Analysis and Potential Application of the Maturity of Growth Management in the Developing Construction Industry of a Province of China: A Case Study

1
School of Economics and Management, Chang’an University, Middle Section of South Second Ring Road, Xi’an 710064, China
2
School of Civil Engineering, Chang’an University, No. 161, Chang’an Road, Xi’an 710061, China
3
College of Engineering, University of Alaska Anchorage, 2900 Spirit Dr., Anchorage, AK 99504, USA
*
Authors to whom correspondence should be addressed.
Sustainability 2017, 9(1), 143; https://doi.org/10.3390/su9010143
Submission received: 19 July 2016 / Revised: 10 January 2017 / Accepted: 11 January 2017 / Published: 19 January 2017
(This article belongs to the Section Economic and Business Aspects of Sustainability)

Abstract

:
Construction industry is one of the major drivers of the economic sustainability of China’s provinces. An investigation of the status of the construction industry in China is needed to find out its maturity and health. The results of this investigation may help China define the impact factors required in order to promote the growth level of its construction industry. This research assesses the growth level of the construction industry in Shaanxi Province, China. This study utilizes both the original average score method and the newer entropy method to analyze the growth level of the construction industry based on its growth management model and growth drivers. An empirical survey of this research includes 123 construction companies in Shaanxi Province. The results show that the entropy method is better than the average score method to use when analyzing the maturity status of a local industry for future development. The maturity level of Shaanxi’s construction industry lies on the second tier in a four-tier ranking system. The advanced professional skills of project management are critically needed for future growth. Brand building is the most important factor needed to drive up Shaanxi’s construction industry. Standardization, knowledge management through lessons learned, and cost management for budget control by using information systems are required for Shaanxi’s construction project management. The Excellent Project Management Model of China is often used in Chinese project knowledge management. After maturity analysis, China’s local industries would be able to develop a sustainable strategy for optimizing their outcomes by removing the hurdles preventing future growth.

1. Introduction

China’s construction sector is now crucial to the country’s economic development, while competition has become significant and aggressive. Although China’s construction market is fairly new, it is already the largest in the world in terms of development potential and profitability. China’s government applies its central, provincial and local management model to regulate its construction industry. The Ministry of Construction is the main supervisor in the sector through the effective application of three major laws: construction law, contract law and tendering and bidding law. These regulations allow companies to operate as commercial entities, mainly through competitive bidding [1].
In general terms, China’s construction sector is comprised of companies primarily engaged in the construction of buildings and other structures, additions, alterations, renovations, installations, maintenance, and repairs. China’s construction industry includes three distinct categories of enterprises: state-owned companies, urban and rural collectives, and rural construction teams, and despite the declining significance of foreign direct investment in the sector, the latest official data also consider foreign-funded companies as representative elements in the sector’s growth.
As one of the most protected industries, which include automobiles, civil aviation, telecommunications, construction, steel, insurance, and energy in China, the construction industry undergoes sophisticated restructuring despite the general need to follow new patterns of industrial growth management. China’s construction sector very much depends on its national macroeconomic policy, which in recent times has led to an upsurge of domestic demand and investment in infrastructure, more precisely in construction materials, equipment, and design services. Local governments, which tend to be the major investors in infrastructure, are the largest end users of construction materials and equipment.
However, China’s construction sector is still labor-intensive, whereas it needs to gradually move into being technology-intensive in order to increase its international competitiveness [2]. Despite the growth of construction companies in China, there are only a few large and profitable enterprises that can influence and lead the industry or otherwise compete in the international market. From the perspective of competitiveness, the development of the construction industry is extremely unbalanced among the provinces in that a few are very developed, yet most are underdeveloped. Thus there is a development gap between the provinces as two provinces are the most developed in the construction industry and ten provinces are still developing; Shaanxi Province belongs to the latter category. Thus the growth management of China’s construction industry needs to emphasis each province’s context in order to understand its status in the transition period and to achieve a comprehensive upgrade.
This research proposes a new theoretical framework to analyze the maturity status of a local industry for future development and compares the results of the original growth management model with the new entropy method. The research results may be a good foundation in understanding the transition process of construction industry management in China when developing its management strategy. They are particularly useful to similar industries which may need improvement in developing their own approaches to managing economic sustainability.
The literature review in Section 2 surveys the drivers of the construction industry and growth management model as it applies to China. Section 3 provides the methodology of this research. Section 4 applies the methodology to analyze the growth stage of the construction industry and the corresponding top influencing factors. Section 5 presents the conclusions and highlights the implications for construction industry maturity analysis in a transitional economy.

2. Literature Review

Due to the widespread construction and overheating process derived from excessive investment, effective growth management in the civil engineering sector has been particularly imperative in the past decade. As construction industry managers often cannot clearly understand their own industry’s status, it creates an iterating process throughout its industrial growth, and of course, internal barriers may be dominant caused by government policy initiative. According to previous research [2,3,4,5,6,7,8,9,10,11], several causes may be put forward to explain the barriers of construction industry growth management in the transition process.
First, the traditional argument is that a fair environment for innovation, specific brand-building strategy, capital-intensive project management, and project management information system are still in their infancy. These are the main factors restricting the transformation and upgrading of the construction industry. This argument explains the reason for much of the slow improvement and low implementation efficiency of industrial growth at the time of transition and shortly after that period. However, since the modernization of the construction market and the adoption of benchmarked project management, the explanatory power of this traditional argument decreases, although it does not vanish. Second, the barrier of construction industry growth management may be caused by the lack of skilled workers at the provincial level. A typical example of this is the low level of low carbon building technology investment [12,13,14] and its corresponding lack of talent support [15].
Additionally, considering the crucial importance of the construction industry in China’s path to economic transition, the 2014 guidelines for promoting the development and reform of the construction industry issued by the Ministry of Housing and Urban-Rural Development of the People’s Republic of China (MOHURD, P. R. China) state that provinces, autonomous regions, and municipalities may use the actual situation to propose the self-augmenting reform policies and measures in order to support the transformation of construction enterprise. This should then achieve the success results of sustainable growth. According to the thirteenth five-year plan transition pilot program in construction, Shaanxi Province has also been listed to carry out the pilot reform and development of its construction industry, complying with the 2014 guidelines of MOHURD, P. R. China.
Stubbs and Cocklin (2008) discuss organizational development needs in view of the balance between economic and environmental impacts by using the sustainability business model [16]. Wang (2016) has developed a procedure for the analysis of sustainable development, which includes accountability, predictability, balanceability, and policy (APBP), as shown in Figure 1 [17]. In this research, focus has been placed on the maturity of the construction industry based on the accountability analysis of the maturity of this industry. The rising need to quantitatively assess the levels and target the impact factors as a way of improving the construction industry’s sustainable development has become one of the dominant best practice requirements in the construction industry over recent years in both a national and international context [18,19].
Attention should be given to the fact that there is a clear gap between the different levels in the process of organizational maturity, and as a result, a methodology is needed to predict the level of the local industry [21,22]. The method of using the targeted impact factors may be far too generic to be utilized by practitioners seeking to implement the specific growth management of the construction industry in order to ensure its sustainable development [23,24]. Usually, companies in the transition phase cannot see their way to upgrade to the next level [19,25,26,27,28,29,30,31,32,33]. The growth management model (GMM) has been adopted to form an integrated organizational diagnosis framework to analyze the growth management of the petroleum industry in China [34].
Determination of the level of growth in China’s construction industry has a political connotation [3]. In recent years, policy makers have repeatedly designed strategic programs to trigger growth at the central, provincial, and local levels. This research provides a theoretical framework and case study to explore the growth of China’s construction industry at the provincial level.

