” were frequently used, as shown below in Figure 4.
Figure 4. Word cloud analysis related to Ever Given accident. Source: Created by author with the R studio program (Version: R–4.0.5).
Then, the top 30 keywords were derived by rearranging words that can be synthesized, such as “ever” and “given”, and those that have very similar meanings, such as “ship” and “vessel”. As a result, the most repeated words about accidents were “ship (vessel)” (1044 times) 1000 times for “suez canal (waterway)”, and 420 times for “ever given”. Specifically, these included keywords on recovery from accidents by refloating stranded vessels (including 134 usages of “aground (stuck)”, 106 of “tugboats”, and 72 of “refloats”), keywords on the suspension of the canal’s operations (151 usages of “blockage”, 138 of “day”, 131 of “wait”, 98 of “navigate”, and 69 of “traffic”), keywords related to the major subject of the accident (183 usages of “company (firm)” and 84 of “shoei kisen”), and keywords related to authority and responsibility in the accident (including 133 usages of “authority” and 83 of “operating”).

2.2. Outline of Research

Using the R program, this study analyzed 115 documents related to the Ever Given accident collected through web crawling from 23 March to 23April 2021. We analyzed the frequency of the resulting keywords to draw out the key issues and design research questions based on them. Then, through causal inductive reasoning, we interpreted the liability based on legal theory and precedence regarding the legal status and responsibility between the aforementioned individual subjects. We grouped through a relationship diagram the legal disputes on the time charter relationship between the time charterer (Evergreen in Taiwan) and the shipowner (SKK in Japan), and the ship management consignment agreement relationship between the shipowner and the ship management company (BSM). Through this, agents such as internal and external shipping companies, insurers, insurance brokers, register of shipping, and ship management companies will be able to understand the side effects of the trend in ultra-large vessels in terms of peril management, develop improvement plans to reduce damage in the event of similar cases in the future, and maintain sustainability in the shipping and logistics industry.

5. Discussion

The Ever Given has now been released, and north-/southbound traffic in the Suez Canal has resumed, having returned to normal on July 7, 2021. Depending on the final cause of the stranding accident, the liabilities of individuals will arise, and the owner, operator, and/or charterer of the vessel will be required to prepare for a number of claims. As shown in Table 1, the captain, shipowner, time charterer, and insurer will potentially be liable.
Table 1. The main body for potential liabilities regarding the stranding accident.
According to the report Chokepoints: Maritime Economic Concerns in Southeast Asia (1999) [93], joint research by the NDU (National Defense University) and CNA (Center for Naval Analysis), global shipping companies are passive in investing in additional costs in safety management, given that they practically favor detours though the Sunda Strait and Makassar Strait, even if costs are added, rather than dredging investments to secure safety in the Malacca Strait. To date, the global maritime industry has been concerned only with the technology-based expansion of vessel size and cost reduction in shipping and logistics, and lacks awareness of the importance of the mainstay of the global economy associated with supply chain management: safety, emergency response, and a swift damage compensation system [94].
Eventually, from a strategic perspective regarding securing safe and sustainable shipping routes, time charterers, shipowners, ship management companies and insurers should deliberate over how the expansion of vessel size has ripple effects in the future, and maintain continuous mutual cooperation to ensure a balance between the speed of technology development and ports, shipping routes, safety management, crew management, and legal compensation system reviews [29]. Furthermore, in the wake of the Ever Given’s stranding accident, practitioners need to constantly revise and supplement the major legal questions mentioned in Chapter 4 in order to establish a cooperative system that can support the relief and return of victims through quick compensation in the event of damage.

