Buildings 2017, 7(3), 75; doi:10.3390/buildings7030075

Clash Detection or Clash Avoidance? An Investigation into Coordination Problems in 3D BIM

School of Civil and Building Engineering, Loughborough University, Loughborough LE11 3TU, UK
*
Author to whom correspondence should be addressed.
Received: 16 June 2017 / Revised: 16 July 2017 / Accepted: 10 August 2017 / Published: 21 August 2017
View Full-Text   |   Download PDF [3451 KB, uploaded 21 August 2017]   |  

Abstract

Early collaboration is crucial if the final design is to be clash-free, and automation processes through Building Information Modelling (BIM) have the capacity to reduce clashes through 3D design coordination. Yet, current design practices are still dependent on clash detection and contemporary literature presents several reasons for this. This paper investigates the root causes of clashes with respect to achieving “clash avoidance” as proposed in PAS 1192-2 design phase specifications for BIM in the UK. Empirical data from BIM coordinators around the world was collected and analyzed using explanatory sequential mixed-methods. It was found that: (i) isolated working was the prime cause of high occurrences of clashes linked to mechanical, electrical and plumbing (MEP) 3D BIM systems; (ii) there is a link between non-BIM specific training (or the professional qualifications) of design practitioners with the high incidence of clashes; and (iii) the current structure of cloud-based common data environments (CDEs) does not facilitate clash avoidance and in fact, encourages isolated working in the early design stage by creating “digital information silos”. A conceptual framework for an open work in progress (OWIP) has been proposed to address this problem. These findings point to the need for more transparency during collaboration through CDE where designers from multidisciplinary backgrounds can engage in concurrent co-creation. This transparent and inclusive process could have consequences on how future architectural, engineering and construction (AEC) professionals are trained. View Full-Text
Keywords: clash detection; clash avoidance; design coordination; MEP coordination; co-creation; common data environment clash detection; clash avoidance; design coordination; MEP coordination; co-creation; common data environment
Figures

Figure 1

This is an open access article distributed under the Creative Commons Attribution License which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited. (CC BY 4.0).

Scifeed alert for new publications

Never miss any articles matching your research from any publisher
  • Get alerts for new papers matching your research
  • Find out the new papers from selected authors
  • Updated daily for 49'000+ journals and 6000+ publishers
  • Define your Scifeed now

SciFeed Share & Cite This Article

MDPI and ACS Style

Akponeware, A.O.; Adamu, Z.A. Clash Detection or Clash Avoidance? An Investigation into Coordination Problems in 3D BIM. Buildings 2017, 7, 75.

Show more citation formats Show less citations formats

Note that from the first issue of 2016, MDPI journals use article numbers instead of page numbers. See further details here.

Related Articles

Article Metrics

Article Access Statistics

1

Comments

[Return to top]
Buildings EISSN 2075-5309 Published by MDPI AG, Basel, Switzerland RSS E-Mail Table of Contents Alert
Back to Top