Sign in to use this feature.

Years

Between: -

Subjects

remove_circle_outline
remove_circle_outline
remove_circle_outline
remove_circle_outline

Journals

Article Types

Countries / Regions

Search Results (1)

Search Parameters:
Keywords = pumping well water to melt ice

Order results
Result details
Results per page
Select all
Export citation of selected articles as:
23 pages, 5513 KiB  
Article
Study on Sustainable Well Water Pumping Technology to Melt Ice in Winter for the Middle Route of the South-to-North Water Diversion Project
by Yuning Zhang, Jijian Lian and Xin Zhao
Water 2022, 14(16), 2550; https://doi.org/10.3390/w14162550 - 19 Aug 2022
Cited by 1 | Viewed by 2065
Abstract
In order to improve the water delivery capacity of the middle route of the South-to-North Water Diversion Project in winter, the technology of pumping well water to melt ice was previously adopted to improve the water temperature of the channel. In order to [...] Read more.
In order to improve the water delivery capacity of the middle route of the South-to-North Water Diversion Project in winter, the technology of pumping well water to melt ice was previously adopted to improve the water temperature of the channel. In order to protect the local ecology and channel water quality during the process of pumping and recharging, this paper has analyzed the optimal limit to the range of groundwater level fluctuations and groundwater temperature fluctuations. The Baiquan Underground Reservoir was considered as the research object, and a three-dimensional numerical model of hydrothermal coupling was established. Correlation analyses of pumping and recharge capacity with various factors, and between temperature changes after recharging and various factors, were carried out with a view to protecting local water quality. The single well pumping and recharging scheme was optimized by genetic algorithm. The quantitative estimation formula of pumping and recharge water capacity, and the well depth, permeability coefficient, initial water level, and duration of continuous pumping and recharge, as well as the recovery water level variation formula, were established under the limitation of water level fluctuation. The quantitative relationship between horizontal maximum diameter, L, and the recharge flow rate, the continuous recharge duration, vertical maximum depth, H; and the well depth, temperature change rate, K, and the recharge water temperature, were obtained. The results showed that the permeability coefficient and soil thermal conductivity had little effect on the temperature field change. Additionally, recharge should be carried out in summer, when the temperature of recharge water is above 14.8 °C. When the number of pumping or recharging times, n, is two, the total amount of pumping or recharging during the operation period reaches its maximum. Compared with continuous operation during the operating period, this report found that the total amount of pumped water would increase by 1.1 × 106 m3, and the total amount of recharge would increase by 7 × 105 m3. Full article
Show Figures

Figure 1

Back to TopTop