2.1. Growth Driversof the Construction Industry

The growth drivers of the construction industries, such as the influences of technological innovation and strategies to transparently build up a company’s drivers in order to overcome the difficulties in the transformation period, have caught the attention of researchers [35,36,37]. Growth drivers also may include renovating construction patterns, integrating external information, implementing project knowledge management, and developing the brand [19,38,39,40,41]. The competitive advantages of the updated industry are based on the efficient use of internal resources, such as capital, workforce, technological innovation, and knowledge integration of brand building. For example, technological innovation may lead the transformation and improve the capability of enterprises [42,43]. The acquisition and implementation of talent helps enterprise transformation [44]. Undoubtedly, a well-designed brand is needed to provide values to consumers in the construction service market. The brand of a construction enterprise also requires high-quality projects, outstanding corporate culture, thoughtful customer service, and advanced management systems.
On the micro level, construction companies may have similar drivers in the growth process. For example, Han and Ofori (2001) [3] have studied the relationship between the development of the construction industry and local economic growth. Iammarino et al. (2012) [45] have researched the relationship between companies’ technological capabilities and their locations. Dick and Payne (2005) [46] and Herliana (2015) [47] have studied local development and the growth of clusters of small and medium enterprises. They all state that at the local level, growth could be accelerated by certain factors. They also note that with a clear process, construction industry growth management is increasingly recognized as a central competitive advantage in embracing sustainability. However, Dick et al., argue that there is compelling evidence that as the construction industry wrestles with the challenge of building a sustainable organization, it should clearly know at what growth level it is and then focus on the core issues in order to proceed with the appropriate steps. Nevertheless, for local construction companies, there is a lack of systematic framework for growth drivers that can be used effectively in practice to analyze the growth level of the construction industry. Thus, it is urgent to thoroughly understand the sustainable processes to implement change. This is because of the following: (a) Growth management of the local construction industry is needed to justify the enterprises’ growth drivers and to realize that their levels are influenced by their specific impact factors; (b) Impact factors are targeted in the corresponding phase of construction industry management; and (c) Successful countermeasures are needed to iterate industrial growth management through local construction company feedback. As described above, the growth path of the local construction industry has been established for industrial policymakers in order that they achieve self-augmentation of their industry management. This provides a quantitative way to service a repeatable and scalable industry growth management model of sustainable construction industry.
Laihonen et al. (2015) developed case-specific cornerstones of growth-oriented knowledge management. The results of their research show that there are two knowledge issues that arise when dealing with growth management. The first issue concerns whether or not an organization has the needed knowledge resources to enable growth, and the second issue is the need for management to have relevant and real-time information in order to make informed decisions [48]. AlQahtany et al., used Delphi techniques to propose a framework of sustainable development that focused on environmental, social, economic and urban planning issues [49]. However, these models are neither focused on the construction industry nor can be used to analyze its maturity. McIntyre [20] explains a process for finding out the appropriate level of the growth management model (GMM) through a consortium of industry advisory boards, committees, and councils; the American Council for Construction Education has chosen this model as a standard. This model pays much attention to internal sustainable management in order to pursue an organization’s growth and has been widely facilitated in organizational process management, such as sustainable growth management of organizational diagnosis [34]. Thus, our research uses growth drivers in China’s construction industry plus GMM to form a theoretical framework. Our study also implements the data of previous research to further analyze the growth path position of construction industry management, which forms a complementary profile of the internal driver levels to explain Shaanxi’s construction industry management.

2.2. Growth Management Model (GMM)

Growth managementis one core part of the sustainable growth of an industry, which is increasingly recognized as a central determinant for economic sustainability. In order to analyze the growth management of an industry, Charles McIntyre (2015) [20] suggests using an industry advisory board (IAB) to propose an IAB GMM model for analyzing the organizational growth stage. Like Charles McIntyre‘s statement, the GMM framework roots itself in basic management theory which is applicable to any business or organization. Focusing on the internal and evolutionary growth which occurs within industry, the GMM model is generic in nature and refers to any industry. Charles McIntyre was aware of this and provided a structured and sequential approach to improving managerial proficiency with the ultimate goal of enhancing outcomes by means of models that are similar to IAB GMM. As a managerial instrument, the GMM model is designed to enhance the proficiency of an organization which is attempting to improve organizational outcomes.
As an organization’s managerial proficiency improves, organizational outcomes increase before reaching new stability zones/levels. Transition periods may result in interpersonal conflicts because of new expectations and higher anticipated efficiencies. During the transition periods, IAB members are typically asked to step out of their personal comfort zones and meet new challenges. In this process, GMM provides a fundamental theory to understand the significance of effective managerial proficiency. In an organization’s GMM framework, the vertical axis represents managerial proficiency, and the horizontal axis relates to an organization’s outcomes. The relationship between managerial proficiency and organizational outcomes is expressed by a series of plateau levels, such as IAB Level I, which are linked by transition periods. During the period of transition, the organization needs to change until it approaches the next managerial proficiency level. These four management plateaus represent the IAB GMM model outcomes which can be achieved at each level of managerial proficiency. These plateaus are stability levels where the IAB outcomes match the organization’s managerial proficiency exactly, as shown in Figure 2. Consistent with the generic thinking of the IAB GMM, this research modifies the corresponding four levels of construction industry growth management to form a new integrated diagnostic model for local construction industry transition. As the integrated model indicates in Figure 2, the vertical axis represents managerial proficiency, and the horizontal axis shows instrument scores.
In order to respond to the growth level question of the construction industry, McIntyre has adopted the concepts of the framework of GMM [20] to match the construction industry’s transition to a stage of sustainable economic development. The research of Zhang et al. (2016) has integrated IAB GMM into an extended Weisbord’s Six-Box Model to form a sustainable growth diagnosis framework, which has been used to investigate one of China Petro sub-companies as an empirical case study [34]. According to existing research of growth drivers, four levels of construction industry growth management have been redeveloped by renovating construction patterns, integrating external information, implementing project knowledge management, and building the brand, which are all primary components of managerial proficiency of construction industry transition needed for sustainable development. In addition, construction industry transition outcomes are defined as the number and quality of best practices conducted by local construction industry within these four proficiency levels.

2.3. Analysis of the Maturity of Growth Management

This research has developed a theoretical framework of the general underlying mechanisms of maturity analysis as shown in Figure 3. Within this framework it can be seen that transition process description and quantitative assessment have the same implications for the development of a local construction industry. The goals of the research approach are to create an understanding of the theoretical framework of construction industry growth management in the transition period and to structure the findings obtained in this case study.

