Next Article in Journal
Using Different Migratory Game Bird Hunter Types to Explore Drivers of Support for Hunter Recruitment, Retention, and Reactivation Policies in North Carolina, USA
Next Article in Special Issue
Predicting Pavement Structural Condition Using Machine Learning Methods
Previous Article in Journal
The Effects of Travelers’ Price Sensitivity on Information Search Behaviors
Previous Article in Special Issue
Evaluation of Linear Deformation and Unloading Stiffness Characteristics of Asphalt Mixtures Incorporating Various Aggregate Gradations
 
 
Font Type:
Arial Georgia Verdana
Font Size:
Aa Aa Aa
Line Spacing:
Column Width:
Background:
Article

A Comparative Study of Probabilistic and Deterministic Methods for the Direct and Indirect Costs in Life-Cycle Cost Analysis for Airport Pavements

by
Peyman Babashamsi
1,2,
Shabir Hussain Khahro
3,*,
Hend Ali Omar
4,
Sri Atmaja P. Rosyidi
5,
Abdulnaser M Al-Sabaeei
1,
Abdalrhman Milad
6,
Munder Bilema
7,
Muslich Hartadi Sutanto
8 and
Nur Izzi Md Yusoff
1,*
1
Department of Civil Engineering, Universiti Kebangsaan Malaysia, Bangi 43600, Malaysia
2
Opus International (Malaysia) Berhad, Kuala Lumpur 58100, Malaysia
3
College of Engineering, Prince Sultan University, Riyadh 11586, Saudi Arabia
4
Department of Civil Engineering, University of Tripoli, Tripoli 22131, Libya
5
Department of Civil Engineering, Universitas Muhammadiyah Yogyakarta, Yogyakarta 55183, Indonesia
6
Department of Civil and Environmental Engineering, College of Engineering and Architecture, University of Nizwa, Birkat-al-Mouz, Nizwa 616, Oman
7
Department of Civil Engineering, University of Benghazi, Benghazi 1308, Libya
8
Department of Civil and Environmental Engineering, Universiti Teknologi Petronas, Seri Iskandar 32610, Malaysia
*
Authors to whom correspondence should be addressed.
Sustainability 2022, 14(7), 3819; https://doi.org/10.3390/su14073819
Submission received: 25 February 2022 / Revised: 17 March 2022 / Accepted: 19 March 2022 / Published: 24 March 2022
(This article belongs to the Special Issue Sustainability in Pavement Design and Pavement Management)

Abstract

:
Airports play a critical role in transporting goods and passengers and supporting the growth of the world economy. Airports spend huge sums annually to maintain and improve pavement functions by expanding the runways, taxiways, and aprons, and perform routine maintenance and rehabilitation of the existing pavements. Besides the traditional direct costs, a comprehensive airport pavement management system should also consider indirect costs such as fuel, crew, passenger delay, aircraft maintenance, and loss of airport revenue when conducting a life-cycle cost analysis (LCCA). Engineers, managers, and stakeholders can make better decisions on the appropriate pavement maintenance and rehabilitation strategies by performing economic analyses of the direct and indirect costs. This study performed probabilistic and deterministic LCCA to contrast the effect of direct costs vis-a-vis indirect costs in airport pavement management. A case study found that indirect costs could contribute up to 20% of the total costs when using Portland cement concrete (PCC), hot mixed asphalt (HMA), and crack seat overlay (CSOL). Previous research did not give much attention to maintenance since the researchers believed that routine maintenance makes up only an insignificant percentage of the LCCA. However, routine maintenance of HMA and CSOL makes up 10.2% and 14.2% of the total cost. The rehabilitation cost of PCC makes up 16.3% of the total cost, and the rehabilitation cost for HMA and CSOL makes up 25.4% and 35.2% of the total cost.