6. Conclusions

As noted in the Ever Given case, maritime experts have consistently pointed out the need for facility investment and regular dredging for the safety of vessel navigation, such as securing the width and depth of the Suez Canal. However, stranding and grounding accidents have occurred continuously in the past. Therefore, this study reviewed the legal status of major subjects under the time charter for an agile response and for establishing a damage compensation system in narrow channels such as the Suez Canal, given the increasing accident likelihood due to the expansion of vessel size, increased vessel speed, and enhanced joint service in the liner service shipping sector. As a result, we draw the groundwork for future legal proceedings and negotiation processes through the legal interpretation of the precedents, legal theories, and clauses of international agreements regarding the following issues: the definition of key legal terms related to the stranding accident and the declaration of the G/A, the obligation to maintain a ship’s seaworthiness, the subject of the right-to-command in relation to the captain (under a time charter), and the liability for compensation for delays in delivery.
Through analyzing the aforementioned legal issues, we draw some conclusions related to solving liability problems concerning the stranding accident, as follows:
  • First, the Ever Given’s stranding accident corresponds with a grounding, not a collision, which generally refers to direct or indirect contact between two or more vessels due to an act or omission of an act regarding their operation. Therefore, the Ever Given’s hull insurer must cover costs, as is the case in accidents and damages related to stranding accidents, and not based on the coverage in the collision clause;
  • Second, although SKK, the owner of the Ever Given, can declare a G/A for the amount paid to salvage the vessel after its stranding, in accordance with the law of G/A, it still remains a matter of legal dispute to determine which damages could be included. In the Ever Given’s case, the vessel and its cargo are insured under a hull insurance policy and cargo insurance policy, respectively, so the G/A for the vessel and its cargo is covered by each insurer;
  • Third, if the time charterer Evergreen wants to claim immunity with regard to the cargo damage, the process of verifying that due diligence was exercised properly in ensuring the Ever Given’s seaworthiness and sharing the information with the shipowner and ship management company should be concluded in advance. When the process is successfully completed, Evergreen can assert the negligence in navigation and claim immunity for the cargo damage issue;
  • Fourth, when a time charter is viewed from the perspective of real rights, the shipowner has control with regard to the sphere of the crew members, including the captain and seafarers. However, with regard to the commercial field, the time charterer is thought to have control through its command and navigation authority, based on the legal theories of time charters. However, depending on the detailed clauses of the contract between Evergreen (the charterer) and SKK (the shipowner), there will be room for further dispute over such issues regarding the Ever Given’s stranding accident;
  • Finally, liability for compensation for cargo damage related to the Ever Given’s stranding accident will change depending on the court’s jurisdiction and the provisions stipulated in the B/L between Evergreen and the shippers. Meanwhile, in accordance with the applied maritime conventions, such as the Hague Rules, the Hague–Visby Rules, and the Hamburg Rules, a limitation of liability per package may be possible. Furthermore, if it is proven that the ocean carrier and time charterer, Evergreen, is not guilty of negligence in navigation related to the cause of the delays in delivery, Evergreen will be exempted from liability.
Of course, it may be meaningless to draw conclusions on how future legal disputes may change, due to the lack of information on the formal position of each stakeholder on the investigation into the cause of the Ever Given’s stranding accident. Moreover, after the Ever Given was released from seizure on 7 July 2021, the majority of problems related to the stranding accident seemed settled. However, this judgment on releasing the Ever Given is covered by a non-disclosure agreement, and is just the beginning of the legal disputes ahead between shipowner, shippers, insurers, alliance members, and so on. Therefore, this study has significance for drawing reasonable interpretations in terms of future-oriented problem solving, contributing to “a wake-up call” for the global shipping and logistics industry regarding the side effects of the trend towards ultra-large vessels in terms of sustainability.
Although the digitalization and platformization of the global shipping industry are expected to continue to develop in the future, the legal issues of maritime accidents based on human errors will continue to expand as ships become larger and faster, with fewer people on board. Therefore, it is necessary to maintain a good balance between speed of technological development, infrastructures, operations systems, legal systems, and, especially, research on preparing standardized legal and institutional solutions for disputes among various charter parties.
Despite this study’s meaningful discussions and conclusions, it has some limitations. As we do not have access to confidential information, we cannot secure the initial results of the accident investigation, the settlement between SKK and SCA, or the formal position of each stakeholder on the investigation into the cause of the stranding. Therefore, recognizing that detailed final judgment would take a long time, and regarding the variety of compensation issues among the stakeholders, it is highly recommended that future studies suggest what legal framework might be the most reasonable for responding to other similar accidents.

Author Contributions

Conceptualization J.C., Y.K. and C.L.; methodology J.C. and C.L.; software J.L.; validation J.C. and J.L.; investigation C.L.; resources J.C.; data curation J.C.; writing—original draft preparation J.C. and C.L.; writing—review and editing J.C.; visualization J.C.; supervision C.L.; project administration C.L.; funding acquisition Y.K. All authors have read and agreed to the published version of the manuscript.