3. Methodology

In order to justify the validity of the original GMM framework by using an average score method, according to the American Council of Construction Education (ACCE), we chose the entropy method as the proposed alternative to comparatively analyze the growth management position in order to target the transition step in the sustainable development of the construction industry transition process. The entropy method [50,51,52] is an objective approach reflecting the disorder degree of information in not only information theory but also in the expansion of social and economic areas [50,51,53,54,55] where the weights of individual indicators are determined by calculating the entropy and entropy weight. The greater the entropy is, the smaller the corresponding entropy weight. If the entropy weight is zero, it provides no useful information to the decision-maker, and this indicator may be removed. The amount of useful information that the target provides to the decision-maker is objective. Thus, using the entropy method to determine index weights could reflect an objective and realistic information-derived GMM system of construction industry transition.

3.1. Average Score Method

According to Charles McIntyre (2015), the main steps in obtaining the average score to evaluate the GMM Level of the local construction industry are shown as follows [20]:
(1) Calculating the average score of total samples
Suppose there are m units and n indicators to be evaluated to establish the sum in Equation (1).
Z F i = t = 1 n f s t
where s = 1, 2, 3, ..., m; t = 1, 2, 3, ..., n; Z F s = the score sum of sth sample; f s t = the tth index score of sth sample. Then the average score of m units is calculated in Equation (2).
f = s = 1 m Z F s / m
(2) Grading the GMM level of the local construction industry
When the average score is calculated, we apply it to grade the WSBGMM level.
According to the IABGMM model [20], suppose that there is K = 5 (where A = 5 represents strong disagreement to E = 5 representing strong agreement) scaling of each indicator in each unit, then there are 5 (K = 5) levels to be graded for the sample. The scope of each level is shown in Table 1.
In the case of the average score method, it is assumed that the index weight probability of each sample at each level is equally allocated to generate the total sample level in the WSBGMM model. Actually, the index weight is objectively constrained by the sample score, which is the reason why we have used another method, namely the entropy method, to calculate the WSBGMM level to arrive at more accurate assessment results.

3.2. Entropy Method

The main four steps of entropy method [50,56] are shown as follows:
Step 1: The formation of the evaluation matrix
Suppose there are also m units and n indicators to be evaluated in order to establish the original data matrix in Equation (3).
R = ( r n ) m × n ( s = 1 , 2 , m ; t = 1 , 2 , n )
where r s t represents the actual value of the tth index of sth unit.
Step 2: The standardization of the evaluation matrix
The following equation is used to normalize the matrix B ,
B = ( b n ) m × n ( s = 1 , 2 , m ; t = 1 , 2 , n )   with   b s t = r s t r m i n r m a x r m i n
where r m a x and r m i n represent the maximum and minimum values respectively for the evaluation unit.
If indicator is the positive tropism (+)
b s t = r s t r m i n r m a x r m i n
If indicator is the negative tropism (–)
b s t = r m a x r s t r m a x r m i n
Step 3: The calculation of the entropy
The entropy of the system can be defined by using the following calculations:
H t = ( s = 1 m f s t l n f s t ) / ln m ( s = 1 , 2 , m ; t = 1 , 2 , n )
where, f s t = b s t / s = 1 m b s t if f s t = 0 , redefine the f s t as:
f s t = ( 1 + b s t ) / s = 1 m ( 1 + b s t )
Step 4: The calculation of the entropy weight
w = ( ω t ) 1 × n , ω t = ( 1 H t ) / ( n t = 1 n H t )   with   t = 1 n ω t = 1
Step 5: Use to Entropy weight to calculate the score of WSBGMM level
s f = i = 1 n ω i f i
where, ω i = the entropy weight of the ith index, and f i the score of the ith index.
Step 6: Grade the level
According to the average score method above, the entropy method to grade the GMM level of the construction industry growth management is shown in Table 2.

3.3. Targeted with Impact Factor

As stated previously, looking at the top impact barriers and finding targeted solutions in the current organizational level is a good way to promote a sustainable path for an organization. This research uses the major impact index formula [52,57,58,59] to generate and compare the impact extent of the indices, which are shown Equation (9).
A i = ω i d i / i = 1 n ω i d i × 100 %
A i represents the indices’ impact extent, ω i represents the index entropy weight, d i represents the index standardization value, and n represents the index number in the evaluation system of WSBGMM.
As to the use of the average score method to calculate the top impact barriers, the index is allocated to the average weight. Thus the top impact barrier formula with the average score method is shown in Equation (10).
A i = d i i = 1 n d i × 100 %

4. Implementation

4.1. Data Collection

This research uses data collection from prior research that focused on obtaining the understanding of growth drivers that may help to promote the transformation of the local construction industry at the company level. In addition, China’s economy is driven primarily by the policy and management of local governments, resulting in the transitional status of the local construction industry. Thus, using a survey design, we collected data from 123 local construction companies located in China’s Shaanxi Province to explain the growth level of its construction industry growth management. The Shaanxi Construction Association has been responsible for the forum of construction industry growth management annually supported by the provincial government in Shaanxi. With the help of the Shaanxi Construction Association, we randomly selected 1200 companies from the Shaanxi 2014 Yellow Pages Commercial/Industrial Telephone Directory [59,60,61,62]. We made telephone calls to the top administrator of each company to explain the purpose of the study and to solicit agreement for survey participation. Of the 1200 companies, 300 agreed to participate. We then hand delivered a total of 300 questionnaires to the top administrator in each company. A telephone follow-up was conducted within two weeks to make sure that it was the top administrator (i.e., general or deputy-general manager) who provided the information. In many cases, the research company sent representatives to meet the top administrators of the companies to explain how the data would be used, to answer any questions, and to collect the finished questionnaires. This was an important step toward obtaining high-quality data in China [63,64]. Overall, a total of 145 questionnaires were issued, of which 123 were completed correctly. With an 84.83% response rate, the data collection met the requirement of sample size (i.e., at least 100) in order to analyze the common problems in economic and social areas [65,66].
Following the prior research design shown in Figure 3 in Section 2.3, we developed a questionnaire with (a) item analysis (T-test (p< 0.05) [65,66]); (b) reliability analysis (Cronbach’s α > 0.80); (c) item total correlation analysis, the threshold value of which was conducted between 0.3 and 0.5 [66]; (d) exploratory factor analysis (EFA) (KMO > 0.9 and Eigenvalue > 1); and (e) principle component analysis (PCA) with SPSS 22 software (Appendix A, Appendix B, Appendix C, Appendix D, Appendix E, Appendix F, Appendix G, Appendix H, Appendix I and Appendix J). In addition, in order to determine whether nonresponse bias was present in the study, we compared early respondents with late respondents on the key constructs. Chi square tests showed that no significant differences existed between the early and the late respondents with regard to company characteristics. In addition, t-test results indicated that there were no significant differences between the earlier and later respondents on the measures of construction industry growth management. Thus, nonresponse bias was not a problem in this study.
Our final questionnaire of Shaanxi’s construction industry growth management contained 16 questions (Appendix B). In the formal questionnaire, most items were evaluated on a five-point ratio scale (1 = very important to 5 = not very important), except for several specific options. The statistical measurements of instrument development are described in Table 3 below.
In Shaanxi Province, we administered the questionnaire in Chinese. To ensure that the meaning of all questionnaire items in the Chinese version were the same as those in the original English version, we translated all the questions into Chinese and then back-translated them into English following the procedure that Chung-Leung (2005) [67] andLi (2006) [68] suggest.

