A Performance Evaluation and Feasibility Study of Mine Thermal Energy Storage in Glace Bay, Nova Scotia

Department of Electrical and Computer Engineering, Dalhousie University, Halifax, NS B3H 4R2, Canada
*
Author to whom correspondence should be addressed.
Energies 2025, 18(17), 4780; https://doi.org/10.3390/en18174780 (registering DOI)
Submission received: 23 July 2025 / Revised: 25 August 2025 / Accepted: 5 September 2025 / Published: 8 September 2025
(This article belongs to the Special Issue Advances in Thermal Energy Storage Systems: Methods and Applications)

Abstract

Mine Thermal Energy Storage (MTES) offers a promising solution for sustainable heating by repurposing abandoned, water-filled mines as underground thermal reservoirs. This study assesses the feasibility of implementing MTES in Nova Scotia, with a focus on the Sydney coalfield region, particularly Glace Bay. The research combines geological analysis, residential heat demand estimation, thermal storage capacity estimation, and cost–benefit evaluation to determine whether abandoned coal mines can support district heating applications. Results show that MTES can deliver substantial heating cost reductions compared to oil-based systems, while significantly lowering greenhouse gas emissions. The study also explores the integration of MTES with local renewable energy sources, including wind and solar, to enhance energy system flexibility and reliability. International case studies from Springhill (Canada), Heerlen (Netherlands), and Bochum (Germany) are referenced to contextualize the analysis and demonstrate how the findings of this study align with broader MTES scalability, performance, and operational challenges. Key technical barriers, such as water quality management, infrastructure investment, and seasonal variability in heat demand, are discussed. Overall, the findings highlight MTES as a viable and sustainable energy storage approach for Nova Scotia and other regions with legacy mining infrastructure.

1. Introduction

The global shift toward low-carbon and sustainable energy systems has become a critical priority as governments, industries, and communities respond to the dual challenges of climate change and fossil fuel dependency. Thermal Energy Storage (TES) systems have emerged as key enablers of renewable energy integration, providing the flexibility to match intermittent energy generation with variable demand. TES can improve energy efficiency, stabilize grid operations, and enable sector coupling between power, heating, and industrial applications [1]. Among various TES approaches, Mine Thermal Energy Storage (MTES) is a novel and increasingly recognized strategy that utilizes abandoned, water-filled mines as large-scale underground thermal reservoirs [2]. As illustrated in Figure 1, the number of publications on MTES has steadily increased in recent years, reflecting its growing academic and practical relevance.
MTES systems are particularly promising in post-mining regions where extensive subsurface infrastructure remains unused. These flooded mines provide naturally insulated environments capable of storing significant volumes of thermal energy with minimal surface disturbance. In contrast to conventional above-ground TES systems that often require substantial land, construction, and material inputs, MTES takes advantage of existing geological voids and hydraulic connectivity within a mine network. This allows for cost-effective, low-carbon heating solutions at the community or district scale [3]. Importantly, MTES enables seasonal heat storage—absorbing and storing excess heat during summer or off-peak periods and extracting it in winter when heating demand peaks.
In cold-climate regions such as Canada, seasonal imbalance between heating needs and renewable energy supply presents a significant challenge. Wind and solar power generation are variable and often out of phase with thermal demand. Notably, wind energy tends to be more abundant during winter months, while solar energy peaks in the summer. This seasonal complementarity results in periods of excess (or curtailed) renewable electricity, which could be redirected to MTES systems. Therefore, MTES offers a practical pathway to mitigate this mismatch by capturing surplus renewable or waste heat and using it to heat residential, commercial, or industrial buildings during colder months [4]. Heat extraction is typically achieved via open- or closed-loop well systems connected to heat exchangers and high-efficiency heat pumps. This study examines the typical configuration of mine-water geothermal systems, in which heated or cooled mine water is circulated between underground reservoirs and surface heat exchange systems [5]. Building on this fundamental concept, the proposed MTES design for Nova Scotia incorporates several performance-enhancing modifications, including the optimization of extraction and reinjection well placement to reduce hydraulic short-circuiting, integration with wind and solar energy sources to address seasonal imbalances, and the adoption of high-efficiency water-source heat pumps and plate heat exchangers to improve thermal recovery under local conditions.
Several international case studies have successfully demonstrated the technical feasibility and socioeconomic benefits of MTES. The Springhill Project in Nova Scotia, Canada has supplied geothermal heating to municipal and commercial buildings since the 1980s using water from flooded coal mines [6,7]. In the Netherlands, the Heerlen Minewater Project transformed abandoned mines into a district heating and cooling system, pioneering the use of standing column wells and bidirectional thermal flow control to serve multiple buildings with low-carbon heat [4]. Similarly, in Bochum, Germany, the HT-MTES project integrates solar thermal collectors and high-temperature heat pumps with repurposed mine shafts to deliver seasonal thermal energy to a district heating network [8]. In the United Kingdom, pilot systems at the Caphouse and Markham Collieries have explored both open- and closed-loop configurations for mine water heat recovery [9]. These examples illustrate not only the engineering viability of MTES but also its adaptability to diverse climatic, geological, and infrastructural conditions. They also underscore the potential for MTES to support just transitions in coal-dependent regions by revitalizing legacy infrastructure and creating green energy hubs.
Nova Scotia presents a unique opportunity for MTES implementation due to its extensive inventory of abandoned coal mines and ambitious climate targets. The province aims to achieve 80% renewable electricity generation by 2030 and phase out coal-fired power [10]. However, the seasonal and intermittent nature of wind and solar energy resources poses reliability challenges. Simultaneously, heating in Nova Scotia remains heavily reliant on oil, with high per-household energy costs and high carbon intensity. MTES offers a compelling alternative by enabling local, secure, and low-carbon heat supply using infrastructure already embedded in the landscape.
This study investigates the feasibility of MTES in Nova Scotia, with a focus on the Sydney coalfield, a historically significant mining region on Cape Breton Island [11] The Sydney coalfield includes over 50 abandoned underground coal mines, collectively estimated to contain more than 190 million cubic meters of mine water [11,12,13]. This research specifically examines the 1B Hydraulic System, a well-documented subsystem within the coalfield that comprises ten interconnected mines holding approximately 76.7 million cubic meters of water [14]. This volume represents a significant opportunity for high-capacity, seasonal thermal energy storage at the community or district scale.
The study integrates multiple lines of analysis, including geological and hydrogeological assessment, residential and sectoral heating demand estimation, mine water thermal capacity calculation, system design, energy requirements, and economic feasibility. It also compares the Levelized Cost of Heat (LCOH) for MTES with conventional oil-based heating and individual heat pump systems. Beyond technical feasibility, this work explores the potential for MTES to support regional renewable integration by coupling with wind and solar power, storing excess energy during off-peak periods and releasing it during peak demand. Such integration enhances grid flexibility and aligns with Nova Scotia’s decarbonization strategy.
However, despite Nova Scotia’s strong potential for MTES deployment and the existence of an operational project in Springhill, no comprehensive, site-specific feasibility study has been conducted elsewhere in the province. This research aims to address this gap by evaluating the technical, economic, and environmental dimensions of implementing MTES in Glace Bay, thereby providing a foundation for future planning, investment, and policy development in Atlantic Canada.
By situating MTES within both local and international contexts, this study contributes to a growing body of knowledge on underground thermal energy storage and its role in sustainable energy transitions. It builds upon the best global practices while addressing the specific geological, climatic, and economic conditions of Nova Scotia. In doing so, it supports academic research and infrastructure planning and provides a foundation for pilot project deployment and strategic mine site reuse across the province.

2. Background and Related Work

2.1. Overview of Thermal Energy Storage Technologies

Thermal Energy Storage (TES) can play a valuable role in modern energy systems, particularly by enabling the temporary storage of excess thermal energy for later use, supporting the integration of intermittent renewables and the decarbonization of heating. By decoupling energy supply from demand, TES systems support grid stability, enhance the flexibility of renewable energy integration, and improve energy system efficiency. Various TES technologies have been developed, including Borehole Thermal Energy Storage (BTES), Aquifer Thermal Energy Storage (ATES), and Cavern Thermal Energy Storage (CTES), each with distinct geotechnical and operational characteristics [1,15,16]. BTES involves vertical or horizontal boreholes drilled into the ground to store heat in soil or rock layers, typically used for seasonal heating applications [16,17]. ATES systems use naturally occurring aquifers to store thermal energy by injecting and extracting groundwater through wells [3,16]. CTES, often implemented in rock caverns or salt formations, can provide high-capacity, long-duration storage, especially when paired with industrial-scale heating or cooling demands [18].
Among these, Mine Thermal Energy Storage (MTES) has gained attention as a regionally scalable and cost-effective solution in areas with a legacy of underground mining [4,19,20]. MTES systems utilize flooded or abandoned mine shafts as subsurface reservoirs to store and retrieve heat for district or building-level heating applications. These systems leverage existing infrastructure, reducing land-use conflict and capital costs, while offering long-term storage potential and high spatial capacity [2,3]. However, their feasibility is influenced by subsurface conditions, mine layout, hydrogeology, and proximity to heating demand.

