Energies 2015, 8(8), 8775-8797; doi:10.3390/en8088775

Analysis of Unit Process Cost for an Engineering-Scale Pyroprocess Facility Using a Process Costing Method in Korea

1
Korea Atomic Energy Research Institute, 1045 Daedeokdaero, Yuseong-gu, Daejeon 305-353, Republic of Korea
2
Department of Business and Technology Management, Korea Advanced Institute of Science and Technology, 291 Deahak-ro, Yuseong-gu, Daejeon 305-701, Republic of Korea
*
Author to whom correspondence should be addressed.
Academic Editor: Hiroshi Sekimoto
Received: 31 March 2015 / Revised: 3 August 2015 / Accepted: 14 August 2015 / Published: 18 August 2015
(This article belongs to the Special Issue Sustainable Future of Nuclear Power)
View Full-Text   |   Download PDF [4984 KB, uploaded 18 August 2015]   |  

Abstract

Pyroprocessing, which is a dry recycling method, converts spent nuclear fuel into U (Uranium)/TRU (TRansUranium) metal ingots in a high-temperature molten salt phase. This paper provides the unit process cost of a pyroprocess facility that can process up to 10 tons of pyroprocessing product per year by utilizing the process costing method. Toward this end, the pyroprocess was classified into four kinds of unit processes: pretreatment, electrochemical reduction, electrorefining and electrowinning. The unit process cost was calculated by classifying the cost consumed at each process into raw material and conversion costs. The unit process costs of the pretreatment, electrochemical reduction, electrorefining and electrowinning were calculated as 195 US$/kgU-TRU, 310 US$/kgU-TRU, 215 US$/kgU-TRU and 231 US$/kgU-TRU, respectively. Finally the total pyroprocess cost was calculated as 951 US$/kgU-TRU. In addition, the cost driver for the raw material cost was identified as the cost for Li3PO4, needed for the LiCl-KCl purification process, and platinum as an anode electrode in the electrochemical reduction process. View Full-Text
Keywords: pyroprocess facility; process costing method; First-In First-Out method; cost driver; unit process; unit cost pyroprocess facility; process costing method; First-In First-Out method; cost driver; unit process; unit cost
This is an open access article distributed under the Creative Commons Attribution License which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited. (CC BY 4.0).

Scifeed alert for new publications

Never miss any articles matching your research from any publisher
  • Get alerts for new papers matching your research
  • Find out the new papers from selected authors
  • Updated daily for 49'000+ journals and 6000+ publishers
  • Define your Scifeed now

SciFeed Share & Cite This Article

MDPI and ACS Style

Kim, S.; Ko, W.; Bang, S. Analysis of Unit Process Cost for an Engineering-Scale Pyroprocess Facility Using a Process Costing Method in Korea. Energies 2015, 8, 8775-8797.

Show more citation formats Show less citations formats

Related Articles

Article Metrics

Article Access Statistics

1

Comments

[Return to top]
Energies EISSN 1996-1073 Published by MDPI AG, Basel, Switzerland RSS E-Mail Table of Contents Alert
Back to Top