Next Article in Journal
Exploring Railway Network Dynamics in China from 2008 to 2017
Next Article in Special Issue
Extracting Indoor Space Information in Complex Building Environments
Previous Article in Journal
A Methodology for Planar Representation of Frescoed Oval Domes: Formulation and Testing on Pisa Cathedral
Previous Article in Special Issue
Processing BIM and GIS Models in Practice: Experiences and Recommendations from a GeoBIM Project in The Netherlands
Article Menu

Export Article

Open AccessArticle
ISPRS Int. J. Geo-Inf. 2018, 7(8), 319; https://doi.org/10.3390/ijgi7080319

BIM-GIS Integration as Dedicated and Independent Course for Geoinformatics Students: Merits, Challenges, and Ways Forward

1
Chair of Geoinformatics, Technical University of Munich, 80333 Munich, Germany
2
Urban Planning Engineering, An-Najah National University, P.O. Box 7 Nablus, Palestine
*
Author to whom correspondence should be addressed.
Received: 31 May 2018 / Revised: 25 July 2018 / Accepted: 5 August 2018 / Published: 8 August 2018
View Full-Text   |   Download PDF [1481 KB, uploaded 8 August 2018]   |  

Abstract

Information mined from building information models as well as associated geographical data and Geographic Information System (GIS) analyses can increase the success of construction processes and asset management, including buildings, roads, and public facilities. The integration of information from both domains requires high expertise in both spheres. The existing B.Sc and M.Sc. programs linked to the built environment at the Technical University of Munich offer courses for the Building Information Model (BIM) and GIS that are distributed among study programs in Civil Engineering, Architecture, and Geomatics. Students graduating as professionals in one of these domains rarely know how to solve pre-defined technical problems associated with the integration of information from BIM and GIS. Students in such programs seldom practice skills needed for the integration of information from BIM and GIS at a level that is needed in working life. Conversely, the technologies in both domains create artificial boundaries that do not exist in reality—for example, water and electricity would not be of use if the utilities terminated in front of buildings. To bring a change and bridge the gap between BIM and GIS, a change in the teaching methods of BIM/GIS needs to be considered. The Technical University of Munich (TUM) has developed a master’s course (M.Sc. course) for students in Geoinformatics which focuses on competencies required to achieve BIM/GIS integration. This paper describes the course development process and provides a unique perspective on the curriculum and subjects. It also presents the course objective, course development, the selection and development of learning materials, and the assessment of the intended learning outcome of the course. The developed course is validated through a questionnaire, and feedback is provided by participants of the BIM/GIS integration workshop representing a panel of experts in the domain. View Full-Text
Keywords: BIM/GIS integration; GIS; CAD; course development BIM/GIS integration; GIS; CAD; course development
Figures

Figure 1

This is an open access article distributed under the Creative Commons Attribution License which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited. (CC BY 4.0).
SciFeed

Share & Cite This Article

MDPI and ACS Style

Hijazi, I.; Donaubauer, A.; Kolbe, T.H. BIM-GIS Integration as Dedicated and Independent Course for Geoinformatics Students: Merits, Challenges, and Ways Forward. ISPRS Int. J. Geo-Inf. 2018, 7, 319.

Show more citation formats Show less citations formats

Note that from the first issue of 2016, MDPI journals use article numbers instead of page numbers. See further details here.

Related Articles

Article Metrics

Article Access Statistics

1

Comments

[Return to top]
ISPRS Int. J. Geo-Inf. EISSN 2220-9964 Published by MDPI AG, Basel, Switzerland RSS E-Mail Table of Contents Alert
Back to Top