Funding

This research was supported by the 4th Educational Training Program for the Shipping, Port, and Logistics of the Ministry of Oceans and Fisheries, South Korea.

Institutional Review Board Statement

Not applicable.

Data Availability Statement

Not applicable.

Conflicts of Interest

The authors declare no conflict of interest. The funder had no role in the design of the study; in the collection, analyses, or interpretation of data; in the writing of the manuscript, or in the decision to publish the results.

References

  1. Suez Canal Authority. Navigation Statistics. Available online: https://www.suezcanal.gov.eg/English/Navigation/Pages/NavigationStatistics.aspx (accessed on 24 April 2021).
  2. Shapira, A. The Six-Day War and the right of self-defence. Isr. Law Rev. 1971, 6, 65–80. [Google Scholar] [CrossRef] [Scilit]
  3. SCF Group. Incident with Tropic Brilliance. Available online: http://www.scf-group.com/en/press_office/press_releases/item1196.html (accessed on 15 May 2021).
  4. The Maritime Executive. Grounded Bulker Refloated in Suez Canal. Available online: https://www.maritime-executive.com/article/grounded-bulker-new-katerina-refloated-in-suez-canal (accessed on 15 May 2021).
  5. American Shipper. OOCL Mega-Vessel Runs Aground in Suez Canal. Available online: https://www.freightwaves.com/news/oocl-mega-vessel-runs-aground-in-suez-canal (accessed on 15 May 2021).
  6. Offshore Energy. HMM’s 24,000 TEU Boxship Fleet Is Complete. Available online: https://www.offshore-energy.biz/hmms-24000-teu-boxship-fleet-is-complete/ (accessed on 15 September 2020).
  7. Notteboom, T.; Rodrigue, J.P. The future of containerization: Perspectives from maritime and inland freight distribution. GeoJournal 2009, 74, 7–22. [Google Scholar] [CrossRef] [Scilit]
  8. Gomez Paz, M.; Camarero, A.; Gonzalez, N. Use of the Delphi method to determine the constraints that affect the future size of large container ships. Marit. Policy Manag. 2015, 42, 263–277. [Google Scholar] [CrossRef] [Scilit]
  9. Sánchez, R.J.; Perrotti, D.E.; Fort, A.G.P. Looking into the future ten years later: Big full containerships and their arrival to South American ports. J. Ship Trad. 2021, 6, 1–20. [Google Scholar]
  10. Pedersen, P.T.; Zhang, S. Effect of ship structure and size on grounding and collision damage distributions. Ocean Eng. 2000, 27, 1161–1179. [Google Scholar] [CrossRef] [Scilit]
  11. Tran, N.K.; Haasis, H.D. An empirical study of fleet expansion and growth of ship size in container liner shipping. Int. J. Prod. Econ. 2015, 159, 241–253. [Google Scholar] [CrossRef] [Scilit]
  12. Wall Street Journal. Bigger Container Ships Pose Bigger Risks. Available online: https://www.wsj.com/articles/bigger-container-ships-pose-bigger-risks-1423443013 (accessed on 15 May 2021).
  13. Elsherbiny, K.; Tezdogan, T.; Kotb, M.; Incecik, A.; Day, S. Experimental analysis of the squat of ships advancing through the New Suez Canal. Ocean Eng. 2019, 178, 331–344. [Google Scholar] [CrossRef] [Scilit]
  14. Insurance Journal. Lengthy Legal Battles Expected from Suez Canal’s Longest Closure in Almost 50 Years. Available online: https://www.insurancejournal.com/news/international/2021/03/30/607759.htm (accessed on 15 May 2021).
  15. Schøyen, H.; Bråthen, S. The Northern Sea Route versus the Suez Canal: Cases from bulk shipping. J. Transp. Geogr. 2011, 19, 977–983. [Google Scholar] [CrossRef] [Scilit]
  16. Lee, S.W.; Jo, J.; Kim, S. Leveraging the 4th Industrial Revolution technology for sustainable development of the Northern Sea Route (NSR)—The case study of autonomous vessel. Sustainability 2021, 13, 8211. [Google Scholar] [CrossRef] [Scilit]
