A Statistical Approach to Analyzing Engineering Estimates and Bids
Abstract
:1. Introduction
1.1. Contingency Analysis
1.2. Impacts on the Market
1.3. The Prediction of Final Cost
2. Significance of the Research
3. Methodology
4. Results
4.1. Project Estimates
4.2. Statistical Characteristic of Bids
5. Conclusions
Author Contributions
Funding
Institutional Review Board Statement
Informed Consent Statement
Data Availability Statement
Acknowledgments
Conflicts of Interest
References
- AbouRizk, S.M.; Babey, G.M.; Karumanasseri, G. Estimating the Cost of Capital Projects: An Empirical Study of Accuracy Levels for Municipal Government Projects. Can. J. Civ. Eng. 2002, 29, 653–661. [Google Scholar] [CrossRef]
- Rothwell, G. Cost Contingency as the Standard Deviation of the Cost Estimate. Cost Eng. 2005, 47, 22–25. [Google Scholar]
- Nelson, D.; Tehrani, F.M. Is Resilience … Sustainable? APWA Report. 2018, 85, 53–56. [Google Scholar]
- Tehrani, F.M. Deploying and Rating Sustainable Practices for Resilient Bridge Infrastructure. Keynote Lecture. In Proceedings of the Fifth International Conference on Bridges, Tehran, Iran, 17–18 December 2019. [Google Scholar]
- Bajari, P.L.; McMillan, R.S.; Tadelis, S. Auctions versus Negotiations in Procurement: An Empirical Analysis. J. Law Econ. Organ. 2009, 25, 372–399. [Google Scholar] [CrossRef] [Green Version]
- Lagace, J. Making Sense of Your Project Cost Estimate. Chem. Eng. 2006, 113, 54–58. [Google Scholar]
- Rosenfeld, Y. Root-cause Analysis of Construction-cost Overruns. J. Constr. Eng. Manag. 2014, 140, 04013039. [Google Scholar] [CrossRef]
- Rothkopf, M.H. A Model of Rational Competitive Bidding. Manag. Sci. 1969, 15, 362–373. [Google Scholar] [CrossRef]
- Singh, A.; Shiramizu, S.; Gantam, K. Bid Risk and Contingency Analysis. Cost Eng. 2007, 49, 20–27. [Google Scholar]
- Ergin, A.A. Determination of Contingency for International Construction Projects during Bidding Stage. Master’s Thesis, Middle East Technical University, Ankara, Turkey, 2005. [Google Scholar]
- Schexnayder, C.J.; Weber, S.L.; Fiori, C. Project Cost Estimating: A Synthesis of Highway Practice (Part of NCHRP Project 20-7, Task 152); National Cooperative Highway Research Program; Transportation Research Board: Washington, DC, USA, 2003. [Google Scholar]
- Gaver, K.M.; Zimmerman, J.L. An Analysis of Competitive Bidding on BART Contracts. J. Bus. 1977, 50, 279–295. [Google Scholar] [CrossRef]
- Hiyassat, M.A.S. Construction Bid Price Evaluation. Can. J. Civ. Eng. 2001, 28, 264–270. [Google Scholar] [CrossRef]
- Lo, W.; Lin, C.L.; Yan, M.R. Contractor’s opportunistic bidding behavior and equilibrium price level in the construction market. Asce J. Constr. Eng. Manag. 2007, 133, 409–416. [Google Scholar] [CrossRef]
- De, S.; Fedenia, M.; Triantis, A.J. Effects of competition on bidder returns. J. Corp. Financ. 1996, 2, 261–282. [Google Scholar] [CrossRef]
- Aretoulis, G.; Angelides, D.; Kalfakakou, G.; Fotiadis, G.; Anastasiadis, K. A Prototype System for the Prediction of Final Cost in Construction Projects. Oper. Res. 2006, 6, 323–332. [Google Scholar] [CrossRef]
- Carr, P.G. Investigation of Bid Price Competition Measured Through Prebid Project Estimates, Actual Bid Prices, and Number of Bidders. J. Constr. Eng. Manag. 2005, 131, 1165–1172. [Google Scholar] [CrossRef]
- Tehrani, F.M. Engineer’s estimate reliability and statistical characteristics of bids. Cogent Eng. 2016, 3, 1133259. [Google Scholar] [CrossRef]
- Okere, G. Reliance on and Reliability of the Engineer’s Estimate in Heavy Civil Projects. J. Constr. Econ. Build. 2017, 17, 92–114. [Google Scholar] [CrossRef] [Green Version]
True Cost Hypothesis vs. Error Measures | The Lowest Bid | The 2nd Low Bid | Average 3- Low Bids | Average Bids | Average of Non-Extreme Bids | Trimmed Mean of Bids | Median Bid |
---|---|---|---|---|---|---|---|
Weighted Signed Average (Program) | −1.66% | 4.29% | 3.38% | 8.26% | 4.26% | 7.49% | 7.28% |
Signed Average (Projects) | 1.49% | 10.05% | 9.75% | 16.49% | 14.54% | 14.71% | 14.75% |
Least Square Root (Probable) | 18.52% | 24.35% | 24.19% | 27.77% | 27.34% | 6.76% | 26.60% |
Publisher’s Note: MDPI stays neutral with regard to jurisdictional claims in published maps and institutional affiliations. |
© 2021 by the authors. Licensee MDPI, Basel, Switzerland. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license (http://creativecommons.org/licenses/by/4.0/).
Share and Cite
Farshidpour, R.; Negoro, K.; Tehrani, F.M. A Statistical Approach to Analyzing Engineering Estimates and Bids. Stats 2021, 4, 62-70. https://doi.org/10.3390/stats4010005
Farshidpour R, Negoro K, Tehrani FM. A Statistical Approach to Analyzing Engineering Estimates and Bids. Stats. 2021; 4(1):62-70. https://doi.org/10.3390/stats4010005
Chicago/Turabian StyleFarshidpour, Roshanak, Kiana Negoro, and Fariborz M. Tehrani. 2021. "A Statistical Approach to Analyzing Engineering Estimates and Bids" Stats 4, no. 1: 62-70. https://doi.org/10.3390/stats4010005
APA StyleFarshidpour, R., Negoro, K., & Tehrani, F. M. (2021). A Statistical Approach to Analyzing Engineering Estimates and Bids. Stats, 4(1), 62-70. https://doi.org/10.3390/stats4010005