2.2. Infrastructure and Operating Principles of MTES

MTES systems generally consist of subsurface mine reservoirs and above-ground infrastructure that includes extraction and reinjection wells, pumps, heat exchangers, insulated distribution piping, and control systems. Heat injection occurs during periods of surplus thermal energy availability (e.g., summer or off-peak hours), with heat stored in mine water and surrounding rock. During colder months, the stored heat is extracted, upgraded by a heat pump, and supplied to end users. The system functions cyclically, absorbing and discharging thermal energy over time.
The working principle of a mine-water MTES system involves four interconnected steps [21]. First, warm mine water is pumped from the flooded coal seam to the surface, carrying geothermal heat and, during warmer months, potentially enhanced by solar thermal or industrial waste heat. Second, this heat is transferred via a heat exchanger to a district heating or cooling network. Third, a heat pump raises the temperature to a usable level for buildings or industrial use. Finally, the cooled mine water is reinjected into the mine, where it gradually regains heat from the surrounding rock. This cyclical process enables MTES to function as a seasonal thermal battery, ideal for cold-climate applications.
System performance depends heavily on the efficiency of pumps, heat exchangers, and heat pumps. Heat exchangers are typically either [22]:
  • Direct systems, where mine water transfers heat directly to the working fluid (higher efficiency, but susceptible to fouling and corrosion), or
  • Indirect systems, which use a secondary fluid (e.g., glycol or brine) to isolate the mine water and reduce maintenance needs [3].
Heat pumps raise the temperature of extracted mine water (typically 12–20 °C) to usable heating levels. System efficiency is usually evaluated using the Coefficient of Performance (COP), defined as the ratio of useful heat output to electrical input. COP values above 3.5 are typically required for economic viability, especially when integrated with district energy networks [2,20].
Multiple system configurations are possible depending on local conditions. These include the following:
  • Open-loop systems, which extract and discharge mine water (either to the surface or back into the mine),
  • Closed-loop systems, which use submerged heat exchangers and do not circulate mine water externally, and
  • Standing column systems, which combine extraction and reinjection at different depths within the same shaft.
Figure 2 is an overview of the main system types and their operational arrangements.

2.3. International Case Studies of MTES Systems

Several international pilot and commercial MTES systems provide valuable insights into the scalability, performance, and technical challenges of implementing MTES systems:
  • Springhill, Canada: Located in Nova Scotia, the Springhill Mine Water Geothermal Project is one of the earliest operational MTES systems. Developed in the 1980s, it uses mine water extracted from depths up to 1350 m, with temperatures reaching up to 26 °C, to provide heating and cooling for industrial and public facilities. The system operates using heat exchangers and a network of 11 heat pumps and has achieved up to 60% heating cost reduction for some users, while significantly lowering GHG emissions [6,7].
  • Heerlen, Netherlands: The Heerlen Minewater Project, launched in 2008, has evolved into an advanced fifth-generation district heating and cooling (5GDHC) system. It uses multiple extraction and reinjection wells to manage thermal flows between interconnected buildings and clusters. The system integrates renewable energy, smart thermal grid controls, and real-time balancing mechanisms to deliver more than 5 GWh of heating and cooling annually, achieving major efficiency gains and CO2 reductions [4,23,24].
  • Bochum, Germany: The Bochum HT-MTES system in the Markgraf II shaft is a high-temperature seasonal thermal storage project integrated with solar thermal collectors and a district heating network. Heat is injected into the mine water during summer and extracted in winter using a 500 kW high-temperature heat pump. The system delivers over 13 GWh of heating and cooling annually, and its bidirectional flow, stratified storage, and DTS monitoring represent best practices in advanced MTES design [15,25,26].
These case studies confirm the technical viability of MTES, the potential for integration with local renewable sources, and the need for careful system configuration to prevent thermal short-circuiting, manage water quality, and maintain long-term performance. The experiences from Springhill, Heerlen, and Bochum offer useful insights for evaluating MTES potential in post-mining communities like Glace Bay, Nova Scotia.

3. Materials and Methods

This section outlines the methodology used to evaluate the feasibility and performance of a Mine Thermal Energy Storage (MTES) system. The approach is structured to allow replication and adaptation for different geographical and geological contexts, with all relevant assumptions, formulas, and references based on standard geothermal engineering principles and existing literature.

3.1. Heating and Cooling Demand Estimation

Heating and cooling demands were calculated using Energy Use Intensity (EUI) values specific to Nova Scotia and adjusted for residential, commercial, and industrial sectors. The demand estimates focus on space heating and cooling, which are the primary loads addressable by MTES systems. EUI represents the total annual energy consumption per unit floor area (in GJ/m2/year) and includes all end uses such as heating, cooling, lighting, and appliances; therefore, sector-specific heating and cooling fractions are applied to isolate the portions relevant to thermal demand. Equations (1) and (2) are used to estimate annual thermal demand based on gross floor area and sector-specific heating and cooling fractions [27,28].
Q h e a t i n g G J y e a r = E U I G J m 2 y e a r × A m 2 × f h e a t i n g
Q c o o l i n g G J y e a r = EUI   G J m 2 y e a r × A m 2 × f c o o l i n g
where Q h e a t i n g   is the annual space heating demand, Q c o o l i n g is the annual space cooling demand f h e a t i n g is the fraction of total EUI allocated to space heating, and f c o o l i n g is the fraction of total EUI allocated to space cooling.

3.2. MTES Capacity Assessment

The thermal storage capacity is determined by calculating the heat stored in both mine water and surrounding rock using Equations (4) and (5) [29,30]. Key parameters include Mine water volume ( V w a t e r ), Rock-volume to water-volume ratio (R), Specific heat capacities of water and rock ( C w a t e r , C r o c k ), densities of water and rock ( ρ w a t e r ,   ρ r o c k ), and usable temperature change ( T ).
Q w a t e r = V w a t e r × ρ w a t e r × C w a t e r × T
Q r o c k = R × V w a t e r × ρ r o c k × C r o c k × T

3.3. Heat Retrieval System Design

As discussed in Section 2.2, two primary configurations can be employed for heat extraction—open- and closed-loop systems, each with distinct advantages and limitations depending on geological and operational conditions. In open-loop systems, mine water is pumped to the surface, passed through a heat exchanger, and reinjected into a separate section of the mine. This approach typically offers higher thermal efficiency due to direct water extraction, but it requires careful reinjection placement and water quality management to prevent fouling or corrosion. Closed-loop systems, in contrast, circulate a secondary heat transfer fluid (e.g., glycol or brine) through submerged or borehole heat exchangers without direct mine water contact. While generally simpler to operate and less sensitive to water quality, closed-loop systems often have lower heat transfer efficiency due to conduction limitations [9,20]. Table 1 summarizes the key comparative characteristics of these two configurations, based on prior studies [20,29]:
Therefore, selection between configurations depends on factors such as site-specific hydrogeological conditions, mine accessibility, water quality, operational and maintenance considerations, and the targeted thermal output [20]. For instance, open-loop systems are generally preferred where mine water levels are stable, hydraulic separation between wells can be ensured, and adequate water quality management is feasible. Closed-loop systems may be more suitable in sites with poor water quality, limited pumping capacity, or where minimizing subsurface disturbance is a priority [9,20].
Design factors such as flow rate ( V ˙ ), fluid density ( ρ ), specific heat capacity ( C ), and temperature difference (across the heat exchanger) ( T ) are used to calculate heat extraction potential via Equation (5), with the final heat delivered estimated using Equation (6) [2]. Where Q r e t r i e v e d , a n n u a l is Q r e t r i e v e d   × 8760   h / y e a r , and COP is the Coefficient of Performance of the heat pump.
Q r e t r i e v e d = V ˙ × ρ × C × T
Q d e l i v e r e d = Q r e t r i e v e d , a n n u a l × C O P
The thermal recharge of mine water from the surrounding rock is primarily governed by conductive heat transfer, with advection potentially accelerating the process depending on site hydrogeology. Modeling by [31] for a flooded coal mine under purely conductive conditions estimated that 25–45% of the injected heat could be recovered in the first operational year, with full recovery requiring multiple annual cycles. Similar seasonal trends have been reported in other mine-based TES assessments, where recharge is aligned with annual storage–extraction cycles (e.g., summer heat injection and winter extraction) to maintain long-term thermal balance [4,19]. These findings indicate that significant recharge can occur within months, but complete restoration of initial thermal conditions may take several years depending on rock thermal diffusivity, mine geometry, and hydraulic connectivity.

