Zhang, H.; Zhang, L.; Chang, J.; Li, Y.; Long, R.; Xing, Z.
Study on the Optimal Operation of a Hydropower Plant Group Based on the Stochastic Dynamic Programming with Consideration for Runoff Uncertainty. Water 2022, 14, 220.
https://doi.org/10.3390/w14020220
AMA Style
Zhang H, Zhang L, Chang J, Li Y, Long R, Xing Z.
Study on the Optimal Operation of a Hydropower Plant Group Based on the Stochastic Dynamic Programming with Consideration for Runoff Uncertainty. Water. 2022; 14(2):220.
https://doi.org/10.3390/w14020220
Chicago/Turabian Style
Zhang, Hongxue, Lianpeng Zhang, Jianxia Chang, Yunyun Li, Ruihao Long, and Zhenxiang Xing.
2022. "Study on the Optimal Operation of a Hydropower Plant Group Based on the Stochastic Dynamic Programming with Consideration for Runoff Uncertainty" Water 14, no. 2: 220.
https://doi.org/10.3390/w14020220
APA Style
Zhang, H., Zhang, L., Chang, J., Li, Y., Long, R., & Xing, Z.
(2022). Study on the Optimal Operation of a Hydropower Plant Group Based on the Stochastic Dynamic Programming with Consideration for Runoff Uncertainty. Water, 14(2), 220.
https://doi.org/10.3390/w14020220