Moin, C.J.; Iqbal, M.; Malek, A.B.M.A.; Khan, M.M.A.; Haque, R.
Prioritization of Environmental Uncertainty and Manufacturing Flexibility for Labor-Intensive Industry: A Case Study on Ready-Made Garment Industries in Bangladesh. Systems 2022, 10, 67.
https://doi.org/10.3390/systems10030067
AMA Style
Moin CJ, Iqbal M, Malek ABMA, Khan MMA, Haque R.
Prioritization of Environmental Uncertainty and Manufacturing Flexibility for Labor-Intensive Industry: A Case Study on Ready-Made Garment Industries in Bangladesh. Systems. 2022; 10(3):67.
https://doi.org/10.3390/systems10030067
Chicago/Turabian Style
Moin, Chowdhury Jony, Mohammad Iqbal, A. B. M. Abdul Malek, Mohammad Muhshin Aziz Khan, and Rezwanul Haque.
2022. "Prioritization of Environmental Uncertainty and Manufacturing Flexibility for Labor-Intensive Industry: A Case Study on Ready-Made Garment Industries in Bangladesh" Systems 10, no. 3: 67.
https://doi.org/10.3390/systems10030067
APA Style
Moin, C. J., Iqbal, M., Malek, A. B. M. A., Khan, M. M. A., & Haque, R.
(2022). Prioritization of Environmental Uncertainty and Manufacturing Flexibility for Labor-Intensive Industry: A Case Study on Ready-Made Garment Industries in Bangladesh. Systems, 10(3), 67.
https://doi.org/10.3390/systems10030067