Ferrari de Campos, D.J.; Camapum de Carvalho, J.; Queiroz, P.I.B.d.; Ozelim, L.C.S.M.; Schiavon, J.A.; Ribeiro, D.B.; Domingues, V.R.
Using Continuous Flight Auger Pile Execution Energy to Enhance Reliability and Reduce Costs in Foundation Construction. Automation 2025, 6, 24.
https://doi.org/10.3390/automation6020024
AMA Style
Ferrari de Campos DJ, Camapum de Carvalho J, Queiroz PIBd, Ozelim LCSM, Schiavon JA, Ribeiro DB, Domingues VR.
Using Continuous Flight Auger Pile Execution Energy to Enhance Reliability and Reduce Costs in Foundation Construction. Automation. 2025; 6(2):24.
https://doi.org/10.3390/automation6020024
Chicago/Turabian Style
Ferrari de Campos, Darym Júnior, José Camapum de Carvalho, Paulo Ivo Braga de Queiroz, Luan Carlos Sena Monteiro Ozelim, José Antonio Schiavon, Dimas Betioli Ribeiro, and Vinicius Resende Domingues.
2025. "Using Continuous Flight Auger Pile Execution Energy to Enhance Reliability and Reduce Costs in Foundation Construction" Automation 6, no. 2: 24.
https://doi.org/10.3390/automation6020024
APA Style
Ferrari de Campos, D. J., Camapum de Carvalho, J., Queiroz, P. I. B. d., Ozelim, L. C. S. M., Schiavon, J. A., Ribeiro, D. B., & Domingues, V. R.
(2025). Using Continuous Flight Auger Pile Execution Energy to Enhance Reliability and Reduce Costs in Foundation Construction. Automation, 6(2), 24.
https://doi.org/10.3390/automation6020024