  17. Evergreen Marine Corp. Situation Report for Ever Given. Available online: https://www.evergreen-marine.com/tuf1/jsp/TUF1_News.jsp?newsType=G2&newsId=NEWS2021032600007937&lang=en (accessed on 15 May 2021).
  18. UK P&I Club. “Ever Given” Re-Floated in Suez Canal. Available online: https://www.ukpandi.com/news-and-resources/press-release-articles/2021/ever-given-grounding-in-suez-canal/ (accessed on 15 May 2021).
  19. Evergreen Marine Corp. Statement for Ever Given Arrested by Egyptian Court. Available online: https://www.evergreen-marine.com/tuf1/jsp/TUF1_News.jsp?newsType=G2&newsId=NEWS2021041400008154&lang=en (accessed on 15 May 2021).
  20. Bloomberg. Evergreen, Charterer of Ever Given, Says It’s Not Responsible for Cargo Delays. Available online: https://www.bloomberg.com/news/articles/2021-04-01/charterer-says-it-s-not-responsible-for-ever-given-cargo-delays (accessed on 15 May 2021).
  21. The New York Times. How One of the World’s Biggest Ships Jammed the Suez Canal. Available online: https://www.nytimes.com/2021/07/17/world/middleeast/suez-canal-stuck-ship-ever-given.html (accessed on 31 August 2021).
  22. Evergreen Marine Corp. Notices and News. Available online: https://www.evergreen-marine.com/tbn1/jsp/TBN1_NewsListOverview.jsp (accessed on 15 May 2021).
  23. Kim, S.Y.; Cheong, Y.S. A study on conduct barring limitation of shipowner’s liability based on the Korean Commercial Code. Asian J. Ship Logist. 2016, 32, 229–233. [Google Scholar] [CrossRef] [Scilit]
  24. David, F. Indemnities in time charters. In Legal Issues Relating to Time Charterparties; Routledge: London, UK, 2020; pp. 93–113. [Google Scholar]
  25. Nunes, T. Charterer’s liabilities under the ship time charter. Houst. J. Int. Law 2003, 26, 561–577. [Google Scholar]
  26. Bloomberg. With Suez Canal Shut, a Dozen Ships Sail the Long Way Around. Available online: https://www.bloomberg.com/news/articles/2021-03-26/with-suez-still-shut-some-ships-taking-long-route-around-africa (accessed on 15 May 2021).
  27. Kim, J.H. Studies on supply and demand paradox in shipping market. J. Ind. Distrib. Bus. 2019, 10, 19–27. [Google Scholar] [CrossRef] [Scilit]
  28. Panayides, P.M.; Wiedmer, R. Strategic alliances in container liner shipping. Res. Transp. Econ. 2011, 32, 25–38. [Google Scholar] [CrossRef] [Scilit]
  29. Malchow, U. Growth in containership sizes to be stopped? Marit. Bus. Res. 2017, 2, 199–210. [Google Scholar] [CrossRef] [Scilit]
  30. Ha, Y.S.; Seo, J.S. An analysis of the competitiveness of major liner shipping companies. Asian J. Ship Logist. 2017, 33, 53–60. [Google Scholar] [CrossRef] [Scilit]
  31. Shin, S.H.; Lee, P.T.W.; Lee, S.W. Lessons from bankruptcy of Hanjin Shipping Company in chartering. Marit. Policy Manag. 2019, 46, 136–155. [Google Scholar] [CrossRef] [Scilit]
  32. Kay, R. Extent of the duty of good faith clarified—Or is it? Bus. Law Rev. 2001, 22, 57–59. [Google Scholar] [CrossRef]
  33. Park, S.K.; Kim, J.R.; Shin, Y.R. A study on the Institute Warranties in the institute time clauses—Hulls 1/10/83. J. Navig. Port Res. 2012, 36, 329–338. [Google Scholar] [CrossRef] [Scilit]
  34. Kampantais, N. Seaworthiness in Autonomous Unmanned Cargo Ships. Master’s Thesis, Erasmus University Rotterdam, Rotterdam, The Netherlands, June 2016. [Google Scholar]
  35. Yoshimoto, H. The time charter in Japan: A comparison. Transnatl. Law 1988, 1, 449. [Google Scholar]
  36. Adăscăliţei, O. An overview on the implied obligations in a contract of affreightment. Procedia Soc. Behav. Sci. 2013, 92, 7–15. [Google Scholar] [CrossRef] [Scilit]
