Supplementary data for "Feasibility-Driven Assembly and Welding Planning for a Dual-Robot Steel Fabrication Cell" (revision 1)

S1_planner_budget_sweep.csv       Repeated planner-budget sweep (Section 6.3, Figure 8): planner, budget, repetition, status, parts placed, wall-clock.
S2_torch_census_per_seam.csv      Torch pre-validation census (Section 6.4, Figure 11a): surviving orientations per seam out of 600.
S3_seam_modes.csv                 Seam welding-mode census in the CAD pose (Section 6.4, Figure 11b).
setup_coverage_siteB_full_sweeps.json     Six fully swept work orders (Section 6.1, Table 2): setups tried, parts, best single, production pair, greedy pair, best pair, union.
setup_coverage_siteA_production_plans.json  250 distinct assembly designs from site A (Section 6.1, Table 3): parts, setups in the selected plan, best single, plan union, number of series records merged. Designs are re-indexed A001-A250.
ablation_runs.json                Component ablations on the rebuilt stack (Section 6.5, Table 7): condition, repetition, parts placed, wall-clock.

Assembly identifiers for site B are the short drawing marks used in the paper (1R1, 1S20, 3SA21, 9SA32, SC3, SK2); site A assemblies are re-indexed. Site names, customer names, and part identifiers are omitted throughout.
