Next Article in Journal
Removal of Escherichia coli by Intermittent Operation of Saturated Sand Columns Supplemented with Hydrochar Derived from Sewage Sludge
Previous Article in Journal
Longitudinal Removal of Bisphenol-A and Nonylphenols from Pretreated Domestic Wastewater by Tropical Horizontal Sub-SurfaceConstructed Wetlands
Previous Article in Special Issue
Experimental Study and Numerical Simulation of a Laminated Reinforced Concrete Shear Wall with a Vertical Seam
 
 

Order Article Reprints

Journal: Appl. Sci., 2017
Volume: 7
Number: 837

Article: BIM-Based Approach to Simulate Building Adaptive Performance and Life Cycle Costs for an Open Building Design
Authors: by Yi-Kai Juan and Nai-Pin Hsing
Link: https://www.mdpi.com/2076-3417/7/8/837

MDPI offers high quality article reprints with convenient shipping to destinations worldwide. Each reprint features a 270 gsm bright white cover and 105 gsm premium white paper, bound with two stitches for durability and printed in full color. The cover design is customized to your article and designed to be complimentary to the journal.

Order Cost and Details

Shipping Address

Billing Address

Notes or Comments

Validate and Place Order

The order must be prepaid after it is placed

req denotes required fields.
Back to TopTop