3.4. Electrical Energy Requirements

The annual energy demands for each subsystem are calculated as follows:
  • Pumping system: Based on flow rate ( Q ), pumping head overcome (frictional losses + elevation difference) ( H ), and pump efficiency ( η p u m p ), density of water ( ρ ), and acceleration due to gravity (9.81 m/s2) using [20].
    E p u m p , a n n u a l = ρ × g × Q × H × t η p u m p
  • Heat exchangers: Estimated using pressure drop and flow characteristics via Equation (8) [32,33]:
    E h x = ρ × g × Q × H h x × t η
    where H h x is the head loss across the heat-exchanger system.
  • Heat pumps: Evaluated using thermal energy output delivered by the heat pump ( Q H P ) and COP (from [29]):
    E H P = Q H P C O P
  • Auxiliary systems: Estimated as 1–2% of total system demand.
The total annual electrical energy requirement was computed as the sum of all components.

3.5. Cost Analysis and Economic Feasibility

Cost components are divided into the following:
  • CAPEX: Including well drilling, heat pump and exchanger installation, distribution infrastructure, and SCADA systems [19,20].
  • OPEX: Including labor, electricity, maintenance, and compliance [19].
The Levelized Cost of Heat (LCOH) was calculated using Equation (10), with the Capital Recovery Factor (CRF) derived from Equation (11) [34], where Q u s a b l e   h e a t is the total heat energy delivered annually, r is the discount rate, and n is the system lifespan (years). This metric facilitates economic comparison with conventional heating systems.
L C O H = C A P E X × C R F + O P E X Q u s a b l e   h e a t
C R F = r ( 1 + r ) n ( 1 + r ) n 1

4. Results

This section presents the outcomes of applying the MTES design framework to the selected site in Glace Bay, Nova Scotia. The calculations are based on the equations introduced in Section 3, with key technical assumptions drawn from site-specific data and relevant literature.

4.1. Heating and Cooling Demand Estimation in Glace Bay

The annual space heating and cooling demand in Glace Bay was estimated using floor area data and Energy Use Intensity (EUI) values for the residential, commercial, and industrial sectors, applying the methodology described in Equations (1) and (2). These equations use gross heated area and sector-specific heating and cooling fractions to isolate the portion of total energy consumption attributable to space conditioning.
For the residential sector, the total heated area was derived using the 2021 Census housing stock data for Glace Bay [35] and average unit sizes by dwelling type [36], resulting in approximately 1.4 million m2. An EUI of 0.58 GJ/m2/year was applied based on Nova Scotia-specific benchmarks [37], and space heating and cooling fractions of 65.5% and 0.6% were used, respectively.
The commercial and institutional sector was assessed using a conservative estimate of 10 m2 per capita, applied to a population of 17,000 [35], yielding a total area of 170,000 m2. An EUI of 1.12 GJ/m2/year was used, with 42.4% for heating and 8.9% for cooling [38].
For the industrial sector, it was assumed that 12 facilities are active in the region [39], each with an average heated area of 4000 m2, totaling 48,000 m2. The EUI used was 0.8 GJ/m2/year, with 60% allocated to heating and 5% to cooling [40].
The combined heating and cooling demand for all sectors in Glace Bay is approximately 185 GWh per year. The breakdown is provided in Table 2.
These demands reflect year-round space conditioning loads, with peak heating required in winter and cooling concentrated in the summer. This seasonality plays a key role in determining the required storage capacity and thermal cycling strategy of the MTES system.

4.2. Thermal Energy Storage Capacity in Glace Bay

This study evaluated the thermal energy storage (TES) capacity of two major flooded mines in Glace Bay: Colliery No. 2 and Colliery No. 9, both situated within the 1B Hydraulic System. The total theoretical thermal storage capacity was calculated based on the methodology described in Equations (3) and (4), which estimate the heat retained in both mine water and the surrounding rock mass.
According to historical mine data, Colliery No. 2 contains approximately 17.26 million m3 of flooded mine water, while Colliery No. 9 contains approximately 4.98 million m3 [14]. A rock-to-water volume ratio (R) of 3:1 was assumed based on typical mine structures and regional geological conditions. This ratio represents the volume of surrounding rock contributing to heat storage per unit volume of mine water and is critical in determining the role of the rock matrix in long-term thermal retention. Higher R values imply a larger thermal reservoir but may reduce heat transfer rates due to increased thermal resistance. The seasonal temperature differential (∆T) was assumed to be 12 °C, reflecting the operational temperature swing between heat injection and extraction phases during seasonal cycling. This assumption is consistent with the stable mine water temperatures recorded in Springhill, Nova Scotia (~18 °C year-round) and with typical seasonal ΔT ranges of 5–15 °C reported in comparable MTES and mine water heating systems [4,19], making it a representative value for scoping-level estimates in Glace Bay. This ∆T represents the usable range for thermal storage while maintaining system efficiency and material integrity.
The thermal properties used for calculations included ρ w a t e r = 1000 kg/m3, ρ r o c k = 2500 kg/m3, C w a t e r = 4.18 kJ/kg·°C, and C r o c k = 0.84 kJ/kg·°C, all consistent with literature values for comparable MTES systems [29,30]. These values are considered reasonable for scoping-level analysis; however, site-specific geological surveys are recommended to refine capacity estimates [30].
Based on this methodology, the total storage potential for Colliery No. 2 was estimated at 240.46 GWh in water and 362.41 GWh in rock, totaling 602.87 GWh. For Colliery No. 9, the calculated capacity was 69.4 GWh in water and 104.6 GWh in rock, totaling 174.0 GWh.
Assuming an overall system efficiency of 80% to account for losses from pumping, heat exchange, and thermal dissipation, the usable thermal energy output is estimated at 482.29 GWh for Colliery No. 2 and 139.20 GWh for Colliery No. 9. The combined usable capacity of 621.5 GWh significantly exceeds Glace Bay’s estimated annual thermal energy demand of approximately 185 GWh (see Section 4.1), supporting the feasibility of MTES as a long-duration seasonal storage system with additional capacity for future demand or district expansion.

4.3. Usable Thermal Energy Output in Glace Bay

The proposed MTES system for Glace Bay employs a centralized open-loop configuration, as discussed in Section 3.3, where the comparative assessment of open- and closed-loop systems indicated that open-loop designs are generally preferred in sites with stable mine water levels, adequate hydraulic separation, and feasible water quality management. In this case, mine water is drawn from three extraction wells at Colliery No. 2, circulating it through plate heat exchangers, and reinjecting it through two wells at Colliery No. 9. This design leverages the natural elevation difference (~43 m) and hydraulic separation between the collieries to optimize heat transfer and reduce the risk of thermal short-circuiting [41]. The system layout is based on best practices from established MTES projects in Springhill, Canada, and Heerlen, Netherlands [6,9,20].
A total flow rate of 150 L/s (0.15 m3/s), supported by three extraction wells at 50 L/s each, was selected based on hydrogeological assessments and performance benchmarks from comparable mine-water systems in Heerlen and the UK [4,9,20]. This range aligns with sustainable extraction rates (100–200 L/s) identified for Glace Bay based on historical mine dewatering records, including the Neville Street well [11]. To ensure efficient transport and minimize frictional losses, a 350–400 mm (14–16 inch) HDPE or steel main header is proposed. For individual branches from each well, 200–250 mm (8–10 inch) piping is recommended to accommodate the 50 L/s flow per line. Chemically resistant HDPE or steel is selected for distribution piping, while stainless steel is preferred for suction and internal pump station connections. End-suction centrifugal pumps housed in aboveground pump stations are proposed to provide reliable, high-volume water handling [42].
The retrievable heat from the system was calculated using Equation (5), assuming a flow rate ( V ˙ ) of 0.15 m3/s, a water density ( ρ ) of 1000 kg/m3, a specific heat capacity ( C ) of 4.18 kJ/kg·K, and a temperature differential ( T ) of 12 °C.
This results in a thermal power output of 7.52 MW. Over a year (8760 h), the annual thermal energy extracted is approximately 66 GWh. Applying a heat pump Coefficient of Performance (COP) of 4.0 in Equation (6), the total annual delivered thermal energy is 264 GWh/year. Here, the retrieved mine water heat (66 GWh/year) represents only the geothermal input, whereas the delivered heat (264 GWh/year) accounts for the heat pump’s amplification effect at COP of 4.0, including both the extracted heat and the additional heat generated from electrical input. This thermal output exceeds Glace Bay’s estimated annual heating and cooling demand (185 GWh/year) by approximately 43%, providing flexibility for system expansion, peak demand management, and seasonal cycling.
As illustrated in Figure 3, the system demonstrates resilience to variations in operating conditions. Even under suboptimal performance—such as a reduced T or COP—the annual thermal output remains sufficient to meet Glace Bay’s current demand. In warmer months, when heating demand is lower, the system can operate in a charging mode by injecting surplus heat, sourced from cooling systems or renewables like solar thermal, into the mine reservoir. This seasonal flexibility enhances overall efficiency and reliability, aligning the system with long-duration energy storage goals.

