Sign in to use this feature.

Years

Between: -

Subjects

remove_circle_outline
remove_circle_outline
remove_circle_outline
remove_circle_outline
remove_circle_outline

Journals

Article Types

Countries / Regions

Search Results (4)

Search Parameters:
Keywords = Kurobe River

Order results
Result details
Results per page
Select all
Export citation of selected articles as:
15 pages, 2181 KiB  
Article
The Impact of Shifts in Both Precipitation Pattern and Temperature Changes on River Discharge in Central Japan
by Bing Zhang, Jingyan Han, Jianbo Liu and Yong Zhao
Hydrology 2025, 12(7), 187; https://doi.org/10.3390/hydrology12070187 - 9 Jul 2025
Viewed by 479
Abstract
Rivers play a crucial role in the hydrological cycle and serve as essential freshwater resources for both human populations and ecosystems. Climate change significantly alters precipitation patterns and river discharge variability. However, the impact of precipitation patterns (rainfall and snowfall) and air temperature [...] Read more.
Rivers play a crucial role in the hydrological cycle and serve as essential freshwater resources for both human populations and ecosystems. Climate change significantly alters precipitation patterns and river discharge variability. However, the impact of precipitation patterns (rainfall and snowfall) and air temperature on river discharge in coastal zones remains inadequately understood. This study focused on Toyama Prefecture, located along the Sea of Japan, as a representative coastal area. We analyzed over 30 years of datasets, including air temperature, precipitation, snowfall, and river discharge, to assess the effects of climate change on river discharge. Trends in hydroclimatic datasets were assessed using the rescaled adjusted partial sums (RAPS) method and the Mann–Kendall (MK) non-parametric test. Furthermore, a correlation analysis and the Structural Equation Model (SEM) were applied to construct a relationship between precipitation, temperature, and river discharge. Our findings indicated a significant increase in air temperature at a rate of 0.2 °C per decade, with notable warming observed in late winter (January and February) and early spring (March). The average river fluxes for the Jinzu, Oyabe, Kurobe, Shou, and Joganji rivers were 182.52 m3/s, 60.37 m3/s, 41.40 m3/s, 38.33 m3/s, and 18.72 m3/s, respectively. The tipping point for snowfall decline occurred in 1992, marked by an obvious decrease in snowfall depth. The SEM showed that, although rainfall dominated the changes in river discharge (loading = 0.94), the transition from solid (snow) to liquid (rain) precipitation may alter the river discharge regime. The percentage of flood occurrence increased from 19% (1940–1992) to 41% (1993–2020). These changes highlight the urgent need to raise awareness about the impacts of climate change on river floods and freshwater resources in global coastal regions. Full article
Show Figures

Figure 1

17 pages, 9312 KiB  
Article
Hydraulic Evaluation of the Levee System Evolution on the Kurobe Alluvial Fan in the 18th and 19th Centuries
by Tadaharu Ishikawa and Hiroshi Senoo
Energies 2021, 14(15), 4406; https://doi.org/10.3390/en14154406 - 21 Jul 2021
Cited by 6 | Viewed by 2694
Abstract
The development process and flood control effects of the open-levee system, which was constructed from the mid-18th to the mid-19th centuries, on the Kurobe Alluvial Fan—a large alluvial fan located on the Japan Sea Coast of Japan’s main island—was evaluated using numerical flow [...] Read more.
The development process and flood control effects of the open-levee system, which was constructed from the mid-18th to the mid-19th centuries, on the Kurobe Alluvial Fan—a large alluvial fan located on the Japan Sea Coast of Japan’s main island—was evaluated using numerical flow simulation. The topography for the numerical simulation was determined from an old pictorial map in the 18th century and various maps after the 19th century, and the return period of the flood hydrograph was determined to be 10 years judging from the level of civil engineering of those days. The numerical results suggested the followings: The levees at the first stage were made to block the dominant divergent streams to gather the river flows together efficiently; by the completed open-levee system, excess river flow over the main channel capacity was discharged through upstream levee openings to old stream courses which were used as temporary floodways, and after the flood peak, a part of the flooded water returned to the main channel through the downstream levee openings. It is considered that the ideas of civil engineers of those days to control the floods exceeding river channel capacity, embodied in their levee arrangement, will give us hints on how to control the extraordinary floods that we should face in the near future when the scale of storms will increase due to the global climate change. Full article
Show Figures

