Next Article in Journal
Prediction of Customer Churn Behavior in the Telecommunication Industry Using Machine Learning Models
Next Article in Special Issue
Towards Sustainable Inventory Management: A Many-Objective Approach to Stock Optimization in Multi-Storage Supply Chains
Previous Article in Journal
Employing a Convolutional Neural Network to Classify Sleep Stages from EEG Signals Using Feature Reduction Techniques
Previous Article in Special Issue
Multiprocessor Fair Scheduling Based on an Improved Slime Mold Algorithm
 
 

Order Article Reprints

Journal: Algorithms, 2024
Volume: 17
Number: 230

Article: Mitigating Co-Activity Conflicts and Resource Overallocation in Construction Projects: A Modular Heuristic Scheduling Approach with Primavera P6 EPPM Integration
Authors: by Khwansiri Ninpan, Shuzhang Huang, Francesco Vitillo, Mohamad Ali Assaad, Lies Benmiloud Bechet and Robert Plana
Link: https://www.mdpi.com/1999-4893/17/6/230

MDPI offers high quality article reprints with convenient shipping to destinations worldwide. Each reprint features a 270 gsm bright white cover and 105 gsm premium white paper, bound with two stitches for durability and printed in full color. The cover design is customized to your article and designed to be complimentary to the journal.

Quote and Order Details

Contact Person

Invoice Address

Notes or Comments

Validate and Place Order

The order must be prepaid after it is placed

req denotes required fields.
Back to TopTop