Sign in to use this feature.

Years

Between: -

Subjects

remove_circle_outline
remove_circle_outline
remove_circle_outline
remove_circle_outline
remove_circle_outline

Journals

remove_circle_outline

Article Types

Countries / Regions

Search Results (1)

Search Parameters:
Keywords = improved geostatistical analysis method (i-GAM)

Order results
Result details
Results per page
Select all
Export citation of selected articles as:
22 pages, 6492 KB  
Article
Comprehensive Evaluation for Real-Time Compaction Quality Using i-AHP and i-GAM: Case Study of Earth-Rock Dam
by Minghui Liu, Xiaoling Wang, Jiajun Wang, Bo Cui, Boqi Deng and Mengnan Shi
Appl. Sci. 2019, 9(8), 1543; https://doi.org/10.3390/app9081543 - 13 Apr 2019
Cited by 7 | Viewed by 3375
Abstract
The real-time compaction quality evaluation of earth-rock dam plays a pivotal role in ensuring dam safety. However, the current real-time compaction quality evaluation only takes the physical properties of compacted dam materials into account, which fails to characterize whether their mechanical property meets [...] Read more.
The real-time compaction quality evaluation of earth-rock dam plays a pivotal role in ensuring dam safety. However, the current real-time compaction quality evaluation only takes the physical properties of compacted dam materials into account, which fails to characterize whether their mechanical property meets the requirements of deformation and destruction, and no quantitative heterogeneity of real-time compaction quality is studied. This paper presents a comprehensive evaluation method to address these problems. First, based on on-site tests, real-time physical and mechanical indices are obtained. Next, the analytic hierarchy process, extended by the interval model (i-AHP) method, is introduced for real-time compaction quality evaluation considering both these indices, and the hybrid compaction index (HCI) is firstly proposed based on the i-AHP method. Finally, an improved geostatistical analysis method (i-GAM) is developed to quantify the real-time compaction quality heterogeneity. A case study of an earth-rock dam project in southwest China demonstrates the effectiveness and advantages of the proposed method. Full article
(This article belongs to the Section Civil Engineering)
Show Figures

Figure 1

Back to TopTop