Text Correction
There was an error in the original publication [1]. There was an error in the decimals reported for the mean annual increment. The correct estimated value is 3.78 m3 ha−1 year−1.
A correction has been made to Section 2.2, Paragraph 3:
The estimated MAI (excluding remnant trees) was 3.78 m3 ha−1 year−1 and, based on this estimate and a 30% harvesting intensity, a 7.3 year cutting cycle was determined (return interval in years between timber harvests in the same area; Appendix C).
A correction has been made to Section 2.4, Paragraph 5:
Based on the MAI estimated from the standing volume excluding the remnant trees (3.78 m3 ha−1 year−1), with harvesting intensities of 10%, 17%, 20% and 30%, the cutting cycles estimated were 2.2, 3.8, 4.6 and 7.3 years, respectively (Appendix C).
The authors state that the scientific conclusions are unaffected. This correction was approved by the Academic Editor. The original publication has also been updated.
Reference
- Toledo-Aceves, T.; Günter, S.; Guariguata, M.R.; García-Díaz, M.; Zhunusova, E. Financial Revenues from Timber Harvesting in Secondary Cloud Forests: A Case Study from Mexico. Forests 2022, 13, 1496. [Google Scholar] [CrossRef]
Publisher’s Note: MDPI stays neutral with regard to jurisdictional claims in published maps and institutional affiliations. |
© 2022 by the authors. Licensee MDPI, Basel, Switzerland. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license (https://creativecommons.org/licenses/by/4.0/).