Bi-Objective Optimization Model for Optimal Placement of Thyristor-Controlled Series Compensator Devices

1
Department of Electrical Engineering, Marvdasht Branch, Islamic Azad University, Marvdasht, Iran
2
Power Systems, Electronics and Control Research Laboratory, UWE Bristol BS16 1QY, UK
3
Department of Electrical and Electronics Engineering, Mugla Sitki Kocman University, Mugla 48000, Turkey
4
Department of Electrical Engineering, Yildiz Technical University, Istanbul 34220, Turkey
5
Faculty of Engineering of the University of Porto and INESC TEC, 4200-465 Porto, Portugal
*
Author to whom correspondence should be addressed.
Energies 2019, 12(13), 2601; https://doi.org/10.3390/en12132601
Received: 19 May 2019 / Revised: 24 June 2019 / Accepted: 3 July 2019 / Published: 6 July 2019
Exposure to extreme weather conditions increases power systems’ vulnerability in front of high impact, low probability contingency occurrence. In the post-restructuring years, due to the increasing demand for energy, competition between electricity market players and increasing penetration of renewable resources, the provision of effective resiliency-based approaches has received more attention. In this paper, as the major contribution to current literature, a novel approach is proposed for resiliency improvement in a way that enables power system planners to manage several resilience metrics efficiently in a bi-objective optimization planning model simultaneously. For demonstration purposes, the proposed method is applied for optimal placement of the thyristor controlled series compensator (TCSC). Improvement of all considered resilience metrics regardless of their amount in a multi-criteria decision-making framework is novel in comparison to the other previous TCSC placement approaches. Without loss of generality, the developed resiliency improvement approach is applicable in any power system planning and operation problem. The simulation results on IEEE 30-bus and 118-bus test systems confirm the practicality and effectiveness of the developed approach. Simulation results show that by considering resilience metrics, the performance index, importance of curtailed consumers, congestion management cost, number of curtailed consumers, and amount of load loss are improved by 0.63%, 43.52%, 65.19%, 85.93%, and 85.94%, respectively. View Full-Text
Keywords: contingency; multi-objective optimization; planning; power system resiliency; TCSC placement; vulnerability contingency; multi-objective optimization; planning; power system resiliency; TCSC placement; vulnerability
Show Figures

Figure 1

MDPI and ACS Style

Salehizadeh, M.R.; Koohbijari, M.A.; Nouri, H.; Taşcıkaraoğlu, A.; Erdinç, O.; Catalão, J.P.S. Bi-Objective Optimization Model for Optimal Placement of Thyristor-Controlled Series Compensator Devices. Energies 2019, 12, 2601.

Show more citation formats Show less citations formats
Note that from the first issue of 2016, MDPI journals use article numbers instead of page numbers. See further details here.

Article Access Map by Country/Region

1
Back to TopTop