4.2. Average Score Method Analysis

4.2.1. Growth Level Using the Average Score Method

On the basis of Table 3 in Section 4.1, using the average score method with Equations (1) and (2) in Section 3.1, it is easy to generate the average score of the construction industry growth management of Shaanxi Province, which is 40.927. At the same time, using Table 2 in Section 3.1, we can arrive at each growth level, as shown in Table 4. Thus, it is easy to find that Shaanxi’s construction industry maturity level is Level II. Analogous to the framework of GMM [20], the maturity level and whole process of Shaanxi’s construction industry growth are clearly shown in Figure 4, which also indicates that its status is still at an early level. Thus it should look for ways to improve its growth.

4.2.2. Impact Factors Using the Average Score Method

Our research uses three lower frequency percentages as threshold values to analyze the impact factor, with Equation (10) generating the degree of difficulty of each index, as shown in Table 5. According to past research [52,54,58,69,70], the smaller the frequency percent of each index is, the stronger the hindering influence. In Table 5, we can see that F1-7 in Table 3 is the smallest frequency percent, which indicates that Shaanxi’s construction industry’s brand building support is unable to meet the requirements for transition at the present time. The values of F3-2 (59) and F3-4 (60) in Table 5 are smaller than all the other values, which shows that Shaanxi’s construction industry is not standardized and needs to learn effective project management. The industry should also become familiar with the Excellence Project Management Model compiled by MOURD, China.

4.3. Entropy Method Analysis

4.3.1. Impact Factors Using the Entropy Method

We used Equations (3) and (4) in Section 3.2 to standardize the data of the final questionnaire. We then applied Equations (5)–(7) in Section 3.2 to generate the entropy weight of the 16 indices in Table 3, which are shown in Table 6.

4.3.2. Impact Factors Using the Entropy Method

By calculating the Shaanxi construction industry’s growth level using the entropy method of Equation (8), we generate a score of 2.55, which is at Level II. Compared with Table 2 in Section 3.2, we can then see that the level of management proficiency of the Shaanxi construction industry lies at the second level, as shown in Figure 5, which is also consistent with the results of Charles McIntyre (2015) [20].

4.3.3. Impact Factors Using the Entropy Method

Equation (9) of the barrier degree method in Section 3.3 allows us to generate the frequency percentages of the impact factors using the entropy method. The results are shown in Table 7.
With regard to Table 7, we can see that the three lowest frequency percentages of the indices of Table 3 are F1-7 (6.5%), F1-6 (15.4%), and F3-4 (19.5%). Thus, in order to manage the growth drivers of Shaanxi’s construction industry, the local government may need to pay more attention to improving the maturity level of this industry. This may be done by project management systems implementation, brand building, and project knowledge management, as well as enhancing the understanding of the Excellence Project Management Model compiled by MOURD, China.

4.4. Discussion

The above research shows that brand building is the most important factor needed to drive up Shaanxi’s construction industry. Standardization, knowledge management through lessons learned, and cost management for budget control by using information systems are required for construction project management. Understanding of the Excellent Project Management Model of China is a trend for Chinese project knowledge management.
Technological innovation, information systems, urban and rural infrastructure, and knowledge management and training in the construction industry are the most important potential areas to enhance in order to drive up growth [19,25,27,42,71,72]. The results of our research show that the Shaanxi construction industry is on the second level of managerial proficiency and also that the critical impact factors of future growth are the driving forces of transformation and project knowledge management in this industry. Our research also prioritizes the factors of organizational growth.
This research summarizes the top seven impact factors as shown in Table 8. Other researchers [23,24,73,74] recommend that the local government stimulate the transformation of construction enterprises and encourage these businesses to focus on implementing innovative business models such as service-driven engineering, procurement, construction, and partnering. In Table 8, the results from the entropy method are more consistent with still other research [34,50,52,55,75]. Questions such as “How significant is the attention given to propagating the lessons learned from successful projects in your company?” (F1-1 in Table 3), “At what level is the implementation of project information management in your company?” (F1-5 in Table 3), and “How well is project standardization managed in your company?” (F3-2 in Table 3) should be the significant impact factors for Shaanxi construction industry growth management.
Additionally, using the growth driver aspect as shown in Table 9, the different methods give us almost consistent results for the impact factors. Researchers [23,24,73,74,76,77] further suggest the importance of talent training and technological innovation. Our research focuses on the maturity analysis of the construction industry and its impact factors needed for the companies. For example, in order to update the managerial proficiency level of the construction industry, the local government should encourage the industry to pay attention to brand building in order to enhance brand recognition in the market. This result is consistent with the central tenets of “Rethinking Construction: the Egan Report”, which mentions the importance of learning strategies and methods in construction industry management and enhancing the application of brand strategy performance tools and techniques [78].

5. Conclusions

This research reviews the characteristics of Shaanxi Province’s construction industry, defines its growth drivers, and develops a growth management model (GMM). The research investigates the maturity levels of the construction industry in Shaanxi, which is on its national government’s pilot list. This study also researches Shaanxi’s significant impact factors on its industry level and explains the four growth drivers and 16 corresponding indicators of growth management in this province. The empirical research shows that the growth management of Shaanxi’s construction industry lies on the second of four maturity levels. This indicates that the construction industry of Shaanxi is at an early stage of growth management and is facing some critical problems, such as a low level of transformation and a lack of project knowledge management. The Shaanxi construction industry may need to enhance the brand building in its enterprises’ developmental strategies, to increase budgets on training as well as research and development, and to implement project standardization management.
This research proposes a theoretical framework for analyzing the maturity status of a developing industry. The results of this research can help policymakers, leaders, and managers understand the maturity status of their industries and develop their own strategies for economic sustainability. The research has adopted the barrier degree method to analyze the impact factors in the corresponding transition steps. Empirical research shows that the entropy method can more clearly target potential barriers than the average score method when assessing the accountability of an ecosystem in its developing construction industry. These research results can provide a good foundation for improving the transition process of construction industry management. The application of the results of this research to the development of maturity growth management may be particularly useful in similar industries of other developing countries which may need improvement in their own approaches to managing economic sustainability.

Acknowledgments

This research is supported by the National Natural Science Foundation of China (No. 71301013); Humanity and Social Science Program Foundation of the Ministry of Education of China (No. 13YJA790150); China ASC Fund (No. asc-kt2014022 and No. asc-kt2014023); China Scholarship Council; Shaanxi Nature Science Fund (No. 2014JM2-7140); Shaanxi Social Science Fund (No. 2016ZB017, No. 2014HQ10, No. 2015Z071, No. 2015Z075 and No. 2016Z047); Xi’an Science Technology Bureau Fund(No. CXY1512[2]); Special Fund for Graduate Student Education Reform of Central College, Chang’an University (No. jgy16062); Special Fund for Basic Scientific Research of Central College (Humanities and Social Sciences), Chang’an University (No. 0009-2014G6285048, No. 310828155031, No. 310828160661, and No. 310828160663). Thanks to Anne Reifler for proofreading this paper.