1. Introduction

The Federal Highway Administration (FHWA) introduced the life-cycle cost analysis (LCCA) to help decision-makers determine the best maintenance and rehabilitation (M&R) strategy during the pavement life-cycle [1,2]. Initially, it recommended considering the life-cycle cost in pavement management when designing a pavement [3]. The budget for future projects should include maintenance and rehabilitation (M&R) and traffic delay costs [4]. According to the Transportation Equity Act for the 21st Century (TEA-21), LCCA is “…a process for evaluating the total economic worth of a usable project segment by analyzing initial costs and discounted future costs, such as maintenance, user costs, reconstruction, rehabilitation, restoring, and resurfacing costs, over the life of the project segment” [2].
Pavement engineers use the Caltrans Highway Design Manual (HDM) Topics 612 and 619 to evaluate the cost-effectiveness of employing alternative pavement designs to construct, reconstruct, and rehabilitate new highways [5]. FHWA developed an LCCA software tool, Real Cost (version 2.5), in 2004 to provide support to those performing LCCA for highway projects [6].
The first step in LCCA is determining the schedule for the first and upcoming activities for implementing a particular option and estimating the cost of the activities. The projected life-cycle cost stream consists of the predicted time frame for each activity and its associated costs. Discounting is an economic analysis technique for converting all projected costs into the present dollar and summing the costs to obtain the net present value (NPV) or converting them into future cost prices and summing them to determine the net future value (NFV). When considering several comparable options for the same life-cycle period, the total benefits or costs are scrutinized to assess the most cost-effective option. [7,8,9,10,11,12,13,14] have published a comprehensive discussion on LCCA.
Because of the significantly reduced allocation for all projects, some airports depend on LCCA to make decisions [15]. The absence of systematic guidelines makes it very difficult to conduct LCCA for airports. As a result, the analysis should quantify operational delays by considering the indirect costs (user costs) [15,16]. The size of an airport, the hour of the day, pavement location, and sequence of pavement construction are among the factors influencing user costs, and the consequences could be substantial. According to Duval [17], closing one of the two runways at a medium-sized airport for reconstruction may result in airlines, incurring an operational cost of $30,000 per hour. The LCCA must consider this cost because it may influence the selection of pavement rehabilitation with a long construction period. The operational and societal analyses could demonstrate the importance of accelerated construction techniques over traditional strategies, even though they might be more expensive [18].
The Federal Aviation Administration (FAA) introduced AirCost, a probabilistic LCCA spreadsheet program, in 2011. Since then, many state airport management agencies have adopted and utilized this program [16]. Other airports have their spreadsheet programs. These programs are written to meet the agencies’ specific needs, and most do not consider the indirect costs. The disadvantage of using the AirCost program is that it ignores the insufficient probabilistic model by considering airport revenue reduction cost only as an indirect cost of the program.
LCCA was initially based on the cost–benefit analysis (CBA) of the 1950s that is considered when choosing a pavement design. The American Association of State Highway Officials (AASHO) Red Book 1960 established the economic evaluation of highway improvement at the planning level by introducing CBA in highway investment decisions. It significantly improved the LCCA by including the data for vehicle operating costs in a format that decision-makers could use to perform life-cycle cost analysis [19].
In 1977, FHWA instructed all agencies to evaluate the cost-effectiveness of pavement design [20]. Different versions of the AASHTO Pavement Design Guide [21,22] recommended using the life-cycle costing and discussed the fundamental reasons for including these costs in LCCA. The Long-Term Pavement Program (LTPP) and Strategic Highway Report Program (SHRP) were established in 1984 to develop an in-depth understanding of pavement behavior and an efficient system for managing highway infrastructures that do not require significant funding [23,24,25]. Carvetti and Owusu-Ababio [26] used the principles of LCCA to evaluate the pavement design alternatives for the Wisconsin DOT.
The focus of early research on pavement LCCA is qualified appraisals in various applications. The life cycle costs investigation by Fagen and Phares [27] focused on steel beam precast, concrete beam precast, and continuous concrete slab bridge deck for a low-volume roadway. Embacher and Snyder [28] focused on asphalt concrete and concrete for low-volume roads, while Zimmerman and Peshkin [29] employed LCCA to determine the optimal time for preventive maintenance. Huang et al. [30] designed a supportive decision network to identify the optimal concrete deck maintenance method. The primary input in LCCA is effective pavement maintenance or rehabilitation. It could be a short-term analysis of effective treatment, such as a slower rate of deterioration or improved performance, or a long-term assessment or evaluation of effective preservation [31].
The drawback of most previous research is treating the information parameters as deterministic qualities. The research focus in the past decade is to construct probabilistic approaches for dealing with uncertainties. Tighe [32], for example, collected empirical data to determine the cost and variation in pavement thickness. Generally, the log-normal distribution can explain the uncertainties when running a chi-square best-fit test. Salem et al. [33] used Weibull distribution to characterize uncertainties in the age of pavement failure. Osman [34] used Weibull distribution to develop a risk-based technique that only considers the uncertainties for pavement performance. Li and Madanu [35] described the cost uncertainty to demonstrate the life-cycle cost/benefit using, an eleven-year historical bid data from Indiana to characterize the unit cost of construction and maintenance activities using a Beta distribution. Even though these LCCA studies contributed significantly to the probabilistic LCCA, there is still a dearth of studies investigating the various input uncertainties.
These studies used Monte Carlo simulations to perform probabilistic LCCA because the final probability distribution can be assimilated from all iterations to describe the probability of an event [36]. Reigle and Zaniewski [37] used this approach to understand the risk of alternative investments. Risk is the potential disadvantage of investment that could lead to financial losses extensively discussed in finance literature [38]. The uncertainty in short-term and long-term costs of pavements suggests that the actual life-cycle costs for an alternative could be potentially higher (or lower) than expected.
Two important financial metrics for measuring the potential downside (or upside) of investment are the value at risk (VaR) and value at gain (VaG). According to De Neufville and Scholtes [38], VaR is the threshold value of an investment cost for a given probability.
The lowest cost alternative might not be the best option in every aspect since different factors, including the political and environmental concerns, available budget, risk, must be considered [8]. As a result, even though the data required for the decision-making process is gathered during the LCCA, it is not the end [39].
The critical assumption of all economic assessments of pavement projects is the constraints imposed by the allocated budget [40]. Some airports used LCCA as a decision-making tool due to the significant cut in the funding for all projects [15]. Agencies should assess their projects by considering the high potential savings achieved when adopting a cost-effective approach [41]. LCCA is one of the economic analyses employed by airports to evaluate pavement projects and reduce expenditure through prudent spending of the limited funds [42]. Decision-makers will be using LCCA more often as they practice the best asset management in the infrastructure life-cycle [43]. Using local pavement data to perform LCCA could give a more in-depth knowledge of pavement life-cycle performance and cost-effectiveness [37]. Implementing a cost-effective approach based on non-factual data could result in a poor outcome [44].
Although it is generally not easy to quantify operational and societal sustainability issues, it is possible when using the LCCA approach [15,16,44]. Because the lack of systematic guidelines makes it difficult to perform LCCA of airports, operational delays are quantified by including user costs in the analyses [15,16]. User costs are dependent on several factors, including airport size, the time during the day, pavement location, and the sequence of pavement construction; the impact of these factors could differ considerably.
Night-time construction or maintenance of non-essential segments (such as aprons) would probably cause a slight delay in the operating system. Because of this, the LCCA does not include user costs [45]. User cost is included in the LCCA when there is a significant operational delay because of the impact of selecting a pavement option with a long construction period.
The contribution of this study can be summarized by improving the indirect costs in the previous software by considering Airplane Delay Costs (ADC), which comprises fuel cost, crew cost, aircraft maintenance cost, passenger delay cost, and the compound and simple growth factor modes in the airport revenue reduction costs. It also improves the probabilistic model by including risk assessment in LCCA. Overall, it highlights the importance of indirect cost in airport pavement management.
In summary, LCCA could support and demonstrate the net benefits of selecting a particular option based on sustainability instead of opting for an option because of its lowest initial cost. It is essential to combine outputs with other elements, such as political and environmental concerns, risks, and the available budget resources [8]. The combined result of LCCA and LCA outputs provides pavement engineers with critical information on the impact of the pavement life cycle [46]. Therefore, this study aims to present a comprehensive LCCA in airport pavement management and prove the significance of indirect costs and maintenance activities in airport pavement management.

2. Methods

Airport pavement projects involve long periods of planning, designing, contracting, and construction. After the budget allocation, the initial design of airport pavements considers the project aims, requirements, and limitations based on the current information. The following stage focuses primarily on determining the type of pavement and M&R activities for the pavement project [47]. Agencies that do not have sufficient data should carry out probabilistic LCCA for each alternative. Otherwise, deterministic LCCA is performed with sensitivity analysis to determine the impacts of the various critical input data, such as discount rate and initial pavement service life.
Even though experience-based estimates can be used to quantify the LCCA inputs, it is essential to use all available, applicable, and reliable data in the analysis. The result of LCCA is only as good as the quality of the inputs. Figure 1 illustrates the process for carrying out LCCA for airport pavement LCCA using the AirCost program.

2.1. Estimation of the Direct Costs

2.1.1. Physical Costs of Pavement Activities

The best way to evaluate physical costs is by identifying the adequate and trustworthy unit cost data for pay items that contribute to the initial construction and all M&R treatments. These data are available in the historical bid records of construction projects for recent years (ideally, the previous seven years). The unit cost data is also available at the local highway agencies. A better unit cost appraisal employs the unit price data from the lowest bid or the three lowest bids for the projects. Each unit price should be converted to the present day to represent the effect of inflation, and analysis should focus on filtering out biased costs in projects for out-of-range quantities of a specific pay item. The formula for direct cost is given by Equation (1). Rehabilitation comprises two parts, with salvage value and without salvage value.
NPV Physical   Cost = 1 K Cost IC 1 [ 1 + i dis ] n + 1 k Cost M j 1 [ 1 + i dis ] n + 1 k Cost NR j 1 [ 1 + i dis ] n + 1 k Cost SR j 1 [ 1 + i dis ] n  
where:
idis = Discount Rate
n = Year – Analysis Base Year
j = number of maintenances or rehabilitations
k = number of activities in each life-cycle event
Cost IC   = Unit Costk × Quantityk (for initial construction)
Cost M j = Unit Costk × Quantityk (for each maintenance)
Cost NR j = Unit Costk × Quantityk (for items with no salvage value)
Cost SR j   = Unit Costk × Quantityk (for items with salvage value)

2.1.2. Salvage Value at the End of the Life-Cycle

The current FAA guideline recommends calculating salvage value based only on the serviceable life [16]. Figure 2 shows that the salvage value is the cost of the last rehabilitation activity multiplied by the ratio of the remaining pavement life divided by its total expected rehabilitation life, as given by Equation (2). The differential salvage value between pavement options is usually not significant, and when discounted over long periods, tends to have less impact on the LCCA output.
NPV Salvage   Value = SV × 1 [ 1 +   i dis ] AP + ( Initial   Construction   Year Base   Year )
where:
SV = Salvage Value
idis = Discount Rate
AP = Analysis Period
Figure 2. The remaining life salvage value.
Figure 2. The remaining life salvage value.
Sustainability 14 03819 g002

2.1.3. Supplementary Costs

The evaluation of supplementary expenses is complex and time-consuming. However, an alternative method for determining supplementary costs is to consider them as a rate of the total project-level pavement costs (usually 5%).

