Dynamic Modeling for Life Cycle Cost Analysis of BIM-Based Construction Waste Management
Abstract
:1. Introduction
2. Literature Review
2.1. BIM in CWM
2.2. SD Approach in CWM
3. System Dynamic Model Development
3.1. Model and Variable Descriptions
3.2. Causal Loop Diagram
3.3. Stock-Flow Diagram
3.4. SD Model Pilot Test
4. Simulation Results
4.1. Running Baseline Scenario
4.2. Scenario A: Time Taken for Accepting the Risk of Investment
4.3. Scenario B: Percentage of Modular Building Elements
4.4. Scenario C: Landfill Charge
5. Case Study Validation
6. Discussion
7. Conclusions
Author Contributions
Funding
Conflicts of Interest
Appendix A
Parameters | Equations |
---|---|
EItIB | SMOOTH(1–Ratio of CBoBIM to the CBoC, TNSARI) |
Ratio of CBoBIM to the CBoC | 1 – CBoBIM/CBoC |
PoMBE | DELAY1( IF THEN ELSE(EItIB <= 0.2, IF THEN ELSE(EItIB <= 0.15, IF THEN ELSE( EItIB <= 0.1, 30, 50), 75), 95), 10) |
RWGFCSA | (1 – PoMBE/100) × wPL |
ANoDC | IF THEN ELSE("3BVS" <= 80, IF THEN ELSE( "3BVS" <= 65, IF THEN ELSE("3BVS" <= 50, 0.5 ×ANoC, 0.65 × ANoC), 0.8 × ANoC), ANoC) |
CBoBIM | (+Sorting Cost + RC + RyC + Deconstruction Cost + 0.05 × Cost of Landfilling + MC – Total Profit of Selling materials) |
CBoC | (0.95 × Cost of Landfilling + Demolition Cost) |
Changing regulation | SMOOTH( IF THEN ELSE(NSR <= 80, IF THEN ELSE(NSR <= 60, IF THEN ELSE(NSR <= 40, IF THEN ELSE(NSR <= 20, 1, 5), 20), 20), 25), 6) |
Cost of landfilling | Lu × Landfilled Materials |
Deconstruction viability | (DCP + PoMBE)/2 × 0.01 |
Deconstruction cost | DcCu × "Waste Generated (Dc)" |
Demolition cost | DmCu × "Waste Generated (Dm)" |
Disposing | (pID) × "Waste Generated (Dm)" × 0.005 |
DmCu | 4 |
Efficiency of recycling | PoMBE × 0.01 |
EItIB | SMOOTH(1 – Ratio of CBoBIM to the CBoC, TNSARI) |
Environmental emissions | DELAY1( Illegal dumped waste, 24) |
FINAL TIME | 108 |
Illegal dumped waste | Initial value: 1000 |
Illegal dumping | MAX( pID × "Waste Generated (Dm)" × 0.005, 50) |
ItDE | IF THEN ELSE(Regulation <= 80, IF THEN ELSE(Regulation <= 60, IF THEN ELSE(Regulation <= 40, 0.6 × Deconstruction Viability, 0.8 × Deconstruction Viability), 0.9 × Deconstruction Viability), Deconstruction Viability) |
ItDI | IF THEN ELSE(Lu <= 180,IF THEN ELSE(Lu <= 160, IF THEN ELSE(Lu <= 140, IF THEN ELSE(Lu <= 120, IF THEN ELSE(Lu <= 100, (90 – 0.9 × Regulation) × 0.01, (90 – 0.8 × Regulation) × 0.01), (90 – 0.7 × Regulation) × 0.01), (90 – 0.6 × Regulation) × 0.01), (90 – 0.5 × Regulation) × 0.01), (90 – 0.4 × Regulation) × 0.01) |
ItSW | IF THEN ELSE(Regulation <= 90, IF THEN ELSE(Regulation <= 75, IF THEN ELSE(Regulation <= 50, 0.5 × EItIB, 1 × EItIB), 1.5 × EItIB), 2 × EItIB) |
KNiDfD | 100 – (80/(0.1 × Time + 1)) |
Landfilled materials | Disposing + "Sorting (l)" |
Lu | 180 |
MC | MCu × "Waste Generated (m)" |
MCu | 125 |
ML | DELAY3( (0.01*DCP + EItIB)/2, 10) |
MQ | IF THEN ELSE(ML <= 0.5, IF THEN ELSE(ML <= 0.4, IF THEN ELSE(ML <= 0.3, IF THEN ELSE(ML <= 0.15, 0.05, 0.15), 0.25), 0.35), 0.4) |
NSR | SMOOTH3I(Public Complaints, 10, 90) |
pID | ItDI × 100 |
POA | DCP × 0.01 |
PoDC | ANoDC/ANoC |
PoIUC | SMOOTH( 100 – "3BVS", 2) |
