Xu, C.; Chen, G.; Lu, H.; Zhang, Q.; Liu, Z.; Bian, J.
Integrated Optimization of Production Scheduling and Haulage Route Planning in Open-Pit Mines. Mathematics 2024, 12, 2070.
https://doi.org/10.3390/math12132070
AMA Style
Xu C, Chen G, Lu H, Zhang Q, Liu Z, Bian J.
Integrated Optimization of Production Scheduling and Haulage Route Planning in Open-Pit Mines. Mathematics. 2024; 12(13):2070.
https://doi.org/10.3390/math12132070
Chicago/Turabian Style
Xu, Changyou, Gang Chen, Huabo Lu, Qiuxia Zhang, Zhengke Liu, and Jing Bian.
2024. "Integrated Optimization of Production Scheduling and Haulage Route Planning in Open-Pit Mines" Mathematics 12, no. 13: 2070.
https://doi.org/10.3390/math12132070
APA Style
Xu, C., Chen, G., Lu, H., Zhang, Q., Liu, Z., & Bian, J.
(2024). Integrated Optimization of Production Scheduling and Haulage Route Planning in Open-Pit Mines. Mathematics, 12(13), 2070.
https://doi.org/10.3390/math12132070