2.2. Estimation of the Indirect Costs

Indirect costs are the highest costs incurred by most airport management systems. Some APMS only consider airport revenue reduction cost (ARRC) in simple growth rate and do not consider airplane delay cost (ADC). In 2007, airport delays cost the economy approximately $40.7 billion [48]. This study considers two specific user costs as the total cost borne by users during reconstruction and M&R activities. Although previous studies include users in airport revenue reduction, additional user costs, including fuel, crew, maintenance, and passenger delay costs, should be appropriately calculated in LCCA.

2.2.1. Airport Revenue Reduction Cost (ARRC)

Each option involves different construction activities (initial construction/rehabilitation and future M&R) during their life-cycle and could result in reduced daily revenue during the construction and rehabilitation activities.
It is worth noting that, as a primary element of an LCCA, it is essential to convert the revenue reduction costs related to future planned activities since all costs must be discounted to today’s values. Equation (3) gives the user cost of ARRC for all options.
NPV ARRC = ARRC IC × 1 [ 1 + i dis ] n + ARRC M j × 1 [ 1 + i dis ] n + ARRC R j × 1 [ 1 + i dis ] n  
where:
j = number of maintenance or rehabilitation
ARRC = Airport Revenue Reduction Cost
The analyzer can choose one of two growth modes, the simple mode given by Equation (4), or the compound mode given by Equation (5).
ARRC simple = AAR × ( 1 + ni R ) × RR × Duration   of   Construction 365
  ARRC Compound = AAR × ( 1 + i R ) n × RR × Duration   of   Construction 365
where:
AAR = Airport Annual Revenue ($)
n = Year – Analysis Base Year
iR = Annual Revenue Growth Rate (e.g., 5% = 0.05)
RR = Revenue Reduction (%)

2.2.2. Airline Delay Cost (ADC)

The present study also considers airline delay costs. The EU and most American APMS use the tactical gate-to-gate delay when considering delay cost. The EU report classified delay as tactical delay (the delays that are longer than the announced schedule, which exceed the anticipated padding of the schedule) and strategic delay (the delay relative to an unpadded schedule). Another classification includes gate-to-gate delay (or single flight) and network-level delay [49].
Gate-to-gate delay is an environmental situation that causes an unexpected delay and may affect any flight.
Network delay is the impact of a single flight on the rest of the system.
This study only considers the direct costs of such delays on an individual airplane. The model proposed by Ferguson et al. [49] is the most comprehensive and is given by Equation (6); this model comprises two types of delays, short-time delay (15 min or less), and long-time delay (65 min or longer). Interpolation is used for delays of between 15 and 65 min. The ADC is calculated using Equation (7) and discounted using Equation (8).
C delay = C fuel × FBR × FP + C crew × CC × ( No : of   Crew ) + C maintenance × MC + C pax × PAX × ( No : of   seats ) + C other × OC
ADC = C delay × ADT × ( No : of   total   flight   per   day ) × DC
NPV ADC = ADC IC × 1 [ 1 +   i dis ] n + ADC M j × 1 [ 1 +   i dis ] n + ADC R j × 1 [ 1 +   i dis ] n
where:
FBR = Fuel Burn Rate
FP = Fuel Price
CC = Crew Cost
MC = Maintenance Cost
PAX = Passenger Delay cost
OC = Other Costs
Cfuel = Coefficient of fuel cost
Ccrew = Coefficient of crew cost
Cmaintenance = Coefficient of maintenance cost
Cpax = Coefficient of passenger delay cost
Cother = Coefficient of other costs
Cdelay = Coefficient of delay
ADT = Airplane Delay Time
DC = Duration of construction
Ferguson et al. [49] included the imputed cost factor in their data to validate the cost factors. The researchers applied the formulas to the US data and noted a difference between the US and European frameworks. One difference is the result of the EU Passenger Bill of Rights, which makes the passenger payback costs borne by the airlines in the US much lower than those in the EU. Because airplanes in the US spend more time taxiing at airports than in Europe, air traffic management enforces more scheduled ground delays on airlines to ensure a short circling at the destination airport. According to the EU report, the duration of circling delay is greater than the taxiing delay for European airlines. Further scrutiny of the cost factors revealed the following costs:
Extra Fuel Cost: Each type of airplane is assigned a fuel burn rate based on arrival management (Gate-to-Gate), as shown in Table 1.
Extra Crew Cost: This is the additional expense paid to the cabin crew and flight attendants. Unforeseen delays may require the service of extra flight attendants and cabin crew or making an additional payment to the regular crews for the extra hours they have to work.
Extra Maintenance Cost: Maintenance cost is the expense of repairing the body kit and engine power. The additional upkeep costs incurred for each minute of delay is about 15% of the Block Hour Direct Operating Cost (BHDOC), as shown in Table 1.
Passenger Delay Cost (PAX): This cost is the payback portion of the ticket fees made by the airlines to travelers whose flights are delayed. The value ranges from 0.05 for a 15-min delay to 0.48 for a 65-min delay. Table 2 shows the coefficient of PAX for Europe and the US.
This study uses the cost factors from the BTS P52 database (2014) (maintenance costs, crew costs, and extra fuel costs) and the industry white paper aircraft operating and delay cost per enplanement.

3. Background of the Case Study

The basic data used in this case study is the serviceability data of a PCC pavement runway at the end of its service life. The functional unit is a 1-km (3280.84 ft) overlay system of the PCC runway pavement that is 61 m (200 ft) wide, making the pavement area 61,000 m2 (72,954.7 yd2). The PCC pavement comprises a 250-mm (10 in) PCC layer and 250-mm (10 in) crushed aggregate base course. The PCC layer is near the end of its useful life and requires rehabilitation to extend its service life. The base course is in good condition and does not require extensive maintenance work. The three reconstruction alternatives available are as follows.
  • Remove the existing pavement but retain the subgrade layers. Place a new layer of 300 mm (12 in) PCC.
  • Remove the present pavement but retain the existing base and subgrade layers. Place a layer of 250 mm (10 in) of HMA. This option uses mill-and-fill as periodic rehabilitation.
  • Crack, seat, and overlay (hereafter called CSOL). The existing PCC pavement is cracked and seated [50] and overlaid with 150 mm (6 in) of HMA. This option uses mill-and-fill as periodic rehabilitation.
The three pavements overlay designs follow the AASHTO pavement design guideline. Table 3 lists the structural design of the three overlay system options.
According to the Airport Cooperative Research Program (ACRP) [51], the rehabilitation of concrete slab is carried out every 18–20 years, and the diamond-grind surface has an average life of 16–20 years [5]. Thus, PCC rehabilitation activity is carried out every 20 years. The mill-and-fill activity for HMA and CSOL is carried out every 15 years [52,53]. The maintenance and rehabilitation schedule are adopted from the Jefferson County (Colorado) airport. Table 4 shows the maintenance and rehabilitation works, and Figure 3 shows the time frame. The three critical factors for this method are direct costs, indirect costs, and salvage value. Even though the base year for analysis is 2016, the construction began in 2018.