PoMBE | DELAY1( IF THEN ELSE(EItIB <= 0.2, IF THEN ELSE(EItIB <= 0.15, IF THEN ELSE( EItIB <= 0.1, 30, 50), 75), 95), 10) |
PoROM | KNiDfD/100 |
pRecycling | 0.96 – pReusing |
pReusing | IF THEN ELSE(MQ <= 5, IF THEN ELSE(MQ <= 4, IF THEN ELSE(MQ <= 3, IF THEN ELSE(MQ <= 2, 0.05, 0.15), 0.25), 0.35), 0.4) |
PSRu | 150 |
PSRyu | 100 |
Public complaints | IF THEN ELSE(Public dissatisfaction <= 0.6, IF THEN ELSE( Public dissatisfaction <= 0.45, IF THEN ELSE(Public dissatisfaction <= 0.3, IF THEN ELSE(Public dissatisfaction <= 0.2, IF THEN ELSE(Public dissatisfaction <= 0.1, 10,20),35),50),65),80) |
Public dissatisfaction | SMOOTH3( TREND(Environmental Emissions, 1, 1),4) |
Ratio of CBoBIM to the CBoC | 1 – CBoBIM/CBoC |
RC | Unit cost of Reusing × Reused waste |
RCu | 90 |
Recycled waste | Recycling |
Recycling | Sorted waste × Efficiency of Recycling × pRecycling |
Regulation | SMOOTH( Changing Regulation × 0.1, 6) |
Reusing | Sorted waste × pReusing |
RVRbBDO | wDO × (1 – PoROM) |
RWGFCSA | (1 – PoMBE/100) × wPL |
RWGtCE | (1 – PoDC) × wCE |
RWGtCOR | wCO × COR |
RWGtLOO | wAO × (1 – POA) |
RyC | Recycled waste × RCu |
SCu | 30 |
Sorted waste | "Sorting (C)" + "Sorting (D)" + "Sorting (M)" – Recycling – Reusing – "Sorting (l)" |
"Sorting (C)" | ItSW × "Waste Generated (c)" × 0.01 |
"Sorting (D)" | ItSW × "Waste Generated (Dc)" × 0.01 |
"Sorting (l)" | Sorted waste × 0.04 |
"Sorting (M)" | "Waste Generated (m)" × ItSW × 0.01 |
Sorting Cost | Sorted waste × SCu |
The volume of the buildings | 10,000 |
Total profit of selling materials | Recycled waste × PSRyu + PSRu × Reused waste |
wAO | 10 |
Unit cost of reusing | 70 |
"Waste generated (c)" | WGC – "Sorting (C)" |
"Waste generated (Dc)" | WGDc – "Sorting (D)" |
"Waste generated (Dm)" | WGDm – Disposing-Illegal Dumping |
"Waste generated (m)" | WGM – "Sorting (M)" |
wCE | 10 |
wCO | 10 |
wDO | 20 |
WGC | The Volume of The Buildings × 0.1 × WROiC |
WGDc | The Volume of The Buildings × ItDE |
WGDm | The Volume of The Buildings × (1 – ItDE) |
WGM | (1 – ML) × The Volume of The Buildings × 0.01 |
wPL | 50 |
WROiC | SMOOTH( (RWGFCSA + RWGtCOR + RVRbBDO + RWGtCE + RWGtLOO) × 0.01, 2) |
"3BVS" | IF THEN ELSE(EItIB <= 0.25, IF THEN ELSE(EItIB <= 0.15, IF THEN ELSE(EItIB <= 0.05, 20, 0.7 × KNiDfD), 0.85 × KNiDfD), KNiDfD) |
IF THEN ELSE(LOD <= 5, IF THEN ELSE(LOD <= 4, IF THEN ELSE(LOD <= 3, IF THEN ELSE( LOD <= 2, 40, 50),65), 80), 95) |
References
- Yuan, H. A model for evaluating the social performance of construction waste management. Waste Manag. 2012, 32, 1218–1228. [Google Scholar] [CrossRef] [PubMed]
- Mah, C.M.; Fujiwara, T.; Ho, C.S. Construction and demolition waste generation rates for high-rise buildings in Malaysia. Waste Manag. Res. 2016, 34, 1224–1230. [Google Scholar] [CrossRef] [PubMed]
- Ibrahim, M.I.M. Estimating the sustainability returns of recycling construction waste from building projects. Sustain. Cities Soc. 2016, 23, 78–93. [Google Scholar] [CrossRef]
- US. Environmental Protection Agency (EPA). Advancing Sustainable Materials Management: 2017 Fact Sheet; U.S. EPA: Washington, DC, USA, 2019.
