Zhong, Z.; Zhu, L.; Fu, W.; Qin, J.; Zhao, M.; A, R.
Parallel Disassembly Sequence Planning Using a Discrete Whale Optimization Algorithm for Equipment Maintenance in Hydropower Station. Processes 2024, 12, 1412.
https://doi.org/10.3390/pr12071412
AMA Style
Zhong Z, Zhu L, Fu W, Qin J, Zhao M, A R.
Parallel Disassembly Sequence Planning Using a Discrete Whale Optimization Algorithm for Equipment Maintenance in Hydropower Station. Processes. 2024; 12(7):1412.
https://doi.org/10.3390/pr12071412
Chicago/Turabian Style
Zhong, Ziwei, Lingkai Zhu, Wenlong Fu, Jiafeng Qin, Mingzhe Zhao, and Rixi A.
2024. "Parallel Disassembly Sequence Planning Using a Discrete Whale Optimization Algorithm for Equipment Maintenance in Hydropower Station" Processes 12, no. 7: 1412.
https://doi.org/10.3390/pr12071412
APA Style
Zhong, Z., Zhu, L., Fu, W., Qin, J., Zhao, M., & A, R.
(2024). Parallel Disassembly Sequence Planning Using a Discrete Whale Optimization Algorithm for Equipment Maintenance in Hydropower Station. Processes, 12(7), 1412.
https://doi.org/10.3390/pr12071412