Next Article in Journal
Hydraulic Fracturing Pressure Relief for Pillar Size Optimization in Ultra-Thick Coal Seam Longwall Panels: Design, Monitoring, and Field Verification
Previous Article in Journal
Casing Running in Ultra-Long Open-Hole Sections: A Case Study of J108-2H Well in Chuanzhong Gas Field
 
 
Article

Article Versions Notes

Processes 2025, 13(9), 2974; https://doi.org/10.3390/pr13092974
Action Date Notes Link
article xml file uploaded 18 September 2025 11:49 CEST Original file -
article xml uploaded. 18 September 2025 11:49 CEST Update https://www.mdpi.com/2227-9717/13/9/2974/xml
article pdf uploaded. 18 September 2025 11:49 CEST Version of Record https://www.mdpi.com/2227-9717/13/9/2974/pdf
article html file updated 18 September 2025 11:50 CEST Original file https://www.mdpi.com/2227-9717/13/9/2974/html
Back to TopTop