4.4. Electrical Energy Requirements in Glace Bay

The annual electrical energy requirement for operating the proposed MTES system in Glace Bay was estimated by evaluating the major subsystems: pumps, heat exchangers, heat pumps, and auxiliary equipment. These estimates are based on the design specifications, performance benchmarks from similar geothermal systems, and Equations (7)–(9) described earlier.
For pumping, a total flow rate of 150 L/s (0.15 m3/s), where three extraction wells each operate at 50 L/s, and a total dynamic head of 300 m were assumed. This value reflects the depth of Colliery No. 2 (261–263 m) and includes estimated frictional losses ranging from 10 to 100 m, consistent with hydrogeological assessments and historical dewatering records [43]. Only the extraction wells at Colliery No. 2 were considered in the pumping energy calculations, as reinjection at Colliery No. 9 occurs at a higher elevation and relies primarily on gravitational flow. Assuming a pump efficiency of 80%, the estimated annual pumping energy is approximately 4.83 GWh/year, in line with design standards for geothermal systems [33], as calculated using Equation (7). It is noted that the ratio of useful heat delivered to the community (264 GWh) to the pumping electricity consumption (4.83 GWh) is ≈55, indicating that pumping energy demand is relatively minor compared to the delivered thermal energy.
According to Equation (8), the heat exchanger power requirement was estimated based on a pressure drop of 4.5 m, as recommended by ASHRAE Standard 90.1-2013 [44], and an assumed efficiency of 80%. This results in a minor contribution of approximately 0.073 GWh/year to the total system demand.
For heat pumps, the system is designed to deliver 185 GWh/year of thermal energy demand to Glace Bay’s residential, commercial, and industrial users. Using a conservative Coefficient of Performance (COP) of 4—typical for modern water-source heat pumps under standard conditions [42]—and based on Equation (9), the annual electrical input required is 46.25 GWh/year.
Auxiliary systems, including SCADA, sensors, valves, and communication infrastructure, were estimated to account for 1.5% of the total electricity consumption of the other subsystems. This results in an additional 0.77 GWh/year, based on established benchmarks in geothermal plant design.
In total, the estimated annual electrical energy requirement for operating the MTES system in Glace Bay is approximately 52 GWh/year, including all major subsystems. This value serves as a critical input for cost evaluation, system optimization, and planning for renewable electricity integration, as discussed in subsequent sections.

4.5. Economic Feasibility and Cost Analysis in Glace Bay

A comprehensive economic feasibility analysis is essential for assessing the viability of implementing the MTES system in Glace Bay. This section evaluates both Capital Expenditures (CAPEX) and Operational Expenditures (OPEX), providing a detailed breakdown of system components and ongoing operational costs. To contextualize MTES within the local energy landscape, cost comparisons are also made with conventional oil-based heating and individual residential heat pump systems. All cost estimates, including CAPEX, OPEX, and Levelized Cost of Heat (LCOH), are presented, exclusive of taxes, to maintain consistency across alternatives. This approach reflects standard industry practice in early-stage feasibility studies, where taxes often depend on ownership structure and funding mechanisms.

4.5.1. Capital Expenditure (CAPEX)

The estimated capital costs for the proposed MTES system include major infrastructure components such as geothermal wells, heat pumps, heat exchangers, piping networks, and SCADA systems. Cost values were drawn from established benchmarks.
The five-well configuration—comprising three extraction wells at Colliery No. 2 and two reinjection wells at Colliery No. 9—is based on international practice (e.g., the Heerlen Minewater Project [4,9]) and local geological conditions. Drilling costs range from $49 to $131 per meter, depending on well depth and casing requirements [45,46], with additional costs for 72 h pump testing [47], estimated at approximately $8300 USD per well [48].
The heat pump system is designed to deliver 185 GWh/year of thermal energy with a Coefficient of Performance (COP) of 4, corresponding to a required capacity of 23.6 MW. Installation costs are estimated at $1200–$2200 per kW based on current market [49,50]. Heat exchanger costs are estimated at $100–$300 per kW, reflecting similar large-scale systems [51].
Piping and distribution infrastructure costs are based on a 107 km dual-pipe network, with installed unit costs ranging from $800 to $1200 per meter [52,53], inclusive of trenching, insulation, and site restoration. The SCADA and control system is estimated to cost between $150,000 and $500,000, depending on system configuration and integration complexity [54,55]. Table 3 summarizes the total estimated capital cost.
When converted to Canadian dollars, the estimated total CAPEX range is between $172 million and $280 million. Unless otherwise indicated, all dollar values are in Canadian dollars and converted from USD to CAD using a June 2025 exchange rate of 1 USD = 1.36 CAD.

4.5.2. Operational and Maintenance Costs (OPEX)

Annual operating costs include labor, electricity, and maintenance. Labor costs were based on a staff of 5–6 with total wages of $570,000 to $660,000/year [56]. Electricity costs are derived from Nova Scotia Power’s 2024 Large Industrial Tariff [57], with 52 GWh/year consumption at $0.10184/kWh and demand charges for 2.6 MW (2600 kVA) of peak load, totaling approximately $5.8 million/year.
An industry benchmark of 1% of total capital expenditure is commonly used to estimate annual maintenance costs, ranging from $1.7 to $2.7 million per year.
Table 4 summarizes the estimated annual OPEX.

4.5.3. Levelized Cost of Heat for the Glace Bay MTES System

The Levelized Cost of Heat (LCOH) was calculated over a 25-year system lifespan using a 5% discount rate. The annual thermal energy output is estimated at 264 GWh (950,400 GJ). Based on Equation (10) and a Capital Recovery Factor (CRF) of 0.07 derived from Equation (11), the LCOH results are between about $21.59/GJ and $30.74/GJ.
This LCOH range serves as a benchmark for assessing the economic viability of MTES and its alignment with provincial energy policy objectives.

4.5.4. Comparative Cost of Traditional Heating Options in Glace Bay

To evaluate the cost competitiveness of the MTES system, its LCOH is compared to two conventional heating options commonly used in Glace Bay:
  • Oil Heating Systems: Based on a price of $1.63/L and furnace efficiency of 85% [58,59], the usable energy is 31.21 MJ/L. The resulting cost per GJ is $52.23/GJ.
  • Residential Heat Pumps: Using Equations (10) and (11), assuming a thermal demand of 72 GJ/year per household, a 20-year system lifespan, and a 5% discount rate, the LCOH was calculated based on a CAPEX of $12,000–$20,000 [60] and an annual OPEX of approximately $1440 [61,62]. OPEX includes electricity and maintenance: With a seasonal COP of 3.0, each household requires about 6.67 MWh/year (24 GJ) of electricity, costing ~$1239/year at the 2025 Nova Scotia rate of $0.18561/kWh [61]. Annual maintenance is assumed at $200 [62]. The resulting LCOH is between about $33.33/GJ and $42.22/GJ.

5. Discussion

This section provides an integrated assessment of the environmental, economic, and technical implications of implementing a Mine Thermal Energy Storage (MTES) system in Glace Bay, Nova Scotia. Drawing from the detailed site-specific findings in Section 4 and broader renewable energy strategies, the discussion explores the potential benefits, challenges, and future pathways for MTES deployment in post-industrial communities.

5.1. Economic Feasibility and Cost Savings

As established in Section 4.5, the Levelized Cost of Heat (LCOH) for Glace Bay’s MTES system ranges from $21.59 to $30.74/GJ, compared to $52.23/GJ for oil heating and $33.33 to $42.22/GJ for individual residential heat pumps. This represents a 42–59% cost reduction compared to oil and 8–49% savings relative to decentralized heat pumps. International precedents further support this economic advantage. For instance, in Heerlen, the involvement of local energy companies offering financing at relatively low interest rates (6–8%) enabled the delivery of competitively priced thermal energy [63].
The reuse of existing mine voids significantly reduces capital expenditure by eliminating the need for new underground infrastructure. As a locally controlled energy solution, MTES also enhances energy security and protects communities from global fuel price volatility.

