Next Article in Journal
A Framework for Proactive Resource Provisioning in IaaS Clouds
Next Article in Special Issue
Reliability-Based and Cost-Oriented Product Optimization Integrating Fuzzy Reasoning Petri Nets, Interval Expert Evaluation and Cultural-Based DMOPSO Using Crowding Distance Sorting
Previous Article in Journal
Removal of Crotamiton from Reverse Osmosis Concentrate by a TiO2/Zeolite Composite Sheet
Previous Article in Special Issue
Performance Analysis of a Forecasting Relocation Model for One-Way Carsharing
Article Menu
Issue 8 (August) cover image

Export Article

Open AccessArticle
Appl. Sci. 2017, 7(8), 780; doi:10.3390/app7080780

An Improved Dispatching Method (a-HPDB) for Automated Material Handling System with Active Rolling Belt for 450 mm Wafer Fabrication

1
Department of Industrial Engineering and Management, National Kaohsiung University of Applied Sciences, 80778 Kaohsiung, Taiwan
2
Department of Supply Chain Management, National Kaohsiung Marine University, 81157 Kaohsiung, Taiwan
*
Authors to whom correspondence should be addressed.
Received: 9 July 2017 / Revised: 28 July 2017 / Accepted: 29 July 2017 / Published: 31 July 2017
(This article belongs to the Special Issue Modeling, Simulation, Operation and Control of Discrete Event Systems)
View Full-Text   |   Download PDF [3598 KB, uploaded 2 August 2017]   |  

Abstract

The semiconductor industry is facing the transition from 300 mm to 450 mm wafer fabrication. Due to the increased size and weight, 450 mm wafers will pose unprecedented challenges on semiconductor wafer fabrication. To better handle and transport 450 mm wafers, an advanced Automated Material Handling System (AMHS) is definitely required. Though conveyor-based AMHS is expected to be suitable for 450 mm wafer fabrication, still it faces two main problems, traffic-jam problem and lot-prioritization. To address the two problems, in this research we have proposed an improved dispatching method, termed Heuristic Preemptive Dispatching Method using Activated Roller Belt (a-HPDB). We have developed some effective rules for the a-HPDB based on Activated Roller Belt (ARB). In addition, we have conducted experiments to investigate its effectiveness. Compared with the HPDB and R-HPD, two dispatching rules proposed in previous studies, our experimental results showed the a-HPDB had a better performance in terms of average lot delivery time (ALDT). For hot lots and normal lots, the a-HPDB had advantages of 4.14% and 8.92% over the HPDB and advantages of 4.89% and 8.52% over R-HPD, respectively. View Full-Text
Keywords: conveyor-based AMHS; 450 mm wafer fabrication; dispatching method conveyor-based AMHS; 450 mm wafer fabrication; dispatching method
Figures

Figure 1

This is an open access article distributed under the Creative Commons Attribution License which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited. (CC BY 4.0).

Scifeed alert for new publications

Never miss any articles matching your research from any publisher
  • Get alerts for new papers matching your research
  • Find out the new papers from selected authors
  • Updated daily for 49'000+ journals and 6000+ publishers
  • Define your Scifeed now

SciFeed Share & Cite This Article

MDPI and ACS Style

Wang, C.-N.; Hsu, H.-P.; Tran, V.-V. An Improved Dispatching Method (a-HPDB) for Automated Material Handling System with Active Rolling Belt for 450 mm Wafer Fabrication. Appl. Sci. 2017, 7, 780.

Show more citation formats Show less citations formats

Note that from the first issue of 2016, MDPI journals use article numbers instead of page numbers. See further details here.

Related Articles

Article Metrics

Article Access Statistics

1

Comments

[Return to top]
Appl. Sci. EISSN 2076-3417 Published by MDPI AG, Basel, Switzerland RSS E-Mail Table of Contents Alert
Back to Top