- Bakshan, A.; Srour, I.; Chehab, G.; El-fadel, M. A field-based methodology for estimating waste generation rates at various stages of construction projects Resources, Conservation and Recycling A field-based methodology for estimating waste generation rates at various stages of construction projects. Resour. Conserv. Recycl. 2019, 100, 70–80. [Google Scholar] [CrossRef]
- Ling, F.Y.Y.; Lim, M.C.H. Implementation of a waste management plan for construction projects in Singapore. Archit. Sci. Rev. 2002, 45, 73–81. [Google Scholar] [CrossRef]
- Wang, J.; Yuan, H.; Kang, X.; Lu, W. Critical success factors for on-site sorting of construction waste: A china study. Resour. Conserv. Recycl. 2010, 54, 931–936. [Google Scholar] [CrossRef]
- Liu, Z.; Lu, Y.; Peh, L.C. A Review and Scientometric Analysis of Global Building Information Modeling (BIM) Research in the Architecture, Engineering and Construction (AEC) Industry. Buildings 2019, 9, 210. [Google Scholar] [CrossRef] [Green Version]
- Lu, W.; Yuan, H. A framework for understanding waste management studies in construction. Waste Manag. 2011, 31, 1252–1260. [Google Scholar] [CrossRef] [Green Version]
- Yuan, H.P.; Shen, L.Y.; Hao, J.J.L.; Lu, W.S. A model for cost–benefit analysis of construction and demolition waste management throughout the waste chain. Resour. Resour. Conserv. Recycl. 2011, 55, 604–612. [Google Scholar] [CrossRef]
- Wang, C.; Li, Z.; Tam, V.W. Identifying best design strategies for construction waste minimization. J. Clean. Prod. 2015, 92, 237–247. [Google Scholar] [CrossRef]
- Jalaei, F.; Zoghi, M.; Khoshand, A. Life cycle environmental impact assessment to manage and optimize construction waste using Building Information Modeling (BIM). Int. J. Constr. Manag. 2019. [Google Scholar] [CrossRef]
- Forrester, J.W. Industrial Dynamics: A Major Breakthrough for Decision Makers. Roots Logist. 2012, 36, 141–172. [Google Scholar]
- Tam, V.W.; Shen, L.; Tam, C.M. Assessing the levels of material wastage affected by sub-contracting relationships and projects types with their correlations. Build. Environ. 2007, 42, 1471–1477. [Google Scholar] [CrossRef] [Green Version]
- Jaillon, L.C.; Poon, C.; Chiang, Y.H. Quantifying the waste reduction potential of using prefabrication in building construction in Hong Kong. Waste Manag. 2009, 29, 309–320. [Google Scholar] [CrossRef] [PubMed]
- Abbasianjahromi, H.; Khoshand, A.; Zoghi, M.; Heydarzadeh, M.J. At glance at the world: Effect of construction activities on construction and demolition waste generation in Iran. Waste Manag. 2007, 70. [Google Scholar] [CrossRef]
- Innes, S. Developing tools for designing out waste pre-site and on-site. In Proceedings of the Minimizing Construction Waste Conference: Developing Resource Efficiency and Waste Minimization in Design and Construction, London, UK, 21 October 2004. [Google Scholar]
- Hannan, M.A.; al Mamun, M.A.; Hussain, A.; Basri, H.; Begum, R.A. A review on technologies and their usage in solid waste monitoring and management systems: Issues and challenges. Waste Manag. 2015, 43, 509–523. [Google Scholar] [CrossRef]
- National Institute of Building Sciences (NIBS). National Building Information Modeling Standard-Version 2; National Institutute of Building Sciences: Washington, DC, USA, 2012. [Google Scholar]
- Won, J.; Cheng, J.C.P.; Lee, G. Quantification of construction waste prevented by BIM-based design validation: Case studies in South Korea. Waste Manag. 2016, 49, 170–180. [Google Scholar] [CrossRef]