  37. Kunnaala, V.; Lappalainen, J.; Tapaninen, U. Review of pilotage processes and indicators in pilotage organisations. WMU J. Marit. Aff. 2013, 12, 99–114. [Google Scholar] [CrossRef] [Scilit]
  38. Lee, C.H.; Kim, J.K. A study on time charter party for offshore service vessels 2005—Focusing the dispute resolution clause. J. Navig. Port Res. 2014, 38, 81–87. [Google Scholar] [CrossRef] [Scilit]
  39. Rialland, A.; Nesheim, D.A.; Norbeck, J.A.; Rødseth, Ø.J. Performance-based ship management contracts using the Shipping KPI standard. WMU J. Marit. Aff. 2014, 13, 191–206. [Google Scholar] [CrossRef] [Scilit]
  40. Kim, I.H. Internal legal relationship under the time charter party. J. Arbit. Stud. 2020, 30, 163–177. [Google Scholar]
  41. Von Ziegler, A. The liability of the contracting carrier. Tex. Int. Law J. 2008, 44, 329–348. [Google Scholar]
  42. Von Ziegler, A. Delay and the Rotterdam rules. Unif. Law Rev. 2009, 14, 997. [Google Scholar] [CrossRef] [Scilit]
  43. Sturley, M.F.; Fugita, T.; van der Ziel, G. The Rotterdam Rules: The UN Convention on Contracts for the International Carriage of Goods Wholly or Partly by Sea; Thomson Reuters: London, UK, 2010; pp. 10–95. [Google Scholar]
  44. Plomaritou, E. A review of shipowner’s & charterer’s obligations in various types of charter. J. Ship. Ocean Eng. 2014, 4, 307–321. [Google Scholar]
  45. Aladwani, T. A Comparative Study of the Obligation of Due Diligence to Provide a Seaworthy Vessel under the Hague/Hague-Visby Rules and the Rotterdam Rules; Giuffré: Milan, Italy, 2016; pp. 93–113. [Google Scholar]
  46. Zhang, H.; Zeng, Q. A study of the relationships between the time charter and spot freight rates. Appl. Econ. 2015, 47, 955–965. [Google Scholar] [CrossRef] [Scilit]
  47. Weale, J. Cargo Liabilities under the New York Produce Exchange Time Charter and the Inter-Club Agreement; Routledge: London, UK, 2017; pp. 103–136. [Google Scholar]
  48. Longarela-Ares, Á.; Calvo-Silvosa, A.; Pérez-López, J.B. The influence of economic barriers and drivers on energy efficiency investments in maritime shipping, from the perspective of the principal–agent problem. Sustainability 2020, 12, 7943. [Google Scholar] [CrossRef] [Scilit]
  49. Nwokedi, T.C.; Okonko, I.; Ndubuisi, L.; Ntor-Ue, E.M. Assessment of shippers’ and ship owners’ ship and charter type choice in the wet and dry bulk ship brokering market: Knowledge guide for African indigenous ship brokers. LOGI 2018, 9, 7082. [Google Scholar]
  50. Lloyd’s Law Reports. Available online: https://www.i-law.com/ilaw/doc/view.htm?id=150812 (accessed on 15 May 2021).
  51. Offshore Energy. Evergreen to Splash Up to $2.6 Billion on 20 Boxships. Available online: https://www.offshore-energy.biz/evergreen-to-splash-up-to-2-6-billion-on-20-boxships/ (accessed on 15 May 2021).
  52. The Mortor Ship. Imabari Eyes Growth amid Consolidation. Available online: https://www.motorship.com/news101/ships-and-shipyards/imabari-eyes-growth-amid-consolidation (accessed on 15 May 2021).
  53. West. Disponent Owners’ Contractual Risks in a Nutshell. Available online: https://www.westpandi.com/getattachment/13976904-2c71-401e-a81e-da8df568b7d8/defence-guide_disponent_owners_4pp_v2_lr.pdf (accessed on 15 May 2021).
  54. Alphaliner. Alphaliner Top 100. Available online: https://alphaliner.axsmarine.com/PublicTop100/ (accessed on 15 May 2021).
  55. Reynolds, F. Time charterparties and bills of lading. In Legal Issues Relating to Time Charterparties; Thomas, R., Ed.; Routledge: London, UK, 2008; pp. 161–175. [Google Scholar]