Author Contributions

Jingxiao Zhang and Hui Li conducted the interviews, analyzed the data, and contributed to drafting the paper. Jingxiao Zhang and Hui Li contributed to the concept and design of the paper. Steve Hsueh-Ming Wang developed the cycle of APBP for economic sustainability analysis and edited its final version. Jingxiao Zhang was in charge of the final submission.

Conflicts of Interest

The authors declare no conflict of interest.

Abbreviations

GMMGrowth management model
MOURD, P. R. ChinaMinistry of Housing and Urban-Rural Development of the People’s Republic of China
IABIndustry Advisory Board

Appendix A. Original Questionnaire

Questionnaire Survey for Power Factors and Transformational Mechanism in Construction Companies in Shaanxi Province, China
Survey Explanation: The purpose of the survey to determine the types, characteristics, and development issues of construction companies during transformation. The data collected will only be used for research and policy-making support. Your ID information will be kept confidential.
Part One: Background (Choose 1 answer for each question.)
1. Your employer is a(an):
  • (1). University; (2). Supervision Company; (3). Owner; (4). Design Company;
  • (5). Construction company; (6). Bidding Service Company; (7). Government;
  • (8). Consultancy Company; (9). Inspection Service; (10). Other: _____________
2. Your final education is:
(1).
Vocational;
(2).
Associate Degree;
(3).
Bachelor Degree;
(4).
Master’s Degree;
(5).
Ph.D. Degree
3. Your work experience is:
(1).
≤5 years;
(2).
6–10 years;
(3).
11–15 years;
(4).
16–20 years;
(5).
≥21 years
4. If you work for a construction company, your company size is:
(1).
Large-scale, state-owned;
(2).
Large-scale, private;
(3).
Small-and-medium, state-owned;
(4).
Small-and-medium private
5. Your job responsibility is at which of the following category? A; B; C; D and others.
(1).
Entry level;
(2).
Intermediate;
(3).
Administrative;
(4).
Other________
Part Two: Power factors and indicators for transformational development of construction enterprises
6. What is/are your company’s main scope(s) of business (Limit to 4 selections)?
  • (1). Real estate; (2). Residential construction; (3). R & D; (4). Design
  • (5). Supervision; (6). Engineering consulting; (7). Capital management and investment
  • (8). Municipal construction; (9). Roads & bridges construction
  • (10). Industrial plants and parks; (11). Interior finishes
  • (12). Overseas business development; (13). Prefabricated building
  • (14). Material supplier; (15). CM service; (16). Steel structure
7. Does your company have other business (Limit to 4 selections)?
  • (1). Real estate; (2). Residential construction; (3). R & D; (4). Design
  • (5). Supervision; (6). Engineering consulting; (7). Capital management and investment
  • (8). Municipal construction; (9). Roads & bridges construction
  • (10). Industrial plants and parks; (11). Interior finishes
  • (12). Overseas business development; (13). Prefabricated building (NPC)
  • (14). Material supplier; (15). CM service; (16). Steel structure
8. In your opinion, would the business of your company transform into the following areas? (Limit to 4 selections)
  • (1). Real estate; (2). Residential construction; (3). R & D; (4). Design
  • (5). Supervision; (6). Engineering consulting; (7). Capital management and investment
  • (8). Municipal construction; (9). Roads & bridges construction
  • (10). Industrial plants and parks; (11). Interior finishes
  • (12). Overseas business development; (13). Prefabricated building (NPC)
  • (14). Material supplier; (15). CM service; (16). Steel structure
9. Does your company pay attention in summarizing the advanced methods used in excellent projects?
  • Very significant, having designated manager
  • Some significant, having a part-time manager
  • Significant, having a designated person
  • Somewhat insignificant
  • Very insignificant
10. How well do you know about the incentive extent of project marketing by a special team?
  • Very well;
  • Relatively well;
  • Well;
  • Not very well;
  • Do not know
11. How significant is the attention given in propagating the advanced practice gained through successful projects in your company?
  • Very significant, having designated manager
  • Some significant, having a part-time manager
  • Significant, having a designated person
  • Somewhat insignificant
  • Very insignificant
12. To what level is the influence of the “10 New Technologies in the Construction Industry” to your company’s R & D?
  • Very significant;
  • Some significant;
  • Significant;
  • Somewhat insignificant
  • Very insignificant
13. How strict does your company enforce the environmental friendly activities of site management (such as noise control, centralized collection of construction waste, and dust control)?
  • Very strict implementation, having designated person to inspect every day
  • Strict implementation, having frequent and regular inspection
  • General implementation, having frequent and random inspection
  • Somewhat not strict, having random inspection
  • Not strict
14. How often are transformational project delivery methods, such as EPC, BT or BOT, used?
  • Very often;
  • Somewhat often;
  • Neutral;
  • Somewhat not often;
  • Never
15. How important are the corporate earnings from EPC, BT or BOT?
  • Very important
  • Important
  • Somewhat important
  • Not very important
  • Not important
16. What is the extent of standardization in enterprise management?
  • Excellent
  • Good
  • Average
  • Poor
  • Very Poor
17. What is the extent of improvement for living conditions for construction laborers?
  • Excellent
  • Good
  • Average
  • Poor
  • Very Poor
18. At what level is the implementation of project information management?
  • Excellent
  • Good
  • Average
  • Poor
  • Very Poor
19. How prevalent are joint venture and equity used in the project management system?
  • Very high
  • High
  • Moderate
  • Low
  • Very Low
20. In your opinion, what is the level of improvement in the training and use of migrant workers in the construction industry, in the aspects of using contract, standardization, and normalization?
  • Very significant;
  • Some significant;
  • Significant;
  • Somewhat insignificant;
  • Very insignificant
21. What is the implementation extent of skill training for employees in your company?
  • Very significant;
  • Some significant;
  • Significant;
  • Somewhat insignificant;
  • Very insignificant
22. How important is the implementation of quality and safety standards to the corporate’s managers?
  • Very important
  • Important
  • Somewhat important
  • Not very important
  • Not important
23. How well is project standardization managed in your company?
  • Excellent
  • Good
  • Average
  • Poor
  • Very Poor
24. What is your opinion of the implementation of project knowledge training in your company?
  • Excellent
  • Good
  • Average
  • Poor
  • Very Poor
25. How familiar are you with the Excellence Project Management Model guided by Ministry of Housing and Urban-Rural Development of the People’s Republic of China (MOURD, P. R. China)?
  • Very familiar
  • Familiar
  • Acceptable familiar
  • Not very familiar
  • Hardly ever heard
26. What is your opinion of the implementation of the Excellence Project Management Model Guided by MOURD in your company?
  • Very well
  • Well
  • Adequately
  • Poorly
  • Very poorly
27. Does your company have a brand-building department?
  • Yes. There is a designated unit.
  • Yes. There is a shared (part time) unit.
  • No. We don’t have it.
28. Does your company have a brand-building manager?
  • Yes. There is a designated high-rank manager.
  • Yes. There is a designated production manager.
  • No. We don’t have a designated high-rank manager.
  • No. We don’t have a designated production manager.
29. How important is brand-building in the future to improve the enterprise’s development?
  • Very important
  • Important
  • Somewhat important
  • Not very important
  • Not important
30. How important was brand-building in the history of the enterprise’s development?
  • Very important
  • Important
  • Somewhat important
  • Not very important
  • Not important
31. In recent years, the highest investment of the brand-building is:
  • R & D investment;
  • Production equipment;
  • Advertising;
  • Sales channels;
  • Other.
32. The most competitive factor of brand building is:
  • The ability to innovate;
  • Product quality;
  • Service level;
  • Brand Culture;
  • marketing;
  • Other
33. The most important way to corporate branding is:
  • Television advertising;
  • Newspaper Advertising;
  • Outdoor advertising;
  • Public relations activities;
  • online advertising;
  • Industry Award;
  • Exhibition.
34. Does your company have the intent of mergers or setup new regional offices in other provinces (except local province)?
  • Very clear intention;
  • Relative clear intention;
  • General clear intention;
  • Not very clear intention;
  • No intention;
  • Do not know
35. Does your company have the plan of entering emerging industrial areas (such as non-building market)?
  • Very clear intention;
  • Relative clear intention;
  • In the process of making such a plan;
  • No intention;
  • May consider this in the future
36. In your company’s project management services, how well is the information-related budget managed?
  • Excellent
  • Good
  • Average
  • Poor
  • Very Poor
37. What is the extent of the clarity of information channels and platforms to share the economic and market trends (e.g., in memos, company newsletters, or on the company’s website)?
  • Excellent
  • Good
  • Average
  • Poor
  • Very Poor
38. How significant is the self-improvement training of corporate manager on corporate business?
(1).
very significant;
(2).
some significant;
(3).
significant;
(4).
somewhat insignificant
(5).
very insignificant
39. The funding solutions of your company’s project management services mainly rely on (limit to 3 multiple choices):
  • its own efforts to expand construction output value and profit;
  • improves corporate ownership structure;
  • Project equity financing;
  • Venture capital funding;
  • Bank loan;
  • Issue bonds to raise funds within the enterprise;
  • Private capital lending;
  • Companies listed.
40. How much effort does Shaanxi Province put on the protection of the local construction market?
  • very significant;
  • some significant;
  • significant;
  • somewhat insignificant;
  • very insignificant
41. How strict is the implementation extent of corporate audit and quality control for procurement contracts?
  • Very strict implementation, having designated department and manager
  • Strict implementation, having part-time department and manager
  • General implementation, having designated person
  • Somewhat not strict, having part-time person
  • Not strict