Figure 1

22 pages, 6134 KiB  
Article
Numerical Study of Discharge Adjustment Effects on Reservoir Morphodynamics and Flushing Efficiency: An Outlook for the Unazuki Reservoir, Japan
by Taymaz Esmaeili, Tetsuya Sumi, Sameh A. Kantoush, Yoji Kubota, Stefan Haun and Nils Rüther
Water 2021, 13(12), 1624; https://doi.org/10.3390/w13121624 - 9 Jun 2021
Cited by 6 | Viewed by 3350
Abstract
The Unazuki Reservoir is located on the Kurobe River, which is influenced by a catchment with one of the highest sediment yields in Japan. Due to a sufficiently available discharge during flood events, annual sediment flushing with full water-level drawdown (i.e., free-flow sediment [...] Read more.
The Unazuki Reservoir is located on the Kurobe River, which is influenced by a catchment with one of the highest sediment yields in Japan. Due to a sufficiently available discharge during flood events, annual sediment flushing with full water-level drawdown (i.e., free-flow sediment flushing) is conducted to preserve the effective storage capacity of the reservoir. Nevertheless, the upstream half of the reservoir (i.e., study segment) suffers from the excessive deposition of coarser sediments. Remobilization of these coarser materials and their transportation further downstream of the reservoir is a priority of reservoir owners for sustainable reservoir functions, such as flood-risk management and hydroelectric energy generation. In this paper, an already conducted sediment-flushing operation in the Unazuki Reservoir is simulated, and its effects on sediment scouring from the study segment of the reservoir together with changes in bed morphodynamics are presented. A fully 3D numerical model using the finite volume approach in combination with a wetting/drying algorithm was utilized to reproduce the hydrodynamics and bed changes using the available onsite data. Afterwards, the effects of discharge adjustment on the morphological bed changes and flushing efficiency were analysed in the study segment using an additional single-discharge pulse supplied from upstream reservoirs. Simulation results showed that an approximately 75% increase in the average discharge during the free-flow stage changed the dominant morphological process from deposition into an erosive mode in the study segment. If the increase in discharge reaches up to 100%, the flushed volume of sediments from the target segment can increase 2.9 times compared with the initiation of the erosive mode. Full article
(This article belongs to the Special Issue Sediment Transport and River Morphology)
Show Figures

Figure 1

22 pages, 4701 KiB  
Article
Three-Dimensional Numerical Study of Free-Flow Sediment Flushing to Increase the Flushing Efficiency: A Case-Study Reservoir in Japan
by Taymaz Esmaeili, Tetsuya Sumi, Sameh A. Kantoush, Yoji Kubota, Stefan Haun and Nils Rüther
Water 2017, 9(11), 900; https://doi.org/10.3390/w9110900 - 19 Nov 2017
Cited by 41 | Viewed by 7865
Abstract
The catchment of the Dashidaira reservoir located on the Kurobe River has high sediment yield. Because of the sufficient available amount of water in the catchment during flood events, the free-flow sediment flushing operation with full water-level drawdown is employed every year to [...] Read more.
The catchment of the Dashidaira reservoir located on the Kurobe River has high sediment yield. Because of the sufficient available amount of water in the catchment during flood events, the free-flow sediment flushing operation with full water-level drawdown is employed every year to preserve the effective storage capacity of the Dashidaira reservoir. This paper focuses first on the numerical simulation of a previously conducted free-flow flushing operation in the Dashidaira reservoir using the available in situ obtained data. Afterwards, to improve the flushing efficiency, the effects of water and discharge manipulation and the construction of an auxiliary channel on the total volume of the flushed sediment were studied. A fully 3D numerical model using the finite volume approach in combination with a wetting/drying algorithm was utilized to reproduce the flow velocity field and simulate the movable bed variations. The outcomes revealed that increasing the average free-flow discharge during the free-flow stage by approximately 56%, in the form of multiple discharge pulses, can enhance the flushing efficiency by up to 13%, and the construction of an auxiliary channel in the wide midstream of the reservoir can locally increase the sediment erosion from this area. Full article
(This article belongs to the Special Issue Adaptive Catchment Management and Reservoir Operation)
Show Figures

Figure 1

Back to TopTop