5.2. Environmental Benefits and Emissions Reduction

Transitioning from oil-based heating to MTES offers significant environmental benefits, particularly in reducing greenhouse gas (GHG) emissions and supporting Nova Scotia’s net-zero targets. Furnace oil currently supplies approximately 30% of space heating in Nova Scotia, especially in colder regions like Cape Breton [64]. MTES provides a low-carbon alternative by replacing fossil fuel combustion with mine-sourced geothermal energy, further enhanced using centralized district heating powered by renewable electricity.
Case studies demonstrate the emissions reduction potential of MTES systems. In Springhill, Nova Scotia, the adoption of mine water geothermal technology reduced GHG emissions by approximately 370 tonnes per year, representing a 50% decrease compared to conventional oil-based systems [7]. Similarly, the Heerlen Minewater 2.0 project in the Netherlands achieved a 65% reduction in emissions across over 500,000 m2 of conditioned space [4].
In the context of Glace Bay, emissions reductions were quantified by comparing current oil-based heating with projected MTES system performance:
Current emissions from oil heating: Based on the residential heating and cooling demand of 150 GWh/year (540,000 GJ) and an emission factor of 71.35 kg CO2e/GJ [65,66], the estimated annual GHG emissions are approximately 38,530 tonnes CO2e.
Emissions from MTES system: Assuming an annual electricity use of 52 GWh (Section 4.4) and Nova Scotia’s grid intensity of 660 g CO2e/kWh [67], the estimated emissions total 34,320 t CO2e/year. With a projected 50% renewable electricity share, this value decreases to 17,160 t CO2e/year, equivalent to a 55% reduction. Under full grid decarbonization, emissions from MTES could approach zero.
These findings reinforce the environmental value of MTES systems and demonstrate their capacity to support regional and national decarbonization efforts through large-scale emissions reductions in the heating sector.

5.3. Infrastructure Reuse and Grid Optimization

MTES enhances grid reliability by converting surplus renewable electricity into thermal energy, which can be stored and used during peak demand. This reduces dependence on carbon-intensive backup power and supports Nova Scotia’s low-carbon transition.
With over 1000 abandoned mine sites and strong wind energy capacity, Nova Scotia is well positioned to repurpose underground infrastructure as thermal reservoirs, avoiding the costs and environmental impacts of new storage development [68]. Coordinating mine remediation with MTES deployment can further reduce project costs and accelerate regional revitalization.
The Heerlen Minewater Project in the Netherlands demonstrates this potential, having transformed coal mine shafts into a district-scale energy system that provides heating, cooling, and thermal storage [4,63].

5.4. Job Creation and Regional Development

Deploying MTES in Nova Scotia offers a pathway for economic revitalization, especially in post-industrial areas like Glace Bay. By repurposing abandoned mine infrastructure, these projects generate local employment across engineering, hydrogeology, drilling, and district energy construction [69].
In Springhill, mine water heating reduced municipal energy costs and supported job creation [6,69]. Similarly, the Gateshead project in the UK demonstrates how MTES can attract investment and stimulate skilled employment while lowering fossil fuel reliance [70].
MTES also fosters energy self-sufficiency in rural and Indigenous communities by offering a scalable, low-carbon heating solution that reduces energy poverty and keeps energy spending local.

5.5. Technical Challenges and Limitations

Successful MTES implementation in Glace Bay requires addressing site-specific technical and geochemical risks. The 1B Hydraulic System contains pyrite-rich formations, leading to acid mine drainage (AMD), which causes corrosion, scaling, and ochre formation that can foul heat exchangers and reduce efficiency [6,11,20]. Mitigation includes corrosion-resistant materials, filtration, chemical dosing, and regular water quality monitoring.
Another key risk is thermal short-circuiting between Collieries No. 2 and No. 9, which are only 43 m apart. This proximity may result in reinjected water prematurely returning to extraction wells. Hydrogeological modeling, tracer testing, and optimized well spacing are essential to ensure efficient thermal exchange [4,20,41].
Environmental and geotechnical risks include potential contamination of surface and groundwater, thermal disruption of aquifers, and release of hazardous gases like methane during drilling. Changes in subsurface pressure could also destabilize old mine voids, particularly in undocumented or shallow areas [14,19,20]. International examples, such as Dawdon (UK) and Heerlen (Netherlands), demonstrate that these challenges can be managed with real-time monitoring, adaptive design, and robust site characterization [4,20].

5.6. Integration with Renewable Energy

MTES systems function best when integrated with renewable energy sources. Nova Scotia’s legislated targets, 80% renewable electricity and 5 GW offshore wind capacity by 2030, create strong alignment opportunities [67]. MTES can absorb surplus power from intermittent sources and convert it into storable thermal energy, enhancing grid flexibility and seasonal energy balancing.
According to Nova Scotia Power’s 2023 Integrated Resource Plan, projected wind and solar curtailment will reach 351 GWh/year by 2025 and 2175 GWh/year by 2030, highlighting the need for flexible storage systems like MTES [71] (Figure 4).
Key renewable energy pathways for MTES integration in Glace Bay include
  • Onshore Wind: The Lingan Wind Farm near the Sydney coalfield generates 36–49 GWh/year [72], which could meet 37–50% of Glace Bay’s estimated 52 GWh/year MTES electricity demand (Section 3.4). However, grid commitments may limit dedicated supply, making further wind expansion essential.
  • Offshore Wind: The Sydney Bight area has been identified as a key zone for offshore wind development. The 5 GW goal by 2030 could power over 3.7 million households [73]. Aligning MTES with future offshore capacity would ensure high-COP heat pump operation and utilize forecasted surpluses exceeding 2000 GWh/year [71].
  • Solar Thermal: Seasonal solar thermal integration can further enhance MTES. During low demand months, surplus summer heat can be stored and recovered in winter. The Bochum project in Germany demonstrates how mine voids can serve as seasonal heat reservoirs charged by solar thermal [8]. Similar applications in Glace Bay, especially at institutional buildings like schools and hospitals, could reduce electric load and improve system efficiency year-round. In addition, solar photovoltaic (PV) could be used to power MTES components such as pumps and control systems.

5.7. Overall Summary

This study explored the technical, economic, and environmental feasibility of the implementing a Mine Thermal Energy Storage (MTES) system in Glace Bay, Nova Scotia, using flooded mine workings from Collieries No. 2 and No. 9 as underground thermal reservoirs. The results confirm that MTES is a viable and scalable solution for decarbonizing district-scale heating in post-industrial communities, while simultaneously repurposing legacy infrastructure and enhancing local energy resilience.
Technically, the estimated total thermal storage capacity of 621 GWh far exceeds Glace Bay’s combined annual heating and cooling demand of approximately 185 GWh, demonstrating strong potential for long-term seasonal storage. The system’s modeled output of 264 GWh/year, supported by high-efficiency heat pumps and a centralized open-loop configuration, confirms the technical capability to meet current and future energy needs. With an annual electricity demand of 52 GWh, the MTES systems can be effectively integrated with intermittent renewables, absorbing excess generation and supporting grid balancing.
Economically, the system offers a competitive Levelized Cost of Heat (LCOH) ranging from $21.59 to $30.74/GJ, resulting in up to 59% savings compared to oil-based heating and up to 49% relative to individual heat pumps.
Environmentally, switching to MTES could reduce residential heating emissions by 21,000 to 38,500 tonnes CO2e annually, depending on the renewable share of Nova Scotia’s electricity grid, thereby supporting the province’s 2030 climate targets and long-term decarbonization.

6. Conclusions and Outlook

This study confirms that Mine Thermal Energy Storage (MTES) is technically, economically, and environmentally feasible option for Glace Bay, Nova Scotia. The key findings are as follows:
  • MTES has strong potential to meet community-scale heating and cooling needs through the reuse of legacy mine infrastructure.
  • The system demonstrates compatibility with renewable energy integration, enhancing energy resilience.
  • MTES offers significant cost savings over conventional heating options.
  • MTES has the potential to substantially reduce emissions, directly supporting Nova Scotia’s climate targets.
Future work should prioritize:
  • Pilot-scale demonstration in Glace Bay to validate the system design.
  • Comprehensive hydrogeological modeling and corrosion risk management.
  • Integration with renewable energy sources (wind, solar, and waste heat).
  • Development of supportive policies, funding mechanisms, and regional collaboration to enable broader deployment.
Advancing MTES technologies enables Nova Scotia to emerge as a leader in sustainable heating innovation, while revitalizing post-industrial communities and supporting a resilient, low-carbon energy transition.