Appendix B. Formal Questionnaire of Transformational Development for Construction Enterprises

The purpose of the survey you are being asked to complete is to determine the types, characteristics, and development issues of construction companies in the transformation period. This objective of this survey focused on the specific transformation analysis on the enterprise power factors, driving force and types of construction enterprises. You can give up the response at your will.
  • First part: Background (choose one item)
    • Your employer: A high university, B supervision company, C owner, D design company, E construction company, F bidding company, G government, H consultancy company.
    • Your education accepted: A Technical school, B college, C graduate, D others.
    • Your work experience: A less than 5 years, B 6–10 years, C 11–15 years, D 16–20 years, E more than 21 years.
    • Your company size: A large-scale state-owned construction enterprise, B large-scale private construction companies, C small-and-medium state-owned construction companies, D small-and-medium private construction enterprises.
    • Your job title: A entry-level, B intermediate, C advanced, D others.
  • Second part: Driving force and its indicator for transformational development of construction enterprise
Questions about Implementation level of transformational development (F1):
  • How significant is the attention given in propagating the advanced practice gained through successful projects in your company?
    • Very significant, having designated manager
    • Some significant, having a part-time manager
    • Significant, having a designated person
    • Somewhat insignificant
    • Very insignificant
  • How often are transformational project delivery methods, such as EPC, BT or BOT, used?
    • Very often
    • Somewhat often
    • Neutral
    • Somewhat not often
    • Never
  • What is the extent of standardization in enterprise management?
    • Excellent
    • Good
    • Average
    • Poor
    • Very Poor
  • What is the extent of improvement for living conditions for construction laborers?
    • Excellent
    • Good
    • Average
    • Poor
    • Very Poor
  • At what level is the implementation of project information management?
    • Excellent
    • Good
    • Average
    • Poor
    • Very Poor
  • How prevalent are joint venture and equity used in the project management system?
    • Very high
    • High
    • Moderate
    • Low
    • Very Low
  • How important is brand-building in the future to improve the enterprise’s development?
    • Very important
    • Important
    • Somewhat important
    • Not very important
    • Not important
Questions about External Information Integration (F2):
  • How important are the corporate earnings from EPC, BT or BOT?
    • Very important
    • Important
    • Somewhat important
    • Not very important
    • Not important
  • In your company’s project management services, how well is the information-related budget managed?
    • Excellent
    • Good
    • Average
    • Poor
    • Very Poor
  • What is the extent of the clarity of information channels and platforms to share the economic and market trends (e.g., in memos, company newsletters, or on the company’s website)?
    • Excellent
    • Good
    • Average
    • Poor
    • Very Poor
Questions about Project Knowledge Management (F3):
  • How important is the implementation of quality and safety standards to the corporate’s managers?
    • Very important
    • Important
    • Somewhat important
    • Not very important
    • Not important
  • How well is project standardization managed in your company?
    • Excellent
    • Good
    • Average
    • Poor
    • Very Poor
  • What is your opinion of the implementation of project knowledge training in your company?
    • Excellent
    • Good
    • Average
    • Poor
    • Very Poor
  • How familiar are you with the Excellence Project Management Model guided by Ministry of Housing and Urban-Rural Development of the People’s Republic of China (MOURD, P. R. China)?
    • Very familiar
    • Familiar
    • Acceptable familiar
    • Not very familiar
    • Hardly ever heard
Questions about corporate brand building (F4):
  • What is your opinion of the implementation of the Excellence Project Management Model Guided by MOURD in your company?
    • Very well
    • Well
    • Adequately
    • Poorly
    • Very poorly
  • Does your company have a brand-building department?
    • Yes. There is a designated unit.
    • Yes. There is a shared (part time) unit.
    • No. We don’t have it

