Monteiro, L.G.; Macedo, W.N.; Torres, P.F.; Silva, M.M.; Amaral, G.; Piterman, A.S.; Lopes, B.M.; Fraga, J.M.; Boaventura, W.C.
One-Year Monitoring PV Power Plant Installed on Rooftop of Mineirão Fifa World Cup/Olympics Football Stadium. Energies 2017, 10, 225.
https://doi.org/10.3390/en10020225
AMA Style
Monteiro LG, Macedo WN, Torres PF, Silva MM, Amaral G, Piterman AS, Lopes BM, Fraga JM, Boaventura WC.
One-Year Monitoring PV Power Plant Installed on Rooftop of Mineirão Fifa World Cup/Olympics Football Stadium. Energies. 2017; 10(2):225.
https://doi.org/10.3390/en10020225
Chicago/Turabian Style
Monteiro, LuÃs G., Wilson N. Macedo, Pedro F. Torres, Márcio M. Silva, Guilherme Amaral, Alexandre S. Piterman, Bruno M. Lopes, Juliano M. Fraga, and Wallace C. Boaventura.
2017. "One-Year Monitoring PV Power Plant Installed on Rooftop of Mineirão Fifa World Cup/Olympics Football Stadium" Energies 10, no. 2: 225.
https://doi.org/10.3390/en10020225
APA Style
Monteiro, L. G., Macedo, W. N., Torres, P. F., Silva, M. M., Amaral, G., Piterman, A. S., Lopes, B. M., Fraga, J. M., & Boaventura, W. C.
(2017). One-Year Monitoring PV Power Plant Installed on Rooftop of Mineirão Fifa World Cup/Olympics Football Stadium. Energies, 10(2), 225.
https://doi.org/10.3390/en10020225