Author Contributions

Conceptualization, S.S. and L.H.; methodology, S.S.; validation, S.S. and L.H.; formal analysis, S.S.; investigation, S.S.; resources, L.H.; data curation, S.S.; writing—original draft preparation, S.S.; writing—review and editing, S.S. and L.H.; visualization, S.S.; supervision, L.H.; project administration, S.S. All authors have read and agreed to the published version of the manuscript.

Funding

This research received no external funding.

Data Availability Statement

Data sharing not applicable. No new data were created or analyzed in this study. All sources are publicly available and properly cited within the manuscript.

Acknowledgments

The authors gratefully acknowledge the Nova Scotia Department of Energy (Energy Resource Development Branch), particularly Trevor Kelly, for his support and provision of resources on Nova Scotia’s mines.

Conflicts of Interest

The authors declare no conflicts of interest.

Abbreviations

The following abbreviations are used in this manuscript:
CAPEXCapital Expenditure
CO2eCarbon Dioxide Equivalent
COPCoefficient of Performance
GJGigajoule
GWhGigawatt-hour
LCOHLevelized Cost of Heat
MTESMine Thermal Energy Storage
OPEXOperational Expenditure
$Canadian dollars

References

  1. Dinçer, İ.; Rosen, M.A. Thermal Energy Storage: Systems and Applications; John Wiley & Sons: Hoboken, NJ, USA, 2010. [Google Scholar]
  2. Banks, D. An Introduction to Thermogeology: Ground Source Heating and Cooling; John Wiley & Sons: Hoboken, NJ, USA, 2012. [Google Scholar]
  3. Bloemendal, M. 20 Million EU Grant for Research Underground Heat Storage. Available online: https://www.tudelft.nl/en/2022/citg/20-million-eu-grant-for-research-underground-heat-storage (accessed on 2 March 2025).
  4. Verhoeven, R.; Willems, E.; Harcouët-Menou, V.; Boever, E.D.; Hiddes, L.; Veld, P.O.; Demollin, E. Minewater 2.0 project in Heerlen the Netherlands: Transformation of a geothermal mine water pilot project into a full scale hybrid sustainable energy infrastructure for heating and cooling. In Proceedings of the 8th International Renewable Energy Storage Conference and Exhibition, IRES 2013, Berlin, Germany, 18–20 November 2013. [Google Scholar]
  5. Geospatial Research Limited. Mine-Water Heat. Geospatial Research Limited. Available online: https://geospatial-research.com/mine-water-heat (accessed on 20 January 2025).
  6. Jessop, A.M. Geothermal Energy from Old Mines at Springhill, Nova Scotia, Canada. In Proceedings of the World Geothermal Congress Proceedings, Calrgary, AB, Canada, 18–31 May 1995; Available online: https://literature.wolkersdorfer.info/literature/Geothermal%20Energy%20from%20Old%20Mines%20at%20Springhill%20Nova%20Scotia%20Canada.pdf (accessed on 5 January 2025).
  7. Jessop, A.M.; Macdonald, J.K.; Roward, S. Clean Energy from Abandoned Mines at Springhill, Nova Scotia. Energy Sources 1995, 17, 93–106. [Google Scholar] [CrossRef]
  8. Hahn, F.; Jagert, F.; Bussmann, G.; Nardini, I.; Bracke, R.; Seidel, T.; König, T. The reuse of the former Markgraf II colliery as a mine thermal energy storage. In Proceedings of the European Geothermal Congress 2019, Den Haag, The Netherlands, 11–14 June 2019. [Google Scholar]
  9. Banks, D.; Athresh, A.; Al-Habaibeh, A.; Burnside, N. Water from abandoned mines as a heat source: Practical experiences of open- and closed-loop strategies, United Kingdom. Sustain. Water Resour. Manag. 2019, 5, 29–50. [Google Scholar] [CrossRef]
  10. Nova Scotia Department of Natural Resources and Renewables. Nova Scotia’s 2030 Clean Power Plan; Government of Nova Scotia: Sherbrooke, QC, Canada, 2023. [Google Scholar]
  11. Shea, J. The 1B Hydraulic System. In Proceedings of the MEND Manitoba Workshop Changes in Acidic Drainage for Operating, Closed or Abandoned Mines, Winnipeg, MB, Canada, 4–5 June 2008. [Google Scholar]
  12. Boehner, R.C.; Giles, P.S. Geology of the Sydney Basin, Cape Breton and Victoria Counties, Cape Breton Island, Nova scotia; Nova Scotia Natural Resources: Halifax, NS, Canada, 2008. [Google Scholar]
  13. Baechler, F.E. Regional Water Resources Sydney Coalfield, Nova Scotia. Province of Nova Scotia; Department of the Environment: Halifax, NS, Canada, 1986.
  14. Shea, J. Mine Water Management of Flooded Coal Mines in the Sydney Coal Field, Nova scotia, Canada. In Proceedings of the International Mine Water Conference, Pretoria, South Africa, 19–23 October 2009. [Google Scholar]
  15. Kallesøe, A.J.; Vangkilde-Pedersen; Nielsen, J.E.; Sørensen, P.A.; Bakema, G.; Drijver, B.; Pittens, B.; Buik, N.; Egermann, P.; Rey, C.; et al. Underground Thermal Energy Storage (UTES)—State-of-the-Art, Example Cases and Lessons Learned; HEATSTORE Project Report, Geothermica—Era Net Cofund Geothermal: The Hague, The Netherlands, 2019. Available online: https://pub.geus.dk/en/publications/underground-thermal-energy-storage-utes-state-of-the-art-example- (accessed on 10 February 2025).
  16. Lee, K.S. Underground Thermal Energy Storage; Part of the Book Series: Green Energy and Technology; Springer: Berlin/Heidelberg, Germany, 2013. [Google Scholar]
  17. HEATSTORE. Roadmap for Flexible Energy Systems with Underground Thermal Energy Storage Towards 2050. HEATSTORE 2021, Geothermica—Era Net Cofund Geothermal. 2021. Available online: https://www.scribd.com/document/563158468/Heatstore-roadmap-2050 (accessed on 8 March 2025).
  18. Lee, K.S. Cavern Thermal Energy Storage Systems. In Underground Thermal Energy Storage; Part of the Book Series: Green Energy and Technology; Springer: Berlin/Heidelberg, Germany, 2013; pp. 125–129. Available online: https://link.springer.com/chapter/10.1007/978-1-4471-4273-7_6 (accessed on 15 January 2025).
  19. Preene, M.; Younger, P. Can you take the heat?—Geothermal energy in mining. Min. Technol. 2014, 123, 107–118. [Google Scholar] [CrossRef]
  20. Walls, D.B.; Banks, D.; Boyce, A.J.; Burnside, N.M. A Review of the Performance of Minewater Heating and Cooling Systems. Energies 2021, 19, 6215. [Google Scholar] [CrossRef]
  21. West Virginia University. Geothermal Energy on Abandoned Mine Lands. Available online: https://scitechpolicy.wvu.edu/science-and-technology-notes-articles/2024/01/08/geothermal-energy-in-abandoned-mine-lands (accessed on 9 January 2025).
  22. Yousef. 12 Different Types of Heat Exchangers & Their Application. Available online: https://www.theengineerspost.com/types-of-heat-exchanger/ (accessed on 11 April 2025).
  23. Banks, D. Integration of Cooling into Mine Water Heat Pump Systems; School of Engineering Glasgow University: Glasgow, UK, 2017. [Google Scholar]
  24. European Commission. Case Study—The Use of Mine Water in District Heating Systems—An Example from Heerlen, Netherlands; European Commission: Luxembourg, 2024. [Google Scholar]
  25. Verhoeven, R.; Hahn, F. Mine Thermal Energy Storage (MTES). In Proceedings of the 2nd European Underground Energy Storage Workshop. Fraunhofer Institution for Energy Infrastructures and Geothermal IEG, Paris, France, 24 May 2023; Available online: https://www.energnet.eu/wp-content/uploads/2023/06/0406_Rene-Verhoeven_Mine-Thermal-Energy-Storage-MTES.pdf (accessed on 20 February 2025).
  26. Passamonti, A.; Hahn, F.; Strozyk, F.; Bombarda, P.; Bracke, R. Development of a pilot site for high temperature heat pumps, with high temperature mine thermal energy storage as heat source. In Proceedings of the European Geothermal Congress 2022, Berlin, Germany, 17–21 October 2022. [Google Scholar]