Appendix C

Table C1. The Descriptive Statistics of Original Questionnaire.
Table C1. The Descriptive Statistics of Original Questionnaire.
Question CodeNRangeMinimumMaximumMeanStd. DeviationVarianceSkewnessKurtosis
StatisticStatisticStatisticStatisticStatisticStd. ErrorStatisticStatisticStatisticStd. ErrorStatisticStd. Error
V6123181194.240.3393.75514.1001.9190.2183.7730.433
V7123181195.660.3794.20217.6531.1730.2180.7930.433
V8123171184.500.3583.96815.7441.7530.2182.5290.433
V91234152.030.0991.0931.1961.1970.2181.0480.433
V101234152.200.1061.1731.3760.8340.218−0.0220.433
V111234152.370.0900.9950.9900.5080.218-0.4020.433
V121234152.190.0790.8810.7760.5000.2180.0150.433
V131234152.480.0790.8720.7600.1010.218−0.2850.433
V141234152.760.0911.0111.0220.2660.218−0.8060.433
V151234153.080.1041.1491.321−0.0300.218−1.1150.433
V161224152.980.1001.1021.214−0.1390.219−1.0240.435
V171234152.600.0890.9900.9790.2540.218−0.2990.433
V181234152.600.0800.8850.7830.4440.2180.0700.433
V191234152.460.0760.8420.7100.2840.218−0.1010.433
V201234152.500.0800.8910.7930.3310.218−0.0480.433
V211234152.060.0800.8900.7920.5970.2180.0510.433
V221233142.400.0820.9120.8320.0430.218−0.7980.433
V231234152.360.0810.8970.8050.4030.2180.0910.433
V241234152.760.0870.9700.9400.0160.218−0.5200.433
V251234152.410.0770.8490.7200.7220.2180.8920.433
V261232132.150.0690.7650.585−0.2550.218−1.2430.433
V271233142.500.1021.1261.2680.1150.218−1.3730.433
V281234152.010.0690.7630.5820.8870.2181.7420.433
V291234152.170.0700.7760.6020.8710.2181.3650.433
V301234152.640.1181.3071.7070.6690.218−0.6100.433
V311235162.370.0911.0111.0230.9790.2181.1460.433
V321236174.020.1741.9293.721−0.0020.218−1.3530.433
V331235162.840.1251.3811.9080.6580.218−0.3260.433
V341234152.720.1061.1771.3860.3280.218−0.8100.433
V351237182.250.1581.7493.0591.4650.2181.4500.433
V361234152.520.0941.0431.0880.8050.2180.1670.433
V371234152.820.0991.1021.214−0.0120.218−1.0990.433
V381234152.620.0870.9630.9271.1720.2181.0680.433
V391234152.230.0921.0231.0461.2570.2181.5120.433
V401234152.120.0890.9880.9771.3050.2181.8030.433
V411223142.070.0730.8100.6570.4470.219−0.2070.435
Valid N (list wise)121

Appendix D

Table D1. Independent Samples Test of Original Questionnaire.
Table D1. Independent Samples Test of Original Questionnaire.
Question CodeLevene’s Test for Equality of Variancest-Test for Equality of Means
FSig.tdfSig. (2-Tailed)Mean DifferenceStd. Error Difference95% Confidence Interval of the Difference
LowerUpper
V6Equal variances assumed (EV)7.2180.0092.757650.0082.6190.9500.7224.517
Equal variances not assumed (NEV) 2.73346.9960.0092.6190.9590.6914.548
V7EV18.1960.0004.460650.0004.4200.9912.4416.399
NEV 4.42448.9690.0004.4200.9992.4126.428
V8EV13.4300.0002.838650.0062.6440.9320.7834.506
NEV 2.80741.7940.0082.6440.9420.7434.546
V9EV19.3280.0004.739650.0001.2900.2720.7461.833
NEV 4.69244.6080.0001.2900.2750.7361.843
V10EV19.4200.0005.330650.0001.4740.2770.9222.027
NEV 5.28347.4220.0001.4740.2790.9132.035
V11EV12.6730.0018.448650.0001.6260.1921.2412.010
NEV 8.38149.7830.0001.6260.1941.2362.015
V12EV0.0500.8244.758650.0000.9610.2020.5571.364
NEV 4.75364.3960.0000.9610.2020.5571.365
V13EV0.5730.4524.908650.0000.9390.1910.5571.322
NEV 4.90063.7050.0000.9390.1920.5561.322
V14EV4.5050.0389.777650.0001.7260.1771.3742.079
NEV 9.74060.2900.0001.7260.1771.3722.081
V15EV0.0200.8888.471650.0001.7610.2081.3462.176
NEV 8.45963.9180.0001.7610.2081.3452.177
V16EV0.4970.4839.658640.0001.7580.1821.3942.121
NEV 9.65861.8720.0001.7580.1821.3942.121
V17EV2.4620.1226.538650.0001.4490.2221.0061.892
NEV 6.50758.4540.0001.4490.2231.0031.895
V18EV6.7910.0115.483650.0001.1210.2040.7131.530
NEV 5.45055.0250.0001.1210.2060.7091.533
V19EV2.3700.1297.045650.0001.2100.1720.8671.553
NEV 7.01659.5110.0001.2100.1730.8651.555
V20EV1.7040.1965.480650.0001.0320.1880.6561.408
NEV 5.45658.8250.0001.0320.1890.6541.411
V21EV1.3940.2424.833650.0000.9560.1980.5611.352
NEV 4.81560.4230.0000.9560.1990.5591.354
V22EV0.0160.9016.999650.0001.3280.1900.9491.707
NEV 6.99464.5980.0001.3280.1900.9491.707
V23EV0.7900.3776.871650.0001.3250.1930.9401.711
NEV 6.83155.3320.0001.3250.1940.9371.714
V24EV4.0170.0497.542650.0001.3670.1811.0051.729
NEV 7.51260.0440.0001.3670.1821.0031.731
V25EV5.6620.0207.167650.0001.1790.1650.8511.508
NEV 7.10748.6690.0001.1790.1660.8461.513
V26EV5.8860.0187.079650.0001.0510.1480.7541.347
NEV 7.10861.3450.0001.0510.1480.7551.346
V27EV0.2920.5918.394650.0001.7490.2081.3332.165
NEV 8.37863.5000.0001.7490.2091.3322.166
V28EV1.8290.1813.912650.0000.7190.1840.3521.086
NEV 3.89961.1820.0000.7190.1840.3501.088
V29EV19.6220.0005.420650.0000.9640.1780.6091.320
NEV 5.37146.4600.0000.9640.1800.6031.326
V30EV24.7400.0005.610650.0001.5410.2750.9922.090
NEV 5.57052.1260.0001.5410.2770.9862.096
V31EV3.4420.0683.211650.0020.7880.2450.2981.278
NEV 3.19859.2780.0020.7880.2460.2951.281
V32EV3.8600.0542.796650.0071.3410.4800.3832.299
NEV 2.80563.0880.0071.3410.4780.3862.297
V33EV6.2440.0154.935650.0001.4570.2950.8672.047
NEV 4.92061.7790.0001.4570.2960.8652.049
V34EV2.3520.1304.456650.0001.3070.2930.7211.892
NEV 4.45064.1480.0001.3070.2940.7201.893
V35EV22.1780.0002.564650.0131.0520.4100.2331.871
NEV 2.54045.6540.0151.0520.4140.2181.885
V36EV3.5850.0635.163650.0001.2690.2460.7781.760
NEV 5.14962.3130.0001.2690.2460.7771.762
V37EV0.5570.4587.948650.0001.6950.2131.2692.121
NEV 7.93263.3500.0001.6950.2141.2682.122
V38EV9.9780.0024.409650.0001.0040.2280.5491.459
NEV 4.37047.7260.0001.0040.2300.5421.467
V39EV6.2790.0153.221650.0020.8160.2530.3101.323
NEV 3.20759.5220.0020.8160.2550.3071.326
V40EV21.1040.0003.890650.0000.9630.2470.4681.457
NEV 3.85244.8780.0000.9630.2500.4591.466
V41EV8.8130.0044.383640.0000.8480.1940.4621.235
NEV 4.38354.1200.0000.8480.1940.4601.237