3.1. Direct Cost Input Data

The analysis period is 40 years. The deterministic LCCA projects use the 4% typical discount rate for recent years. For the probabilistic LCCA, the mean discount rate is 4%, and the standard deviation is 1%. Table 5 shows the mean for pay item costs and the M&R schedule for all options. The probabilistic method considers a 10% standard deviation for each item cost variation.
The unit cost values are based on the mean cost of pay items at the Jefferson County airport system bid tabs between 2006 and 2016, and all values were converted to the 2016 costs. PCC does not have salvage value because of the 40 years analysis period and design life. However, the five-year residual value for HMA and CSOL was calculated. This study used Monte Carlo simulation to determine the best option.

3.2. Indirect Costs Input Data

Each airport has two user costs, the airport revenue reduction cost (ARRC) that resulted from the total or partial closure of the runway, taxiway, or apron, and the airplane delay cost (ADC) that impact airlines as the primary airport user. Table 6 shows the other user costs, including revenue reduction, duration of construction, and airplane delay time information for all alternatives.
The assumptions for the user cost analysis for the three options are as follows.
  • Generally, the exact annual revenue is confidential and dependent on the size of the airport and the number of flights and passengers. It is between $10–15 million for medium-sized international airports. A $12 million total annual revenue is assume.
  • The revenue growth is 5% in compound mode. Revenue growth should be higher than or equal to the discount rate, or else it is not feasible to implement the project.
  • Medium-sized international airports handle 300 flights per day, and each flight has 155 seats.
  • The annual and monthly airplane fuel prices are available at 28 January 2021 http://www.transtats.bts.gov/fuel.asp. This study takes the 2016 annual fuel price as $0.37 per liter ($1.40 per gallon).
  • Unlike in Europe, US airlines do not pay PAX.
  • Airplane crew cost varies depending on the level of responsibility. This study assumes a mean crew cost of $0.3 (30 cents) per minute, and each flight has ten crew members.
  • Airplane maintenance cost is dependent on the selected type of airplane (mean number of seats). The analyzer can modify this value.

4. Results

4.1. LCCA Deterministic Outputs

In a conventional deterministic approach, the most critical factor when determining the appropriate method is the mean of the results (single value). Table 7 shows that the direct cost of PCC is $5,553,558, $5,055,028 for HMA, and $3,645,643 for CSOL. After deducting the salvage values, the cost for HMA and CSOL is $4,972,093 and $3,562,708. In terms of the mean NPV, the cost for CSOL is 35.8% and 28.3%, less than for PCC and HMA. Unlike earlier management software, it is essential to represent the user cost analysis in PAVECO comprehensively. Table 7 shows that CSOL has lower ARRC and ADC than the other options. The percentage of indirect cost for ADC for all options is higher than for ARC. HMA and CSOL have a higher ADC for rehabilitation, and the percentage for initial construction for PCC is higher than ADC.
Most previous research did not focus on maintenance since routine maintenance is considered less important in LCCA. However, Table 7 shows that the maintenance cost of HMA and CSOL makes up 10.2% and 14.2% of the total costs; the rehabilitation value in PCC is 16.3% of the total cost, and 25.4%, and 35.2% in HMA and CSOL. These percentages indicate that it is crucial to include routine maintenance in pavement airport management. The maintenance cost in HMA and CSOL does not affect user costs, since these activities do not affect the annual revenue and airplane delay costs because of its short duration of construction. Table 8 shows the direct costs and salvage values of all activities.
It is worth noting that the present study considers the indirect costs in LCCA even though previous studies only include ARRC as the user cost. The present study has demonstrated the importance of ADC in LCCA. Table 7 shows that ADC is about 15 times higher than ARRC. Including ADC in the indirect costs increased the percentage to 19.1% of the total direct costs for all alternatives, which is why previous studies excluded indirect costs in airport pavement management. Including only ARRC in the direct cost does not have any significant impact compared to the high impact of the direct costs. Maintenance activities do not affect ADC because the short duration of the maintenance activities does not affect the flight schedule.
It is not practical to compare the procedures using special tools since the results depend on the different system boundaries, scopes, and measures. The difference in the employed tools could eclipse the distinctions in the procedures and distort the results. While using one single tool to analyze the options is the better choice, this approach has risks, including uncertainty and data quality. The data quantification method and the data selected for estimation and detail could influence the results when comparing analysis tools. It is essential to carefully weigh and verify the scope, system boundary, and data quality before conducting or using software output to ensure they are compatible with the projects’ goals.

4.2. LCCA Probabilistic Outputs

The outcomes of risk analysis go beyond comparing the options to determine which option has the lowest average costs by expanding the probability analysis that any expected result will happen. There is no assumption that a specific option is beneficial. Risk analysis provides much more data than a basic deterministic approach. Table 9 shows the additional statistical values obtained from a simulation that revealed the hidden uncertainty associated with each option.
Figure 4 shows the range of possible outcomes displayed with the estimated probability of every occurrence. The highlighted standpoint of the histogram shows the variation of the probabilistic mean of each option. The graph with broader distribution has higher variation, indicating higher uncertainty. Figure 4 shows that HMA has the highest uncertainty.
The slope of the cumulative curve represents the uncertainty for each option. A steep slope indicates a low variation, and a gradual slope indicates a high uncertainty. Figure 5 illustrates the risk profiles of the three options in a cumulative diagram. The steeper slope for PCC indicates its low uncertainty relative to HMA and CSOL. The up-side and down-side risk is a critical factor in interpreting a risk assessment. The downside risk for the total costs indicates the probability of financial failure (over-run). The upside risk of the total costs means that the total costs may be lower than the mean cost (under-run). In this study, the probability of upside risk (under-run) is about 65% for CSOL, 55% for HMA, and 45% for PCC.
Figure 6 and Figure 7 show the uncertainty for two components of indirect costs, namely the airport reduction revenue costs (ARRC) and airplane delay costs (ADC).

