Joint Determination of the Production Lot Size and Number of Shipments for EPQ Model with Rework
Abstract
Share and Cite
Chiu, S.W.; Gong, D.-C.; Chiu, C.-L.; Chung, C.-L. Joint Determination of the Production Lot Size and Number of Shipments for EPQ Model with Rework. Math. Comput. Appl. 2011, 16, 317-328. https://doi.org/10.3390/mca16020317
Chiu SW, Gong D-C, Chiu C-L, Chung C-L. Joint Determination of the Production Lot Size and Number of Shipments for EPQ Model with Rework. Mathematical and Computational Applications. 2011; 16(2):317-328. https://doi.org/10.3390/mca16020317
Chicago/Turabian StyleChiu, Singa Wang, Dah-Chuan Gong, Chun-Lin Chiu, and Chia-Ling Chung. 2011. "Joint Determination of the Production Lot Size and Number of Shipments for EPQ Model with Rework" Mathematical and Computational Applications 16, no. 2: 317-328. https://doi.org/10.3390/mca16020317
APA StyleChiu, S. W., Gong, D.-C., Chiu, C.-L., & Chung, C.-L. (2011). Joint Determination of the Production Lot Size and Number of Shipments for EPQ Model with Rework. Mathematical and Computational Applications, 16(2), 317-328. https://doi.org/10.3390/mca16020317