  56. Cariou, P.; Wolff, F.C. Ship-owners’ decisions to outsource vessel management. Transp. Rev. 2011, 31, 709–724. [Google Scholar] [CrossRef] [Scilit]
  57. Lloyd’s Law Reports. Available online: https://www.i-law.com/ilaw/doc/view.htm?id=148661 (accessed on 15 May 2021).
  58. BSM. Services. Available online: https://www.bs-shipmanagement.com/en/services (accessed on 15 May 2021).
  59. BSM. Crew Service Centre. Available online: https://www.bs-shipmanagement.com/en/crew-service-centres (accessed on 15 May 2021).
  60. MarineLink. BSM Releases LiveFleet Mobile App. Available online: https://www.marinelink.com/news/bsm-releases-livefleet-mobile-app-471254 (accessed on 15 May 2021).
  61. Lloyd’s Law Reports. Available online: https://www.i-law.com/ilaw/doc/view.htm?id=150841 (accessed on 15 May 2021).
  62. Baughen, S. Shipping Law, 3rd ed.; Routledge-Cavendish: London, UK, 2004. [Google Scholar]
  63. SCA. SCA Overview. Available online: https://www.suezcanal.gov.eg/English/About/SuezCanalAuthority/Pages/SCAOverview.aspx (accessed on 15 May 2021).
  64. Weintrit, A. Initial description of pilotage and tug services in the context of e-navigation. J. Mar. Sci. Eng. 2020, 8, 116. [Google Scholar] [CrossRef] [Scilit]
  65. Lim, J.K. An Analysis of the Need for a Pilot Civil Liability Restriction System in South Korea for Marine Safety. Master’s Thesis, World Maritime University, Malmö, Sweden, 2018. [Google Scholar]
  66. Washington Post. Suez Canal Pilots Come under Scrutiny after Grounding of Ship. Available online: https://www.washingtonpost.com/world/2021/03/29/suez-canal-pilots/ (accessed on 15 May 2021).
  67. Sian, A.Y.; Maimun, A.; Ahmed, Y. Simultaneous ship-to-ship interaction and bank effects on a vessel in restricted water. In Proceedings of the 4th MASHCON—International Conference on Ship Manoeuvring in Shallow and Confined Water with Special Focus on Ship Bottom Interaction, Elbcampus, Hamburg, Germany, 23–25 May 2016; pp. 197–207. [Google Scholar]
  68. Institute Time Clauses (Hulls) 1.10.83. Available online: https://www.mapfre.com.tr/insurance-en/images/institute-time-clauses_tcm1644-115566.pdf (accessed on 15 May 2021).
  69. Eastman, S.E. Liability of the ground control operator for negligence. J. Air Law Commer. 1950, 17, 1–15. [Google Scholar]
  70. Hasanspahić, N.; Vujičić, S.; Frančić, V.; Čampara, L. The role of the human factor in marine accidents. J. Mar. Sci. Eng. 2021, 9, 261. [Google Scholar] [CrossRef] [Scilit]
  71. Bimabazaar. The Difference between Grounding Stranding, Sinking and Capsizing of the Vessel. Available online: https://www.bimabazaar.com/the-difference-between-grounding-stranding-sinking-and-capsizing-of-the-vessel (accessed on 15 May 2021).
  72. Pearson, W.H.; Skalski, J.R.; Sobocinski, K.L.; Miller, M.C.; Johnson, G.E.; Williams, G.D.; Southard, J.A.; Buchanan, R.A. A Study of Stranding of Juvenile Salmon by Ship Wakes along the Lower Columbia River Using a Before-and-After Design: Before-Phase Results; Pacific Northwest National Lab: Richland, WA, USA, 2006.
  73. Hudson, N.G.; Harvey, M.D. The York-Antwerp Rules: The Principles and Practices of General Average Adjustment; Routledge: London, UK, 2017. [Google Scholar]
  74. Rose, F. General Average: Law and Practice; Taylor & Francis: London, UK, 2017. [Google Scholar]
  75. Marine Insurance Act 1906. Available online: https://www.legislation.gov.uk/ukpga/Edw7/6/41/part/12 (accessed on 15 May 2021).
  76. Varsami, A. Different methods of refloating a ship. In Advanced Materials Research; Trans Tech Publications: Zürich, Switzerland, 2014; Volume 837, pp. 792–797. [Google Scholar]