  27. Loo, W.B. EUI Calculator—Energy Use Intensity. 2024. Available online: https://www.omnicalculator.com/everyday-life/eui (accessed on 2 May 2025).
  28. Anderson, K. What Is Energy Use Intensity (EUI)? 2024. Available online: https://greenly.earth/en-gb/blog/company-guide/what-is-energy-use-intensity-eui (accessed on 7 May 2025).
  29. Al-Habaibeh, A.; Athresh, A.P.; Parker, K. Performance analysis of using mine water from an abandoned coal mine for heating of buildings using an open loop based single shaft GSHP system. Appl. Energy 2018, 211, 393–402. [Google Scholar] [CrossRef]
  30. The Engineering ToolBox. Storing Thermal Heat. 2025. Available online: https://www.engineeringtoolbox.com/sensible-heat-storage-d_1217.html (accessed on 20 May 2025).
  31. Silva, J.P.; McDermott, C.; Fraser-Harris, A. The Value of a Hole in Coal: Assessment of Seasonal Thermal Energy Storage and Recovery in Flooded Coal Mines. Earth Sci. Syst. Soc. 2022, 2, 10044. [Google Scholar] [CrossRef]
  32. Corrosionpedia. Head Loss. 2024. Available online: https://www.corrosionpedia.com/definition/625/head-loss (accessed on 8 April 2025).
  33. ASHRAE. Principles of Heating, Ventilating, and Air Conditioning, 9th ed.; ASHRAE: Peachtree Corners, GA, USA, 2021. [Google Scholar]
  34. Short, W.; Packey, D.J.; Holt, T. A Manual for the Economic Evaluation of Energy Efficiency and Renewable Energy Technologies; National Renewable Energy Laboratory (NREL): Golden, CO, USA, 1995. [Google Scholar]
  35. Statistics Canada. Census Profile, 2021 Census of Population for Glace Bay. 2021. Available online: https://www12.statcan.gc.ca/census-recensement/2021/dp-pd/prof/details/page.cfm?Lang=E&DGUIDlist=2021S05100318&GENDERlist=1,2,3&STATISTIClist=1,4&HEADERlist=0 (accessed on 9 March 2025).
  36. Natural Resources Canada. Table 2.5—Average Dwelling Size by Dwelling Type (m2). 2015. Available online: https://oee.nrcan.gc.ca/corporate/statistics/neud/dpa/showTable.cfm?juris=CA&page=1&rn=9&sector=AAA&type=SHCMA&year=2015 (accessed on 10 March 2025).
  37. Natural Resources Canada. Residential Sector, Nova Scotia, Table 2: Secondary Energy Use and GHG Emissions by End-Use. 2021. Available online: https://oee.nrcan.gc.ca/corporate/statistics/neud/dpa/showTable.cfm?juris=ns&page=0&rn=2&sector=res&type=CP&year=2021 (accessed on 10 March 2025).
  38. Natural Resources Canada. Commercial/Institutional Sector—Atlantic- Secondary Energy Use and GHG Emission. 2021. Available online: https://oee.nrcan.gc.ca/corporate/statistics/neud/dpa/showTable.cfm?type=CP&sector=com&juris=atl&year=2022&rn=2&page=0 (accessed on 11 March 2025).
  39. Dun & Bradstreet. Manufacturing Companies in Glace Bay, Nova Scotia, Canada. Dun & Bradstreet Business Directory. 2024. Available online: https://www.dnb.com/business-directory/company-information.manufacturing.ca.nova_scotia.glace_bay.html (accessed on 19 May 2025).
  40. Energy Star. Canadian Energy Use Intensity by Property Type. Canadian National Median Values. 2023. Available online: https://portfoliomanager.energystar.gov/pdf/reference/Canadian%20National%20Median%20Table.pdf (accessed on 12 May 2025).
  41. MacSween, J.; Raman, C.; Kaliaperumal, R.; Oaks, K.; Mkandawire, M. Modeling Potential Impact of Geothermal Energy Extraction from the 1B Hydraulic System of the Sydney coalfield, Nova Scotia. In Reliable Mine Water Technology; International Mine Water Association (IMWA): Golden, CO, USA, 2013. [Google Scholar]
  42. IEA-ETSAP; IRENA. Heat Pumps-Technology Brief; International Energy Agency (IEA): Paris, France, 2013. [Google Scholar]
  43. Ellerbrok, G.W. The Louis Frost Notes 1685 to 1962, Dominion No. 2 Colliery. Available online: https://www.mininghistory.ns.ca/lfrost/lfdn2.htm (accessed on 22 March 2025).
  44. Hall, N. Water Side Economizers Part 9: Heat Exchanger Pressure Drop. Available online: https://www.deppmann.com/blog/monday-morning-minutes/water-side-economizers-part-9-heat-exchanger-pressure-drop/ (accessed on 3 May 2025).
  45. Robbins, H. Cost to Drill a Well [Pricing Per Foot & Cost by State]. Available online: https://upgradedhome.com/cost-to-drill-a-well/ (accessed on 12 May 2025).
  46. Grupa, T. Well Drilling Cost. Available online: https://homeguide.com/costs/well-drilling-cost (accessed on 25 May 2025).
  47. Government of British Columbia. Guide to Conducting Pumping Tests. 2020. Available online: https://www2.gov.bc.ca/assets/gov/environment/air-land-water/water/water-wells/guide_to_conducting_pumping_tests.pdf (accessed on 27 April 2025).
  48. Thompson Pump & Irrigation. Domestic Well Testing: Flow & Purity Tests. Thompson Pump & Irrigation. Available online: https://www.thompsonpumpandirrigation.com/home/eu2jc7l28psicdnz9ljyf149cwdy3z-g4lw6-jalmh-485xg-s7ja2 (accessed on 10 May 2025).
  49. Dunsky Energy Consulting. The Economic Value of Ground Source Heat Pumps for Building Sector Decarbonization-Review of a Recent Analysis Estimating the Costs of Electrification in Canada; Heating, Refrigeration and Air Conditioning Institute of Canada (HRAI): Mississauga, ON, Canada, 2020. [Google Scholar]
  50. Noel, S. Geothermal Heat Pump Cost. Available online: https://homeguide.com/costs/geothermal-heat-pump-cost (accessed on 12 May 2025).
  51. Thunder Said Energy. Waste Heat Recovery: Heat Exchanger Costs? Available online: https://thundersaidenergy.com/downloads/waste-heat-recovery-the-economics/ (accessed on 8 March 2025).
  52. Nussbaumer, T.; Thalmann, S. Influence of system design on heat distribution costs in district heating. Energy 2016, 101, 496–505. [Google Scholar] [CrossRef]
  53. nPro Energy. Economic Calculation for Districts with Heat Network. Available online: https://www.npro.energy/main/en/help/economic-calculation (accessed on 1 March 2025).
  54. Erickson, A. What Price Should You Expect for SCADA Systems and Maintenance? Available online: https://www.dpstele.com/blog/scada-price-maintenance-cost.php (accessed on 17 May 2025).
  55. Antal, C.; Maghiar, T. Automatic Control and Data Acquisition (SCADA) for Geothermal Systems. In European Summer School on Geothermal Energy Applications; International Geothermal Association (IGA): Bochum, Germany, 2001. [Google Scholar]
  56. Job Bank. Wages in Nova Scotia. Available online: https://www.jobbank.gc.ca/wagereport/location/ns (accessed on 18 May 2025).
  57. NS Power. Tariff 2024. Nova Scotia Power. 2024. Available online: https://www.nspower.ca/docs/default-source/regulatory/nova-scotia-power-tariffs-2024-10.pdf (accessed on 5 May 2025).
  58. Natural Resources Canada. Weekly Average Retail Prices for Furnace Oil in 2025. Available online: https://www2.nrcan.gc.ca/eneene/sources/pripri/prices_bycity_e.cfm?productID=7&locationID=39&locationID=40&frequency=W&priceYear=2025&Redisplay= (accessed on 28 April 2025).
  59. Canada Energy Regulator. Energy Conversion Tables. Available online: https://apps.cer-rec.gc.ca/Conversion/conversion-tables.aspx?GoCTemplateCulture=en-CA#2-2 (accessed on 14 April 2025).
  60. Bernath, S. Heat Pump Price Guide: How Much You’ll Pay for a New Heat Pump Installed in Canada. Available online: https://www.furnaceprices.ca/heat-pumps/heat-pump-prices/ (accessed on 18 May 2025).
  61. NS Power. Changes to Power Rates. Available online: https://www.nspower.ca/about-us/regulations/changes-to-power-rates (accessed on 25 February 2025).
