Water 2018, 10(2), 217; https://doi.org/10.3390/w10020217

Assessment of Sediment Impact on the Risk of River Diversion during Dam Construction: A Simulation-Based Project Study on the Jing River, China

1
State Key Laboratory of Water Resources & Hydropower Engineering Science, Wuhan University, Wuhan 430072, China
2
Yellow River Engineering Consulting Co., Ltd., Zhengzhou 450003, China
*
Author to whom correspondence should be addressed.
Received: 28 January 2018 / Revised: 13 February 2018 / Accepted: 14 February 2018 / Published: 17 February 2018
View Full-Text   |   Download PDF [3724 KB, uploaded 21 February 2018]   |  

Abstract

Dams are vital for water resource utilization, and river diversion is key for dam construction safety. As sandy river basins are important exploitation areas that have special diversion features, the impact of sediment on the risk of river diversion during dam construction should be assessed. Diversion uncertainty is the origin of diversion risk, and sediment uncertainty changes the storage and discharge patterns of the diversion system. Two Gumbel–Hougaard (GH) copula functions are adopted to couple the random variables of flood and sediment, so that the sediment impacts on diversion storage and discharge can be obtained by the sampling of flood peaks. Based on variable coupling and sediment amendment, a method of Monte Carlo simulation (MCS) with a water balance calculation can quantitatively assess the risk of sandy river diversion, by evaluating the probability of upstream cofferdam overtopping. By introducing one diversion project on the Jing River in China with a clear water contrast, the risk values of dam construction diversion with or without sediment impacts can be obtained. Results show that the MCS method is feasible for diversion risk assessment; sediment has a negative impact on the risk of river diversion during dam construction, and this degradation effect is more evident for high-assurance diversion schemes. View Full-Text
Keywords: risk assessment; river diversion during dam construction; sediment uncertainty; GH-copula function; Monte-Carlo simulation; Jing River risk assessment; river diversion during dam construction; sediment uncertainty; GH-copula function; Monte-Carlo simulation; Jing River
Figures

Figure 1

This is an open access article distributed under the Creative Commons Attribution License which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited. (CC BY 4.0).

Supplementary material

SciFeed

Share & Cite This Article

MDPI and ACS Style

Song, Z.; Liu, Q.; Hu, Z.; Li, H.; Xiong, J. Assessment of Sediment Impact on the Risk of River Diversion during Dam Construction: A Simulation-Based Project Study on the Jing River, China. Water 2018, 10, 217.

Show more citation formats Show less citations formats

Note that from the first issue of 2016, MDPI journals use article numbers instead of page numbers. See further details here.

Related Articles

Article Metrics

Article Access Statistics

1

Comments

[Return to top]
Water EISSN 2073-4441 Published by MDPI AG, Basel, Switzerland RSS E-Mail Table of Contents Alert
Back to Top