4.3. LCCA Sensitivity Analysis

Sensitivity analysis can complement risk assessment. The sensitivity analysis of the simulation outputs can identify the input variables required to determine the resulting distributions. A high correlation coefficient indicates the higher significance of an input variable. All tornado plots in Figure 8 use a rank-order correlation that considers the assumption about the correlation between the input and output variables. A correlation coefficient less than 0.6 is generally insignificant [14].
The correlation coefficient for initial agency costs in PCC and HMA is high, but is less than 0.6 for CSOL. The correlation coefficient for the M&R agency cost is high for all options, but not significant. An increase of one unit in the initial construction year and the discount year has a negative effect on LCCA. Postponing the project for a year or increasing the discount rate by 1% reduced the NPV by 4 to 10%. A 1% increase in revenue growth rate results in a 6 to 10% growth in the NPV for all options, whereas a 2% increase in the revenue growth rate could result in a 45% growth because of the compounded revenue growth mode.
Future studies can improve the LCCA for airports by investigating or developing methods that consider network delay in the system and expanding the probabilistic analysis of the delay costs. Another way to improve airport LCCA is by separately expanding the methods for quantifying the initial construction, maintenance, and rehabilitation and presenting them clearly in the results. Finally, researchers could use a dynamic programming algorithm to optimize the maintenance schedule.

4.4. Verification of the Results Using Different Software

In 2011, the ARA consultant developed the AirCost software for performing the LCCA of airport pavements. Table 10 shows a comparison of the programs in terms of LCCA scope and output.
The present study discusses the LCCA results in terms of the data sources, data range, input variation, and probabilistic analysis, and compares the tools used in a project. The results indicate that analysts should be cautious of the system boundary, data sources, and limitations when using the software to compare alternatives. Table 11 presents the results of cost analysis using different software.
Figure 9 shows a screenshot of the results from AirCost that used the limited probabilistic method to compare four user-selected points. The AirCost results in the table do not present the considered risk assessment of the alternatives. The most significant difference between the outputs of the two programs is user cost, where PAVECO analyzed ARRC and ADC, whereas AirCost only considered ARRC. The difference in the ARRC is because the duration of maintenance activities in AirCost is dependent on the primary initial or rehabilitation activity. However, the maintenance in PAVECO could have differing revenue reductions and durations because it considers maintenance the primary, independent activity. Since the direct costs and salvage value are similar for both analyses, they could validate the PAVECO outputs.

5. Conclusions

This study performed probabilistic and deterministic life-cycle cost analysis (LCCA) to contrast the effect of direct costs vis-à-vis indirect costs in airport pavement management. In this comprehensive model, the direct costs comprise the physical cost, salvage value, and supplementary costs, and the indirect costs are airport revenue reduction cost (ARRC) and airplane delay costs (ADC). The primary indirect cost in the previous pavement management systems is ADC as the primary user in the airports. ADC consists of the delay items related to fuel, crew, passenger, and maintenance delay costs in the system.
The results showed that ADC is a significant user cost and is usually higher than ARRC (more than 15 times) during the pavement life-cycle. The indirect costs for all three alternatives that include ADC in the calculation indicate the importance of including user costs in LCCA to managers, engineers, and stakeholders. Even though decision-makers often ignore indirect costs, this case study has shown that indirect costs make up 19.1, 12.1%, and 14.2% of the total direct costs in Portland cement concrete (PCC), hot mixed asphalt (HMA), and crack seat overlay (CSOL). The analysis also showed that PCC has higher ARRC and ADC. The LCCA method can separately analyze the direct and indirect costs of the initial construction, maintenance, and rehabilitation to illustrate the financial impact of each activity in the project framework. Most previous research did not consider maintenance cost, since routine maintenance makes up a small percentage of LCCA. However, maintenance cost makes up 10.2% and 14.2% of the total cost in HMA and CSOL, while the rehabilitation cost for PCC, HMA, and CSOL is 16.3%, 25.4%, and 35.2% of the total costs. These percentages underscore the importance of considering routine maintenance in airport pavement management. This study found a 35% probability of downside risk (overrun) for CSOL, 45% for HMA, and 55% for PCC. Future research could investigate network-level delays and the subsequent economic costs on different industries and businesses.

Author Contributions

Conceptualization, writing—original draft preparation and methodology, P.B.; Validation and review S.H.K.; Software, H.A.O.; Formal analysis, S.A.P.R.; Investigation and resources, A.M.A.-S.; data curation, A.M.; Visualization, M.B.; project administration, M.H.S.; Supervision and writing—review and editing, N.I.M.Y. All authors have read and agreed to the published version of the manuscript.

Funding

The authors would like to express their gratitude to Universiti Kebangsaan Malaysia for providing financial support for this work (DIP-2020-003).

Institutional Review Board Statement

Not applicable.

Informed Consent Statement

Not applicable.

Data Availability Statement

The data can be provided on request from corresponding authors.

Acknowledgments

The authors would like to acknowledge the support of Prince Sultan University for expert support and paying the Article Processing Charges (APC) of this publication.

Conflicts of Interest

The authors declare no conflict of interest.