- Rajendran, P.; Gomez, C.P. Implementing BIM for waste minimization in the construction industry: A literature review. In Proceedings of the 2nd International Conference on Management, Langkawi Kedah, Malaysia, 1 January 2012; pp. 557–570. [Google Scholar]
- Ahankoob, A.; Khoshnava, S.M.; Rostami, R.; Preece, C. BIM perspectives on construction waste reduction. In Proceedings of the Management in Construction Research Association (MiCRA) Postgraduate Conference, Kuala Lumpur, Malaysia, 5–6 December 2012; pp. 195–199. [Google Scholar]
- Motawa, I.; Almarshad, A. A knowledge-based BIM system for building maintenance. Autom. Constr. 2013, 29, 173–182. [Google Scholar] [CrossRef]
- Ngwepe, L.; Aigbavboa, C. A theoretical review of building life cycle stages and their related environmental impacts. J. Civil Eng. Environ. Technol. 2015, 2, 7–15. [Google Scholar]
- Ragheb, A.F. Towards Environmental Profiling for Office Buildings Using Life Cycle Assessment (LCA). Ph.D. Thesis, University of Michigan, Ann Arbor, MI, USA, 2011. [Google Scholar]
- Department for Environment, Food & Rural Affairs. Demolition and Excavation Waste Generation Estimate; Department for Environment, Food & Rural Affairs: London, UK, 2012.
- Guy, B.; Ciarimboli, N. DfD: Design for Disassembly in the Built Environment: A Guide to Closed-loop Design and Building; Hamer Center: Seattle, WA, USA, 2008. [Google Scholar]
- Macozoma, D.S. Building Deconstruction, International Council for Research and Innovation in Building And Construction (CIB). December 2001. [Google Scholar]
- Tingley, D.D.; Davison, B. Developing an LCA methodology to account for the environmental benefits of design for deconstruction. Build. Environ. 2012, 57, 387–395. [Google Scholar] [CrossRef]
- Fishbein, B.K. Building for the Future: Strategies to Reduce Construction and Demolition Waste in Municipal Projects; INFORM, Incorporated: Metro Manila, Philippines, 1998. [Google Scholar]
- Chini, A.R.; Balachandran, S. Anticipating and responding to deconstruction through building design. In Proceedings of the Design for Deconstruction and Materials Reuse; CIB Publisher: Montreal, QC, Canada, 2002; Volume 272, pp. 175–185. [Google Scholar]
- Snook, K.; Ridout, R.; Turner, A. Recycling Waste from the Construction Site; Chartered Institute of Building: Bracknell, UK, 1995. [Google Scholar]
- Kim, S.; Chang, S.; Castro-Lacouture, D. Dynamic Modeling for Analyzing Impacts of Skilled Labor Shortage on Construction Project Management. J. Manag. Eng. 2020, 36, 04019035. [Google Scholar] [CrossRef]
- Kollikkathara, N.; Feng, H.; Yu, D. A system dynamic modeling approach for evaluating municipal solid waste generation, landfill capacity and related cost management issues. Waste Manag. 2010, 30, 2194–2203. [Google Scholar] [CrossRef] [PubMed]
- Sterman, J.D. Modeling Managerial Behavior: Misperceptions of Feedback in a Dynamic Decision Making Experiment. Manag. Sci. 1989, 35, 321–339. [Google Scholar] [CrossRef] [Green Version]
- Sterman, J.D. System Dynamics Modeling: Tools for Learning in a Complex World. Calif. Manag. Rev. 2001, 43, 8–25. [Google Scholar] [CrossRef]
- Dyson, B.; Chang, N.-B. Forecasting municipal solid waste generation in a fast-growing urban region with system dynamics modeling. Waste Manag. 2005, 25, 669–679. [Google Scholar] [CrossRef]
- Chaerul, M.; Tanaka, M.; Shekdar, A.V. A system dynamics approach for hospital waste management. Waste Manag. 2008, 28, 442–449. [Google Scholar] [CrossRef]
