Next Article in Journal
Uncertainty of Energy and Economic Performance of Manual Solar Shades in Hot Summer and Cold Winter Regions of China
Next Article in Special Issue
Minimizing Makespan in A Two-Machine Flowshop Problem with Processing Time Linearly Dependent on Job Waiting Time
Previous Article in Journal
The Relationship between Psychological Contract Breach and Job Insecurity or Stress in Employees Engaged in the Restaurant Business
Previous Article in Special Issue
Renovation Construction Process Scheduling for Long-Term Performance of Buildings: An Application Case of University Campus
 
 

Order Article Reprints

Journal: Sustainability, 2019
Volume: 11
Number: 5710

Article: A Novel Method of Developing Construction Projects Schedule under Rework Scenarios
Authors: by Guofeng Ma, Shan Jiang, Tiancheng Zhu and Jianyao Jia
Link: https://www.mdpi.com/2071-1050/11/20/5710

MDPI offers high quality article reprints with convenient shipping to destinations worldwide. Each reprint features a 270 gsm bright white cover and 105 gsm premium white paper, bound with two stitches for durability and printed in full color. The cover design is customized to your article and designed to be complimentary to the journal.

Order Cost and Details

Shipping Address

Billing Address

Notes or Comments

Validate and Place Order

The order must be prepaid after it is placed

req denotes required fields.
Back to TopTop