References

  1. Babashamsi, P.; Yusoff, N.I.; Ceylan, H.; Nor, N.G.; Salarzadeh Jenatabadi, H. Sustainable Development Factors in Pavement Life-Cycle: Highway/Airport Review. Sustainability 2016, 8, 248. [Google Scholar] [CrossRef] [Green Version]
  2. FHWA. Towards Sustainable Pavement Systems: A Reference Document, FHWA-HIF-15-002; Federal Highway Administration: Washington, DC, USA, 2015. [Google Scholar]
  3. Akbarian, M.; Swei, O.; Kirchain, R.; Gregory, J. Probabilistic Characterization of Life-Cycle Agency and User Costs: Case Study of Minnesota. J. Transp. Res. Rec. 2017, 2639, 93–101. [Google Scholar] [CrossRef]
  4. Zaki, B.M.; Babashamsi, P.; Shahrir, A.H.; Milad, A.; Abdullah, N.H.; Hassan, N.A.; Yusoff, N.I.M. The impact of economic analysis methods on project decision-making in airport pavement management. J. Teknol. 2021, 83, 11–19. [Google Scholar] [CrossRef]
  5. Caltrans. Annual Average Daily Truck Traffic on the California State Highway System; California Department of Transportation: Los Angeles, CA, USA, 2010. [Google Scholar]
  6. FHWA. Life-Cycle Cost Analysis: RealCost User Manual Version 2.5; Federal Highway Administration: Washington, DC, USA, 2010. [Google Scholar]
  7. ACPA. Life-Cycle Cost Analysis: A Tool for Better Pavement Investment and Engineering Decisions, Engineering Bulletin EB011; American Concrete Pavement Association: Rosemont, IL, USA, 2011. [Google Scholar]
  8. FHWA. Life-Cycle Cost Analysis Primer, FHWA-IF-02-047; Federal Highway Administration: Washington, DC, USA, 2002. [Google Scholar]
  9. FHWA. Life-Cycle Cost Analysis for INDOT Pavement Design Procedures, FHWA/IN/JTRP-2004/28; Project No. C-36-63Q, File No. 9-7-18, SPR-2712; Federal Highway Administration: Washington, DC, USA, 2004. [Google Scholar]
  10. NHI. Fundamentals of Life-Cycle Cost Analysis, National Highway Institute Course No. 13113, Participant Workbook, FHWA-NHI-09-024; National Highway Institute: Arlington, VA, USA, 2008. [Google Scholar]
  11. Riggs, J.L.; West, T.M. Essentials of Engineering Economics, 3rd ed.; McGraw-Hill Publishing: New York, NY, USA, 2008. [Google Scholar]
  12. Di Mascio, P.; Antonini, A.; Narciso, P.; Greto, A.; Cipriani, M.; Moretti, L. Proposal and Implementation of a Heliport Pavement Management System: Technical and Economic Comparison of Maintenance Strategies. Sustainability 2021, 13, 9201. [Google Scholar] [CrossRef]
  13. Swei, O.; Gregory, J.; Kirchain, R. Construction cost estimation: A parametric approach for better estimates of expected cost and variation. Transp. Res. B-Meth. 2017, 101, 295–305. [Google Scholar] [CrossRef]
  14. Walls, J.; Smith, M.R. Life Cycle Cost Analysis in Pavement Design-Interim Technical Bulletin; The United States. Federal Highway Administration: Washington, DC, USA, 1998. [Google Scholar]
  15. Pittenger, D. Evaluate airport pavement maintenance/preservation treatment sustainability using life-cycle cost, raw material consumption and ‘greenroads’ standards. J. Transp. Res. Rec. 2011, 2206, 61–68. [Google Scholar] [CrossRef]
  16. ARA. Life Cycle Cost Analysis for Airport Pavements, Airfield Asphalt Pavement Technology Program (AAPTP) Report 06-06; Applied Research Associates: Auburn, AL, USA, 2011. [Google Scholar]
  17. Duval, J. Asphalt keeps aircraft flying at Boeing field. Asphalt 2007, 22, 22–25. [Google Scholar]
  18. Peshkin, D.G.; Hoerner, T.E.; Zimmerman, K.A. Optimal Timing of Pavement Preventive Maintenance Treatment Applications; Transportation Research Board: Downers Grove, IL, USA, 2004. [Google Scholar]
  19. Winfrey, R.E. Motor Vehicle Running Costs for Highway Economy Studies; Winfrey: Washington, DC, USA, 1963. [Google Scholar]
  20. Anderson, D.; Peterson, D.; Sheppard, L.; Sy, C. Pavement Design Rehabilitation Strategies; Project FHWA/UT-79-6, Utah DOT; Government Publications Clearinghouse: Springfield, VA, USA, 1979. [Google Scholar]
  21. AASHTO. Guide for Design of Pavement Structures; American Association of State Highway and Transportation Officials: Washington, DC, USA, 1986. [Google Scholar]
  22. AASHTO. Guide for Design of Pavement Structures Part 1, Chapter 3, Life Cycle Cost Analysis for Pavements; American Association of State Highway and Transportation Officials: Washington, DC, USA, 1993. [Google Scholar]
  23. Hadley, W.O. SHRP-LTPP General Pavement Studies: A Five-Year Report; Texas Research and Development Foundation: Texas, TX, USA, 1994. [Google Scholar]
  24. Hanna, A.N.; Tayabji, S.D.; Miller, J.S. SHRP-LTPP Specific Pavement Studies: Five-Year Report; National Academy of Sciences: Washington, DC, USA, 1994. [Google Scholar]
  25. Smith, R.; Freeman, T.; Pendleton, O. Pavement Maintenance Effectiveness; Strategic Highway Research Program, National Research Council: Washington, DC, USA, 1993. [Google Scholar]
  26. Crovetti, J.A.; Owusu-Ababio, S. Investigation of Feasible Pavement Design Alternatives for WisDOT. The Unit; Marquette University: Milwaukee, WI, USA, 1999. [Google Scholar]
  27. Fagen, M.; Phares, B. Life-cycle cost analysis of a low-volume road bridge alternative. J. Transp. Res. Rec. 2000, 1696, 8–13. [Google Scholar] [CrossRef]
  28. Embacher, R.A.; Snyder, M.B. Life-cycle cost comparison of asphalt and concrete pavements on low-volume roads; case study comparisons. J. Transp. Res. Rec. 2001, 1749, 28–37. [Google Scholar] [CrossRef]
  29. Zimmerman, K.A.; Peshkin, D.G. Applying pavement preservation concepts to low-volume roads. J. Transp. Res. Rec. 2003, 1819, 81–87. [Google Scholar] [CrossRef]
  30. Huang, Y.H.; Adams, T.M.; Pincheira, J.A. Analysis of life-cycle maintenance strategies for concrete bridge decks. J. Bridge Eng. 2004, 9, 250–258. [Google Scholar] [CrossRef]
  31. Prarche, S. Infrastructure management and the use of public-private partnerships. In Proceedings of the CSCE Annual General Meeting and Conference, Yellowknife, NT, Canada, 15 November 2007. [Google Scholar]
  32. Tighe, S. Guidelines for probabilistic pavement life cycle cost analysis. J. Transp. Res. Rec. 2001, 1769, 28–38. [Google Scholar] [CrossRef]
  33. Salem, O.; AbouRizk, S.; Ariaratnam, S. Risk-based life-cycle costing of infrastructure rehabilitation and construction alternatives. J. Infrastruct. Syst. 2003, 9, 6–15. [Google Scholar] [CrossRef]
  34. Osman, H. Risk-based life-cycle cost analysis of privatized infrastructure. Transp. Res. Rec. 2005, 1924, 192–196. [Google Scholar] [CrossRef]
  35. Li, Z.; Madanu, S. Highway project level life-cycle benefit/cost analysis under certainty, risk, and uncertainty: Methodology with the case study. J. Transp. Eng. 2009, 135, 516–526. [Google Scholar] [CrossRef]
  36. Wang, H.; Wang, Z. Deterministic and probabilistic life-cycle cost analysis of pavement overlays with different pre-overlay conditions. Road Mater. Pavement Des. 2017, 20, 58–73. [Google Scholar] [CrossRef]
  37. Reigle, J.A.; Zaniewski, J.P. Risk-based life-cycle cost analysis for project-level pavement management. J. Transp. Res. Rec. 2002, 1816, 34–42. [Google Scholar] [CrossRef]
  38. De Neufville, R.; Scholtes, S. Flexibility in Engineering Design; MIT Press: Cambridge, MA, USA, 2011. [Google Scholar]
  39. Liu, R.; Smartz, B.W.; Descheneaux, B. LCCA and environmental LCA for highway pavement selection in Colorado. Int. J. Sustain. Eng. 2015, 8, 102–110. [Google Scholar] [CrossRef]
  40. Sinha, K.C.; Labi, S. Transportation Decision Making: Principles of Project Evaluation and Programming; John Wiley & Sons: Hoboken, NJ, USA, 2011. [Google Scholar]
  41. Peshkin, D.G.; Bruinsma, J.E.; Wade, M.J.; Delatte, N.J. Accelerated Practices for Airfield Concrete Pavement construction. Volume I: Planning Guide, Report IPRF-01-G-002-02; National Academy of Sciences: Skokie, IL, USA, 2006. [Google Scholar]
  42. Pasupathy, R.; Labi, S.; Sinha, K.C. Optimal reconstruction periods for stochastically deteriorating infrastructures. Comput.-Aided Civ. Infrastruct. Eng. 2007, 22, 389–399. [Google Scholar] [CrossRef]
  43. Ozbay, K.; Jawad, D.; Parker, N.A.; Hussain, S. Life-cycle cost analysis: State of the practice versus state of the art. J. Transp. Res. Rec. 2004, 1864, 62–70. [Google Scholar] [CrossRef]
  44. Bilal, K.M.; Irfan, M.; Labi, S. Comparison of methods for evaluating pavement interventions: Evaluation and case study. J. Transp. Res. Rec. 2009, 2108, 25–36. [Google Scholar]
  45. Gransberg, D.D.; Scheepbouwer, E. Infrastructure asset life cycle cost analysis issues. Transactions 2010, 3. [Google Scholar]
  46. Rangan, G.K.; Thompson, M.R. Severity effects of dual-tandem and dual-tridem repeated heavier aircraft gear loading on pavement rutting performance. Int. J. Pavement Eng. 2006, 7, 179–190. [Google Scholar]
  47. APA. American rides on us asphalt. In Life Cycle Cost Analysis: A Position Paper, APA. IM 53; Asphalt Pavement Alliance: Lanham, MD, USA, 2001. [Google Scholar]
  48. Schumer, C.E.; Maloney, C.B. Your Flight Has Been Delayed Again: Flight Delays Cost Passengers, Airlines, and the US Economy Billions; The US Senate Joint Economic Committee, 2008. [Google Scholar]
