Skip to Content

Algorithms, Volume 8, Issue 1

2015 March - 6 articles

  • Issues are regarded as officially published after their release is announced to the table of contents alert mailing list .
  • You may sign up for email alerts to receive table of contents of newly released issues.
  • PDF is the official format for papers published in both, html and pdf forms. To view the papers in pdf format, click on the "PDF Full-text" link, and use the free Adobe Reader to open them.

Articles (6)

  • Article
  • Open Access
2 Citations
6,811 Views
22 Pages

The Parameterized Complexity of the Rainbow Subgraph Problem

  • Falk Hüffner,
  • Christian Komusiewicz,
  • Rolf Niedermeier and
  • Martin Rötzschke

27 February 2015

The NP-hard RAINBOW SUBGRAPH problem, motivated from bioinformatics, is to find in an edge-colored graph a subgraph that contains each edge color exactly once and has at most \(k\) vertices. We examine the parameterized complexity of RAINBOW SUBGR...

  • Article
  • Open Access
10 Citations
6,513 Views
14 Pages

13 February 2015

A graph is unipolar if it can be partitioned into a clique and a disjoint union of cliques, and a graph is a generalised split graph if it or its complement is unipolar. A unipolar partition of a graph can be used to find efficiently the clique numbe...

  • Article
  • Open Access
2 Citations
6,939 Views
14 Pages

9 February 2015

Synthetic aperture radar (SAR) image segmentation usually involves two crucial issues: suitable speckle noise removing technique and effective image segmentation methodology. Here, an efficient SAR image segmentation method considering both of the t...

(This article belongs to the Special Issue Advanced Data Processing Algorithms in Engineering)
  • Article
  • Open Access
26 Citations
8,859 Views
13 Pages

An Improved Shuffled Frog-Leaping Algorithm for Flexible Job Shop Scheduling Problem

  • Kong Lu,
  • Li Ting,
  • Wang Keming,
  • Zhu Hanbing,
  • Takano Makoto and
  • Yu Bin

4 February 2015

The flexible job shop scheduling problem is a well-known combinatorial optimization problem. This paper proposes an improved shuffled frog-leaping algorithm to solve the flexible job shop scheduling problem. The algorithm possesses an adjustment sequ...

(This article belongs to the Special Issue Advanced Data Processing Algorithms in Engineering)
  • Article
  • Open Access
23 Citations
7,644 Views
16 Pages

19 January 2015

The random time delay in a networked control system can usually deteriorate the control performance and stability of the networked control system. In order to solve this problem, this paper puts forward a networked control system random time-delay c...

XFacebookLinkedIn
Algorithms - ISSN 1999-4893