  77. Gilman, J.C.B.; Merkin, R.; Templeman, C.; Arnould, J. Arnould’s Law of Marine Insurance and Average, 17th ed.; Sweet & Maxwell: Mytholmroyd, UK, 2008. [Google Scholar]
  78. Roman, M.; Wasiak, M.; Roman, M.; Roman, K.; Niedziółka, A.; Krasnodębski, A.; Królak, S. Essence of the compensation plan in the process of motivation in multi-level marketing (MLM). A case study. Sustainability 2021, 13, 8738. [Google Scholar] [CrossRef] [Scilit]
  79. Kassem, A.H. The Legal Aspects of Seaworthiness: Current Law and Development. Ph.D. Thesis, Swansea University, Swansea, UK, 2006. [Google Scholar]
  80. Wilson, J.F. Carriage of Goods by Sea, 5th ed.; Pearson Education: London, UK, 2004. [Google Scholar]
  81. Alawneh, T. A Critical Analysis of the Implied Obligation Against Unjustified Deviation: Is the Rule Still Relevant to the Modern Law on Carriage of Goods by Sea? Ph.D. Thesis, University of Huddersfield, Huddersfield, UK, 2015. [Google Scholar]
  82. Ademun-Okeke. An examination of bareboat charter registries and flag of convenience registries in international law. Ocean Dev. Int. Law 2005, 36, 339–362. [Google Scholar] [CrossRef] [Scilit]
  83. Lloyd’s Law Reports. Available online: https://www.i-law.com/ilaw/doc/view.htm?id=150702 (accessed on 15 May 2021).
  84. Elaws. Available online: https://elaws.e-gov.go.jp/document?lawid=132AC0000000048 (accessed on 15 May 2021).
  85. Medbøen, C.A.B.; Holm, M.B.; Msakni, M.K.; Fagerholt, K.; Schütz, P. Combining optimization and simulation for designing a robust short-sea feeder network. Algorithms 2020, 13, 304. [Google Scholar] [CrossRef] [Scilit]
  86. UNCTAD. Review of Maritime Transport. Available online: https://unctad.org/system/files/official-document/rmt2020_en.pdf (accessed on 15 May 2021).
  87. Abioye, O.F.; Dulebenets, M.A.; Pasha, J.; Kavoosi, M. A vessel schedule recovery problem at the liner shipping route with emission control areas. Energies 2019, 12, 2380. [Google Scholar] [CrossRef] [Scilit]
  88. Colinvaux, R. Carver’s Carriage by Sea, 13th ed.; Steven’s Sons: London, UK, 1982. [Google Scholar]
  89. Hancock, C. Containerisation, Slot Charters, and the Law 1; Routledge: London, UK, 2020. [Google Scholar]
  90. Tetley, W. Marine Cargo Claims; Butterworths: Toronto, ON, Canada, 1987. [Google Scholar]
  91. Wilson, J.F. Basic carrier liability and right of limitation. In The Hamburg Rules on the Carriage of Goods by Sea; Mankabady, S., Ed.; A. W. Sijthoff: Leiden, The Netherlands; Boston, MA, USA, 1978; pp. 140–141. [Google Scholar]
  92. Abdulrahim, H.M. Maritime Carrier’s Liability for Loss of or Damage to Goods under the Hague Rules, Visby Rules and the Hamburg Rules, Compared with His Liability as an Operator under the Relevant Rules of the International Multimodal Transport Convention; University of Glasgow: Glasgow, UK, 1994; pp. 61–245. [Google Scholar]
  93. Noer, J.H.; Gregory, D. Chokepoints: Maritime Economic Concerns in Southeast Asia; Institute for National Strategic Studies, National Defense University: Washington, DC, USA, 1996. [Google Scholar]
  94. Pham, T.Y.; Kim, K.Y.; Yeo, G.T. The Panama Canal expansion and its impact on east–west liner shipping route selection. Sustainability 2018, 10, 4353. [Google Scholar] [CrossRef] [Scilit]
Publisher’s Note: MDPI stays neutral with regard to jurisdictional claims in published maps and institutional affiliations.

Article Metrics

Citations

Article Access Statistics

Multiple requests from the same IP address are counted as one view.