  49. Ferguson, J.; Kara, A.Q.; Hoffman, K.; Sherry, L. Estimating domestic US airline cost of delay based on the European model. Transp. Res. Part C Emerg. Technol. 2013, 33, 311–323. [Google Scholar] [CrossRef] [Green Version]
  50. Halil, C.; Coree, B.J.; Gopalakrishnan, K.; Mathews, R.; Kota, T. Rehabilitation of Concrete Pavements Utilizing Rubblization and Crack and Seat Methods; CTRE Project 02-106; Iowa State University: Ames, IA, USA, 2005. [Google Scholar]
  51. Hajek, J.J. Common Airport Pavement Maintenance Practices; Transportation Research Board: Washington, DC, USA, 2011. [Google Scholar]
  52. Weiland, C.; Muench, S.T. Life-cycle assessment of reconstruction options for interstate highway pavement in Seattle, Washington. J. Transp. Res. Rec. 2010, 2170, 18–27. [Google Scholar] [CrossRef]
  53. Zhang, H.; Keoleian, G.A.; Lepech, M.D.; Kendall, A. Life-cycle optimization of pavement overlay systems. J. Infrastruct. Syst. 2010, 16, 310–322. [Google Scholar] [CrossRef] [Green Version]
Figure 1. The process for conducting airport pavement LCCA.
Figure 1. The process for conducting airport pavement LCCA.
Sustainability 14 03819 g001
Figure 3. Reconstruction and M&R schedules for PCC, HMA, and CSOL.
Figure 3. Reconstruction and M&R schedules for PCC, HMA, and CSOL.
Sustainability 14 03819 g003
Figure 4. Histogram of the NPV for PCC, HMA, and CSOL.
Figure 4. Histogram of the NPV for PCC, HMA, and CSOL.
Sustainability 14 03819 g004
Figure 5. The cumulative risk profile of NPV for PCC, HMA, and CSOL.
Figure 5. The cumulative risk profile of NPV for PCC, HMA, and CSOL.
Sustainability 14 03819 g005
Figure 6. Histogram curve for the airport revenue reduction cost.
Figure 6. Histogram curve for the airport revenue reduction cost.
Sustainability 14 03819 g006
Figure 7. Histogram curve for the airplane delay cost.
Figure 7. Histogram curve for the airplane delay cost.
Sustainability 14 03819 g007
Figure 8. Correlation sensitivity plot for the NPVs for all options.
Figure 8. Correlation sensitivity plot for the NPVs for all options.
Sustainability 14 03819 g008
Figure 9. AirCost probabilistic results for PCC, HMA, and CSOL.
Figure 9. AirCost probabilistic results for PCC, HMA, and CSOL.
Sustainability 14 03819 g009
Table 1. The fuel burn rate and maintenance costs for different types of airplanes due to delay [49].
Table 1. The fuel burn rate and maintenance costs for different types of airplanes due to delay [49].
Airplane ModelNo. of SeatFuel Burned
(kg/h)
Fuel Burn Rate
(gal/min)
BHDOCMaintenance Cost
(per min)
ATR 42453922.12510376.5
ATR72605042.73100465.0
B737-500100253013.84550682.5
B737-300125273114.84950742.5
B737-400140258814.15280792.0
A320155207411.34790718.5
A321165262514.25690853.5
B737-800175218711.94040606.0
B757-200215278915.25960894.0
B767-300240390821.275901138.5
Table 2. The coefficients for various cost factors for the EU and US.
Table 2. The coefficients for various cost factors for the EU and US.
Cost
Factor
EuropeThe US
GateTaxiEn-RouteGateTaxiEn-Route
156515651565156515651565
Fuel001111001111
Crew00.8500.8500.8500.8500.8500.85
Maintenance0.020.050.020.050.020.050.020.050.020.050.020.05
PAX111111000000
Table 3. Structural design of PCC, HMA, and CSOL for runway reconstruction.
Table 3. Structural design of PCC, HMA, and CSOL for runway reconstruction.
PCCHMACSOL
300 mm (12 in) PCC250 mm (10 in) HMA150 mm (6 in) HMA
250 mm (10 in) existing PCC
Table 4. Reconstruction and M&R activities for PCC, HMA, and CSOL.
Table 4. Reconstruction and M&R activities for PCC, HMA, and CSOL.
PCCHMACSOL
ReconstructionReconstructionReconstruction
Main 1:
Crack and Joint sealing
Main 1: Crack sealingMain 1: Crack sealing
Main 2: Crack sealingMain 2: Crack sealing
Main 3: Seal coatMain 3: Seal coat
Main 4: Crack sealingMain 4: Crack sealing
Rehab 1:
Crack and Joint sealing + Spall Repair +
50% slab replacement
Rehab 1:
150mm mill and new AC
Rehab 1:
Full-depth mill and new AC
Main 1:
Crack and Joint sealing
Main 1: Crack sealingMain 1: Crack sealing
Main 2: Crack sealingMain 2: Crack sealing
Main 3: Seal coatMain 3: Seal coat
Main 5: Crack sealingMain 5: Crack sealing
Rehab 2:
150 mm mill and new AC
Rehab 2:
Full-depth mill and new AC
Main 1: Crack sealingMain 1: Crack sealing
Main 2: Crack sealingMain 2: Crack sealing
Main 3: Seal coatMain 3: Seal coat
Table 5. Initial and M&R unit costs for PCC, HMA, and CSOL.
Table 5. Initial and M&R unit costs for PCC, HMA, and CSOL.
PCCHMACSOL
Cost for Initial Construction
PCC removal, $11.00/m2
PCC paving, $190.00/m3
Electrical, $320,000.00/km
Restripe, $12,000.00/km
PCC removal, $11.00/m2
HMA paving, $140.00/m3
41,640 L of tack coat, $0.25/L
Geotextile, $1.80/m2
Electrical, $320,000.00/km
Restripe, $12,000.00/km
Crack and seat, $2.00/m2
Surface preparation, $1.00/m2
HMA Ppaving, $140.00/m3
41,640 L of tack coat, $0.25/L
Electrical, $320,000.00/km
Restripe, $12,000.00/km
Cost of Maintenance
Crack and joint sealing, $3.00/m2 Crack sealing, $2.00/m2
Seal coat, $1.00/m2
Crack sealing, $2.00/m2
Seal coat, $1.00/m2
Cost of Rehabilitation
Spall repair, $5.00/m2
Slab replacement, $200/m3
Restripe, $12,000.00/km
HMA removal, $5.00/m2
HMA paving, $140.00/m3
41,640 L of tack coat, $0.25/L
Restripe, $12,000.00/km
HMA removal, $5.00/m2
HMA paving, $140.00/m2
41,640 L of tack coat, $0.25/L
Restripe, $12,000.00/km
Table 6. User costs input data for PCC, HMA, and CSOL.
Table 6. User costs input data for PCC, HMA, and CSOL.
AlternativesEventsRevenue Reduction (%)Duration of Construction (Day)Airplane Delay Time (min)
PCCReconstruction25715
Maintenance 1010
Maintenance 2010
Rehabilitation 110310
HMAReconstruction15410
Maintenance 1010
Maintenance 2010
Maintenance 3010
Maintenance 4010
Rehabilitation 110310
Maintenance 5010
Rehabilitation 210310
CSOLReconstruction10310
Maintenance 1010
Maintenance 2010
Maintenance 3010
Maintenance 4010
Rehabilitation 110310
Maintenance 5010
Rehabilitation 210310
Table 7. LCCA deterministic results for PCC, HMA, and CSOL ($1000).
Table 7. LCCA deterministic results for PCC, HMA, and CSOL ($1000).
OptionActivityDirect CostsIndirect CostsSalvage Value
ARRCADC
PCCInitial414258.6879.20.0
Maintenance166.50.00.0
Rehabilitation980.612.2114.6
Total5553.6 a70.8993.8
HMAInitial3012.920.1334.982.9
Maintenance516.70.00.0
Rehabilitation1284.725.0217.0
Total5055.0 a45.1551.9
CSOLInitial1670.710.0251.282.9
Maintenance516.70.000.0
Rehabilitation1284.725.0217.0
Total3645.6 a35.0468.2
Table 8. Direct costs of PCC, HMA, and CSOL ($1000).
Table 8. Direct costs of PCC, HMA, and CSOL ($1000).
AlternativeActivityYear 1 [ 1 + i d i s ] n CostNPV
PCCReconstruction20.924480.04142.0
Maintenance 1120.62183.0114.3
Rehabilitation220.422324.0976.1
Maintenance 1320.29183.052.2
Salvage Value420.190.00.0
HMAReconstruction20.923258.83012.9
Maintenance 160.79122.096.4
Maintenance 2100.68122.082.4
Maintenance 3110.6561.039.6
Maintenance 4140.58122.070.5
Rehabilitation 1170.511609.0826.0
Maintenance 1210.44122.053.5
Maintenance 2250.38122.045.8
Maintenance 3260.3661.022.0
Maintenance 5290.32122.039.1
Rehabilitation 2320.291609.0458.7
Maintenance 1360.24122.029.7
Maintenance 2400.21122.025.4
Maintenance 3410.2061.012.2
Salvage Value420.19−1292.0−829.4
CSOLReconstruction20.921807.01670.7
Maintenance 160.79122.096.4
Maintenance 2100.68122.082.4
Maintenance 3110.6561.039.6
Maintenance 4140.58122.070.5
Rehabilitation 1170.511609.0826.0
Maintenance 1210.44122.053.5
Maintenance 2250.38122.045.8
Maintenance 3260.3661.022.0
Maintenance 4290.32122.039.1
Rehabilitation 2320.291609.0458.7
Maintenance 1360.24122.029.7
Maintenance 2400.21122.025.4
Maintenance 3410.20122.012.2
Salvage Value420.19−1292.0−829.4
Table 9. The results of probabilistic LCCA for PCC, HMA, and CSOL ($1000).
Table 9. The results of probabilistic LCCA for PCC, HMA, and CSOL ($1000).
OptionsStatisticsDirect CostIndirect CostSalvage Value
ARRCADC
PCCMean5606.271.4999.20.0
Std. dev.460.05.156.60.0
Min.4918.863.763.70.0
Max.6501.181.281.20.0
HMAMean5143.946.6562.696.0
Std. dev.625.99.174.651.0
Min.4239.533.9455.233.1
Max.6401.365.4712.7212.2
CSOLMean3733.936.5478.996.0
Std. dev.589.68.872.451.0
Min.2890.524.3375.133.1
Max.4927.454.9625.1212.2
Table 10. Comparison of the scope and analysis of LCCA.
Table 10. Comparison of the scope and analysis of LCCA.
ToolScopeAnalysisOutput
Direct CostsIndirect CostsSalvage Value
PAVECOAgency Costs
Supplementary Costs
Airport Revenue Reduction Cost
Fuel Delay Cost
Crew Delay Cost
Passenger Delay Cost
Airplane Delay Maintenance Cost
Residual ValueRisk Assessment ProbabilisticTable
Curve
Histogram
Cumulative
Graph
AirCostAgency Costs
Supplementary Costs
Airport Revenue Reduction CostResidual ValueLimit ProbabilisticTable
Table 11. Comparison of the LCCA output ($1000).
Table 11. Comparison of the LCCA output ($1000).
ToolOptionScope
Direct CostsIndirect CostsSalvage Value
ARRCADC
PAVECOPCC5554719940.0
HMA50554555283
CSOL36463546883
AirCostPCC545864N/A0.0
HMA503342N/A87
CSOL369733N/A87
Publisher’s Note: MDPI stays neutral with regard to jurisdictional claims in published maps and institutional affiliations.