- Homer, J.; Oliva, R. Maps and models in system dynamics: A response to Coyle. Syst. Dyn. Rev. 2001, 17, 347–355. [Google Scholar] [CrossRef]
- Elmaraghy, A.; Voordijk, H.; Marzouk, M.M. An exploration of BIM and lean interaction in optimizing demolition projects. In Proceedings of the 26th Annual Conference of the International Group for Lean Construction, Chennai, India, 16–22 July 2018; pp. 112–122. [Google Scholar]
- Cheng, J.C.P.; Ma, L.Y. A BIM-based system for demolition and renovation waste estimation and planning. Waste Manag. 2013, 33, 1539–1551. [Google Scholar] [CrossRef]
- Arditi, D.; Nawakorawit, M. Designing buildings for maintenance: Designers’ perspective. J. Arch. Eng. 1999, 5, 107–116. [Google Scholar] [CrossRef]
- Miles, F.M.; Wilson, T.G. Managing project risk and the performance envelope. In Proceedings of the APEC’98 Thirteenth Annual Applied Power Electronics Conference and Exposition, Piscataway, NJ, USA, 15–19 February 1998; pp. 247–253. [Google Scholar]
- Mollasalehi, S.; Fleming, A.; Talebi, S.; Underwood, J. Development of an Experimental Waste Framework Based on BIM/LEAN Concept in Construction Design. In Proceedings of the 24th Annual Conference of the International Group for Lean Construction, Boston, FL, USA, 18–24 July 2016; pp. 193–202. [Google Scholar]
- Poon, C.; Yu, T.W.; Ng, L.H. A Guide for Managing and Minimizing Building and Demolition Waste; Department of Civil & Structural Engineering, Hong Kong Polytechnic University: Hong Kong, China, 2001. [Google Scholar]
- Grilo, A.; Jardim-Goncalves, R. Value proposition on interoperability of BIM and collaborative working environments. Autom. Constr. 2010, 19, 522–530. [Google Scholar] [CrossRef]
- Akinade, O.; Oyedele, L.; Omoteso, K.; Ajayi, S.O.; Bilal, M.; Owolabi, H.A.; Alaka, H.A.; Ayris, L.; Looney, J.H. BIM-based deconstruction tool: Towards essential functionalities. Int. J. Sustain. Built Environ. 2017, 6, 260–271. [Google Scholar] [CrossRef]
- Bansal, N. Reduce-Reuse-Recycle: Designing with Salvaged Building Materials; School of Planning and Architecture: New Delhi, India, 2006. [Google Scholar]
Principle | Reference |
---|---|
Avoiding toxic materials | Macozoma [28] |
Using high-durability materials | Tingley and Davison [29] |
Using the minimum number of connections | Fishbein [30] |
Retaining building information | Macozoma [28] |
Using reusable and recyclable materials | Macozoma [28] |
Using bolts in joints instead of welding | Chini and Balachandran [31] |
Using prefabricated materials | Jaillon et al. [15] |
Avoiding nails and adhesives | Jaillon et al. [15] |
Variable | Abbreviation | Reference |
---|---|---|
3D Building information modeling (BIM) visualization services | 3BVS | Elmaraghy et al. [40] |
Average number of clashes | ANoC | Won et al. [20] |
Average number of detected clashes | ANoDC | Won et al. [20] |
Cost–benefits of using BIM in construction waste management (CWM) | CBoBIM | |
Cost–benefits of conventional CWM | CBoC | Yuan et al. [10] |
Change order requests | COR | Jalaei et al. [12] |
Data capturing potential | DCP | Elmaraghy et al. [40] |
Demolition cost per unit | DmCu | |
Deconstruction cost per unit | DuCu | |
Economic incentive to implement BIM | EItIB | Yuan et al. [10] |
Incentive to deconstruct elements | ItDE | Jalaei et al. [12] |
Incentive to dump illegally | ItDI | Yuan [1] |
Incentive to sort waste | ItSW | Yuan et al. [10] |