  62. Airtek. What’s The Average Heat Pump Maintenance Cost in Canada? Available online: https://airtekshop.com/blogs/all/average-heat-pump-maintenance-cost-in-canada/ (accessed on 16 May 2025).
  63. Roijen, E.; ‘t Veld, P.O. The Minewaterproject Heerlen—Low exergy heating and cooling in practice. In Proceedings of the PALENC AIVC 2007, Crete Island, Crete, Greece, 27–29 September 2007. [Google Scholar]
  64. Natural Resources Canada. Residential Sector, Nova Scotia, Table 21: Heating System Stock by Building Type and Heating System Type. Available online: https://oee.nrcan.gc.ca/corporate/statistics/neud/dpa/showTable.cfm?type=CP&sector=res&juris=ns&year=2022&rn=21&page=0 (accessed on 13 March 2025).
  65. ECCC. National Inventory Report 1990–2021: Greenhouse Gas Sources and Sinks in Canada; Environment and Climate Change: Canada, QC, Canada, 2023. [Google Scholar]
  66. IPCC. Climate Change 2013: The Physical Science Basis. Contribution of Working Group I to the Fifth Assessment Report of the Intergovernmental Panel on Climate Change; Intergovernmental Panel on Climate Change (IPCC): Geneva, Switzerland, 2013. [Google Scholar]
  67. Canada Energy Regulator. Provincial and Territorial Energy Profiles—Nova Scotia. Available online: https://www.cer-rec.gc.ca/en/data-analysis/energy-markets/provincial-territorial-energy-profiles/provincial-territorial-energy-profiles-nova-scotia.html (accessed on 25 February 2025).
  68. Hennick, E.W. Remediation of Abandoned Mine Openings, April 2020 to March 2021; Nova Scotia Department of Natural Resources and Renewables: St. Peter’s, NS, Canada, 2021. [Google Scholar]
  69. Louie, E.P. Writing a Community Guidebook for Evaluating Low-Grade Geothermal Energy from Flooded Underground Mines for Heating and Cooling Buildings. Master’s Thesis, Michigan Technological University, Houghton, MI, USA, 2015. [Google Scholar]
  70. Coal Authority. Gateshead District Energy Scheme; Coal Authority: Mansfield, UK, 2023. [Google Scholar]
  71. NS Power. NS Power’s 2022/23 Evergreen IRP Modeling Results; Nova Scotia Power: Halifax, NS, Canada, 2023. [Google Scholar]
  72. Membertou Geomatics Consultants. Lingan 10 MW Wind Farm Project Mi’kmaq Ecological Knowledge Study; Government of Nova Scotia: Sherbrooke, NS, Canada, 2009. [Google Scholar]
  73. NSNRR. Nova Scotia Offshore Wind Roadmap; The Nova Scotia Department of Natural Resources and Renewables: St. Peter’s, NS, Canada, 2023. [Google Scholar]
Figure 1. Annual Trend in Publications Related to MTES, Based on Google Scholar Search Results.
Figure 1. Annual Trend in Publications Related to MTES, Based on Google Scholar Search Results.
Energies 18 04780 g001
Figure 2. Different Types of Heat Extraction from/Rejection to Abandoned Flooded Mines: (a) Open loop with disposal of water to surface recipient; (b) Open loop with reinjection; (c) Closed loop in flooded shaft; (d) Closed loop in surface mine water treatment pond; (e) Standing column with bleed and recirculation in shaft; (f) Standing column configuration, with large natural flow up shaft [9,20].
Figure 2. Different Types of Heat Extraction from/Rejection to Abandoned Flooded Mines: (a) Open loop with disposal of water to surface recipient; (b) Open loop with reinjection; (c) Closed loop in flooded shaft; (d) Closed loop in surface mine water treatment pond; (e) Standing column with bleed and recirculation in shaft; (f) Standing column configuration, with large natural flow up shaft [9,20].
Energies 18 04780 g002
Figure 3. Annual Heat Delivered vs. Temperature Differential (ΔT) and COP.
Figure 3. Annual Heat Delivered vs. Temperature Differential (ΔT) and COP.
Energies 18 04780 g003
Figure 4. Projected Wind and Solar Curtailment in Nova Scotia (2025–2050) CE1-E1-R1 Scenario [71].
Figure 4. Projected Wind and Solar Curtailment in Nova Scotia (2025–2050) CE1-E1-R1 Scenario [71].
Energies 18 04780 g004
Table 1. Comparison of Open-Loop and Closed-Loop Heat Retrieval.
Table 1. Comparison of Open-Loop and Closed-Loop Heat Retrieval.
ParameterOpen-Loop SystemClosed-Loop System
EfficiencyHigher (direct water extraction)Lower (indirect conduction)
Heat LossLower, but requires careful reinjection placementHigher due to conduction limitations
Water Quality ImpactRequires filtration/treatmentNo direct water contact
System ComplexityMore complex (extraction pumps, reinjection wells)Simpler, fewer moving parts
Common ApplicationsDistrict heating, industrial energy useSmall-scale, retrofitting, pilot projects
Table 2. Estimated Annual Heating and Cooling Demand by Sector in Glace Bay.
Table 2. Estimated Annual Heating and Cooling Demand by Sector in Glace Bay.
SectorArea
(m2)
EUI
(GJ/m2)
f h e a t i n g f c o o l i n g Heating
Demand
(GWh/Year) *
Cooling
Demand (GWh/Year) *
Combined
Demand
(GWh/Year) *
Residential1.4 × 1060.580.6550.006≈148≈1.36≈150
Commercial170,0001.120.4240.089≈22.454.7027.15
Industrial48,0000.80.600.056.40.536.93
Total1.62 × 106---177.45≈7184.45 (≈185)
* Heating and cooling demand values are rounded to two decimal places where indicated. Minor discrepancies in totals are due to rounding.
Table 3. Total Estimated Capital Costs for MTES System in Glace Bay.
Table 3. Total Estimated Capital Costs for MTES System in Glace Bay.
ComponentLow Estimate
(Million USD)
High Estimate
(Million USD)
Well Drilling (5 wells total)$0.09$0.17
Geothermal Heat Pump System$28$52
Heat Exchanger System$2.3$7
Piping and Distribution Network$85.6$128.4
SCADA/Control System$0.15$0.5
Subtotal Capital Costs$116.1$188
Contingency (10%)$11.6$18.8
Total Estimated Capital Cost$127$206
Table 4. Estimated Annual Operational and Maintenance Costs for MTES System in Glace Bay.
Table 4. Estimated Annual Operational and Maintenance Costs for MTES System in Glace Bay.
ComponentLow Estimate
(Million)
High Estimate
(Million)
Labor and Management$0.57$0.66
Energy Cost$5.80$5.80
Maintenance and Repairs$1.70$2.70
Subtotal (Base OPEX)$8.07$9.16
Contingency (5%)$0.40$0.46
Total Estimated OPEX$8.47$9.62
Disclaimer/Publisher’s Note: The statements, opinions and data contained in all publications are solely those of the individual author(s) and contributor(s) and not of MDPI and/or the editor(s). MDPI and/or the editor(s) disclaim responsibility for any injury to people or property resulting from any ideas, methods, instructions or products referred to in the content.

Share and Cite

MDPI and ACS Style

Sohrabikhah, S.; Hughes, L. A Performance Evaluation and Feasibility Study of Mine Thermal Energy Storage in Glace Bay, Nova Scotia. Energies 2025, 18, 4780. https://doi.org/10.3390/en18174780

AMA Style

Sohrabikhah S, Hughes L. A Performance Evaluation and Feasibility Study of Mine Thermal Energy Storage in Glace Bay, Nova Scotia. Energies. 2025; 18(17):4780. https://doi.org/10.3390/en18174780

Chicago/Turabian Style

Sohrabikhah, Sara, and Larry Hughes. 2025. "A Performance Evaluation and Feasibility Study of Mine Thermal Energy Storage in Glace Bay, Nova Scotia" Energies 18, no. 17: 4780. https://doi.org/10.3390/en18174780

APA Style

Sohrabikhah, S., & Hughes, L. (2025). A Performance Evaluation and Feasibility Study of Mine Thermal Energy Storage in Glace Bay, Nova Scotia. Energies, 18(17), 4780. https://doi.org/10.3390/en18174780

Note that from the first issue of 2016, this journal uses article numbers instead of page numbers. See further details here.

Article Metrics

Back to TopTop