Share and Cite

MDPI and ACS Style

Babashamsi, P.; Khahro, S.H.; Omar, H.A.; Rosyidi, S.A.P.; M Al-Sabaeei, A.; Milad, A.; Bilema, M.; Sutanto, M.H.; Yusoff, N.I.M. A Comparative Study of Probabilistic and Deterministic Methods for the Direct and Indirect Costs in Life-Cycle Cost Analysis for Airport Pavements. Sustainability 2022, 14, 3819. https://doi.org/10.3390/su14073819

AMA Style

Babashamsi P, Khahro SH, Omar HA, Rosyidi SAP, M Al-Sabaeei A, Milad A, Bilema M, Sutanto MH, Yusoff NIM. A Comparative Study of Probabilistic and Deterministic Methods for the Direct and Indirect Costs in Life-Cycle Cost Analysis for Airport Pavements. Sustainability. 2022; 14(7):3819. https://doi.org/10.3390/su14073819

Chicago/Turabian Style

Babashamsi, Peyman, Shabir Hussain Khahro, Hend Ali Omar, Sri Atmaja P. Rosyidi, Abdulnaser M Al-Sabaeei, Abdalrhman Milad, Munder Bilema, Muslich Hartadi Sutanto, and Nur Izzi Md Yusoff. 2022. "A Comparative Study of Probabilistic and Deterministic Methods for the Direct and Indirect Costs in Life-Cycle Cost Analysis for Airport Pavements" Sustainability 14, no. 7: 3819. https://doi.org/10.3390/su14073819

Note that from the first issue of 2016, this journal uses article numbers instead of page numbers. See further details here.

Article Metrics

Back to TopTop