Level of detail | LOD | Cheng and Ma [41] |
Landfill charge per unit | Lu | |
Maintenance cost | MC | Jalaei et al. [12] |
Maintenance cost per unit | MCu | |
Maintenance level | ML | Arditi and Nawakorawit [42] |
Maintenance quality | MQ | Arditi and Nawakorawit [42] |
Need to strengthen regulations | NSR | Yuan [1] |
Percent of illegal dumping | pID | |
Purchase order accuracy | POA | Elmaraghy et al. [40] |
Possibility of detecting clashes | PoDC | |
Possibility of introducing unnecessary changes | PoIUC | Jalaei et al. [12] |
Percent of modular buildings elements | PoMBE | |
Potential to reduce overall materials use through design optimization | PoROM | Jalaei et al. [12] |
Percent of materials to recycle | pRecycle | |
Percent of materials to reuse | pReuse | |
Price for selling reused materials per unit | PSRu | |
Price for selling recycled materials per unit | PSRyu | |
Reuse cost | RC | Yuan et al. [10] |
Recycling cost per unit | RCu | |
Rate of volume reduction by building design optimization | RVRbBDO | |
Rate of waste generation from construction site activities | RWGFCSA | |
Rate of waste generation to rate of clashing elements | RWGtCE | |
Rate of Waste generation to change order requests | RWGtCOR | |
Rate of waste generation through loss and over-ordering | RWGtLOO | |
Recycling cost | RyC | Yuan et al. [10] |
Sorting cost per unit | SCu | |
Knowledge needs for design of deconstruction | SNiDfD | Jalaei et al. [12] |
Time needed for stakeholders to accept the risk of investment | TNSARI | Miles and Wilson [43] |
Weight of design optimization | wDO | |
Waste generation from construction process | WGC | Jalaei et al. [12] |
Waste generation from deconstruction at the end of building life | WGDc | Jalaei et al. [12] |
Waste generation dumped to landfill at the end of building life | WGDm | Yuan et al. [10] |
Waste generation from maintenance process | WGM | Jalaei et al. [12] |
Waste reduction potential in construction | WRPiC | Jalaei et al. [12] |
Material (unit) | BIM-Based CWM in Building Close | Conventional CWM in Building Close | |||||||
---|---|---|---|---|---|---|---|---|---|
Recycling Cost (A) | Deconstruction Cost (B) | Landfill Cost (C) | Profit from Selling (D) | Profit E (D −( A + B + C)) | Demolition Cost (B) | Landfill Charge (C) | Profit from Selling (D) | Profit E (D − (B + C)) | |
Concrete (m3) | 133,320.86 | 90,901.66 | 57,951.88 | 19,490.96 | −262,683.00 | 58,924.14 | 260,783.50 | −319,708.00 | |
Rebar (ton) | 568.87 | 90.98 | 2924.50 | 2264.64 | 2843.26 | 4061.80 | 1218.54 | ||
Structure metal (ton) | 144,357.19 | 4042.00 | 424,410.15 | 276,011.00 | 92,499.65 | 5285.69 | 184,999.30 | 87,213.96 | |
Gypsum (ton) | 18,058.09 | 159,706.39 | 2223.12 | 231,522.17 | 51,534.56 | 1261.94 | 41,846.98 | −43,108.90 | |
Door wood (Ea./m2) | 14,231.16 | 16,946.00 | 8679.55 | 110,216.61 | 70,359.88 | 7694.40 | 1822.33 | −5872.06 | |
Door aluminum (m2/m3) | 2476.60 | 2405.00 | 272.50 | 11,700.00 | 6545.88 | 1092.00 | 2725.06 | −3817.07 | |
Window (m2) | 83.76 | 333.00 | 9.67 | 364.5 | −61.94 | 188.75 | 96.76 | −285.52 | |
window (Ea.) | 4504.18 | 16,650.00 | 2979.70 | 16,200.00 | −7933.89 | ||||
Clay ceramic (m2) | 52.29 | 43,156.68 | −43,209.00 | 43,156.68 | 34,941.80 | −78,098.50 | |||
Pipes (m) | 5321.08 | −5321.09 | |||||||
Plumbing (Ea.) | 10,018.50 | 30,000.00 | 4.48 | 57,375.00 | 17,352.01 | 63,750.00 | 44.89 | −63,794.90 | |
Cabinet (Ea./m2) | 15,627.89 | 3834.00 | 1036.61 | 9720.00 | −10,778.50 | 3834.00 | 10,366.18 | −14,200.20 | |
Lighting fixture | 79,317.09 | 6.79 | 7866.00 | −71,457.90 | 67.94 | −67.94 | |||
Railing (m) | 718.50 | 866.14 | 4063.50 | 2478.85 | 866.14 | 135.00 | −731.14 | ||
Ducts (ton) | 94,783.61 | 62,040.18 | −32,743.40 | 94,783.61 | 10,943.65 | −105,727.00 | |||
Blue stone (m2) | 4036.80 | 7297.86 | 24,234.67 | 70,991.14 | 35,421.80 | 7297.86 | 242,346.70 | −249,645.00 | |
Brick (m2) | 23,625.72 | 294,207.10 | 4940.84 | 113,974.86 | −208,799.00 | 226,398.43 | 49,408.48 | −275,807.00 | |
Total | 226,754.39 | 990,651.72 | 106,472.90 | 1,142,859.60 | −181,019.00 | 631,544.67 | 676,563.40 | 191,018.44 | −1,117,089.70 |
Material (Unit) | Construction Phase | Maintenance and Operation Phase | ||||||
---|---|---|---|---|---|---|---|---|
Non-BIM | BIM | Non-BIM | BIM | |||||
CWM Cost | Clash Detection | Change Order | Construction Waste Cost | Maintenance Cost | Average Life Time | Maintenance Cost | Average Life Time | |
Concrete (m3) | −28,975.93 | −3.18 | ||||||
Rebar (ton) | −121.85 | |||||||
Structure metal (ton) | −5663.24 | |||||||
Gypsum (ton) | −418.46 | −4163.65 | −222.31 | −27,224.45 | 75 | −23,673.43 | 25 | |
Door wood (Ea./m2) | −35,577.92 | 30 | ||||||
Door aluminum (m2/m3) | −6191.51 | 30 | ||||||
Window (m2) | −209.41 | 30 | ||||||
window (Ea.) | 33 | −559.72 | 30 | |||||
Clay ceramic (m2) | −655.15 | −118,291.07 | 50 | |||||
Pipes (m) | −493.26 | |||||||
Plumbing (Ea.) | −15,155.28 | 25 | −29,144.76 | 13 | ||||
Cabinet (Ea./m2) | −10,797.38 | 38 | ||||||
Lighting fixture | −0.67 | −39,761.25 | 38 | |||||
Railing (m) | ||||||||
Ducts (ton) | −109.43 | −19,455.4 | ||||||
Blue stone (m2) | −45,018.75 | 30 | −105,133 | 10 | ||||
Brick (m2) | −12,117.33 | −721.27 | ||||||
Concrete (m3) | 2470.42 | −8847.76 | ||||||
Total | −45,591.69 | −19,948.7 | −13,735.9 | −222.31 | −87,398.48 | −369,339.48 |
Cost Descriptions (Units: $) | BIM-Based CWM | Conventional CWM |
---|---|---|
Total recycling and preparation Cost (A) | −226,754.40 | |
Total deconstruction cost (B) | −990,651.70 | −631,544.70 |
Total landfill cost (C) | −106,472.90 | −676,563.40 |
Total waste cost during construction (D) | −222.31 | |
Total maintenance cost (E) | −369.339.48 | −79,276.29 |
Total life cycle cost (F = A + B + C + D +E) | −1,693,440.79 | −1,474,782.87 |
Profit from selling (G) | 1,142,860.00 | 191,018.40 |
Total cost after selling (H = G + F) | −550,580.79 | −1,283,764.47 |
Total cost per Square Foot ($/S.F.) | −4.32 | −10.06 |
Percent of cost savings | 0.57 (57%) |
© 2020 by the authors. Licensee MDPI, Basel, Switzerland. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license (http://creativecommons.org/licenses/by/4.0/).
Share and Cite
Zoghi, M.; Kim, S. Dynamic Modeling for Life Cycle Cost Analysis of BIM-Based Construction Waste Management. Sustainability 2020, 12, 2483. https://doi.org/10.3390/su12062483
Zoghi M, Kim S. Dynamic Modeling for Life Cycle Cost Analysis of BIM-Based Construction Waste Management. Sustainability. 2020; 12(6):2483. https://doi.org/10.3390/su12062483
Chicago/Turabian StyleZoghi, Milad, and Sungjin Kim. 2020. "Dynamic Modeling for Life Cycle Cost Analysis of BIM-Based Construction Waste Management" Sustainability 12, no. 6: 2483. https://doi.org/10.3390/su12062483
APA StyleZoghi, M., & Kim, S. (2020). Dynamic Modeling for Life Cycle Cost Analysis of BIM-Based Construction Waste Management. Sustainability, 12(6), 2483. https://doi.org/10.3390/su12062483