Appendix E

Table E1. Item-Total Statistics of Original Questionnaire.
Table E1. Item-Total Statistics of Original Questionnaire.
Question CodeScale Mean If Item DeletedScale Variance If Item DeletedCorrected Item-Total CorrelationSquared Multiple CorrelationCronbach’s Alpha If Item Deleted
V692.71409.6740.1270.3530.851
V791.34389.9930.2150.3040.851
V892.49414.0520.0830.3580.857
V994.93421.7120.4530.7720.824
V1094.76417.9840.4990.7940.823
V1194.59417.3610.6180.6750.821
V1294.79430.9530.3160.4590.828
V1394.48428.6520.3910.6060.826
V1494.21416.2320.6360.6640.821
V1593.89416.5470.5390.6210.822
V1694.00417.7330.5400.5840.822
V1794.36421.0170.5270.6560.823
V1894.37421.3020.5810.6680.823
V1994.50421.7350.6060.6420.823
V2094.47424.6010.4900.5650.825
V2194.92427.6260.4030.5270.826
V2294.57422.8970.5230.5840.824
V2394.61421.1900.5790.6160.823
V2494.22420.9750.5340.6490.823
V2594.56423.7980.5330.6520.824
V2694.82425.9830.5360.6580.825
V2794.47416.0350.5650.7070.822
V2894.97430.1660.3960.5900.827
V2994.80425.1600.5490.6350.824
V3094.34415.3930.4880.4190.822
V3194.61430.6730.2790.4360.828
V3293.01422.1920.2210.4540.830
V3394.16420.2670.3820.4520.825
V3494.28419.5200.4690.5080.823
V3594.73425.0670.2090.4260.830
V3694.45418.9670.5450.5410.823
V3794.15414.2780.6220.6660.820
V3894.36426.3640.4000.5500.826
V3994.74427.4750.3480.5410.827
V4094.85424.5440.4350.5600.825
V4194.91428.8000.4130.5220.826

Appendix F

Table F1. Component Matrix a.
Table F1. Component Matrix a.
Question CodeComponent
1234
V110.726−0.246−0.145−0.200
V140.7420.0110.210−0.217
V150.6580.106−0.280−0.241
V160.6720.020−0.053−0.294
V170.703−0.4010.083−0.064
V180.694−0.3130.201−0.210
V190.741−0.0750.209−0.130
V220.5690.0030.2700.542
V230.660−0.3100.1820.264
V240.6260.058−0.2590.388
V250.669−0.269−0.0990.377
V260.5710.6330.2030.046
V270.6660.5510.1340.100
V290.5980.1780.332−0.210
V360.6210.187−0.471−0.028
V370.7010.053−0.4860.029
Extraction Method: Principal Component Analysis. a 4 components extracted.

Appendix G

Table G1. Structure Matrix.
Table G1. Structure Matrix.
Question CodeComponent
1234
V110.7440.6350.4160.221
V140.7650.4600.3840.525
V150.5730.7070.2470.397
V160.6720.5710.2600.410
V170.7700.4550.5470.163
V180.8070.3910.4310.257
V190.7600.4470.4620.462
V220.3880.2590.7820.434
V230.6240.3590.7250.234
V240.3650.6400.6620.351
V250.5280.5390.7750.186
V260.3600.3920.2940.874
V270.4360.4970.4100.853
V290.6140.2910.2580.595
V360.4130.7960.3300.377
V370.4990.8500.4540.324
Extraction Method: Principal Component Analysis. Rotation Method: Promax with Kaiser Normalization.

Appendix H

Table H1. Total Variance Explained of Original Questionnaire.
Table H1. Total Variance Explained of Original Questionnaire.
ComponentInitial EigenvaluesExtraction Sums of Squared LoadingsRotation Sums of Squared Loadings a
Total% of VarianceCumulative %Total% of VarianceCumulative %Total
17.09044.31244.3127.09044.31244.3125.810
21.2838.01952.3311.2838.01952.3314.740
31.0476.54658.8771.0476.54658.8773.960
41.0106.31565.1931.0106.31565.1933.451
50.8045.02270.215
60.6754.21974.434
70.6694.18178.615
80.5763.59882.213
90.4863.03785.251
100.4532.83488.084
110.3942.46390.548
120.3752.34492.892
130.3402.12895.020
140.2951.84396.863
150.2591.61798.481
160.2431.519100.000
Extraction Method: Principal Component Analysis. a When components are correlated, sums of squared loadings cannot be added to obtain a total variance.

Appendix I

Table I1. PCA and K type.
Table I1. PCA and K type.
Response CodeF1F2F3F4FsK Type
CE15.4761547130.7078552520.290322581−0.8726368163.8076474811
CE26.054074352−0.5975286850.042033236−0.2378109454.0414130471
CE37.1592189260.4889673430.4721407620.6885572144.9283798961
CE46.031918888−0.744042365−0.2082111440.1054726374.0082530351
CE57.028163725−0.6081200350.013685239−0.077611944.7022606581
CE66.3458505441.40776699−0.273704791.8447761194.4832936111
CE78.6380022532.8861429830.3773216030.683582096.2280030582
CE86.286894480.120035305−1.1378299120.1890547264.2866379771
CE97.4434847920.0379523390.692082111−0.2278606975.0630450691
CE107.539241457−0.834951456−0.2834799610.2139303485.0213587011
CE118.861058956−0.8631950570.502443793−1.9253731345.9105727331
CE127.476154713−0.6107678730.266862170.2965174135.0069460551
CE135.233195644−0.187113857−0.4486803520.1711442793.533524441
CE147.9504318441.65842895−1.384164223−0.6189054735.6134201711
CE159.5035674050.47749338−1.3382209190.0348258716.5180744922
CE167.9737138570.3283318620.0606060610.3024875625.4602864161
CE178.761547127−0.6125330981.1964809380.0477611945.8802775531
CE188.007885843−1.4501323920.030303030.6985074635.2647357291
CE199.9091250471.820829656−3.45259042−0.1293532346.9621300932
CE209.3109275250.279788173−0.659824047−0.8009950256.3664654732
CE214.2219301540.215357458−0.22287390.5373134332.8954029591
CE228.6890724751.1738746690.6089931570.6487562196.0529349112
CE237.4187007130.4677846431.7165200391.2338308465.1135294591
CE247.6841907621.075904678−1.409579668−0.0995024885.3562403571
CE257.5140818630.485436893−0.173998045−0.0855721395.1671780151
CE267.780322944−1.098852604−0.6500488760.5432835825.1508991761
CE278.7085993240.34510150.3304007821.598009955.965091492
CE287.759294029−0.230361871−0.1378299120.2567164185.2454696891
CE296.80022531−0.2144748460.374389052−1.201990054.5929070151
CE305.4971836270.2047661080.247311828−0.2537313433.7612586961
CE318.4652647390.343336275−1.4584555230.6029850755.790541342
CE328.9984979350.244483672−0.049853372−0.442786076.1465461032
CE338.1948929780.3142100620.3773216030.6935323385.6104310411
CE347.4461134060.0688437780.5454545451.9034825875.0762265921
CE358.285016898−1.499558694−0.360703812−0.8995024885.4489484431
CE369.57679309−0.6319505740.269794721−0.9462686576.4300318292
CE379.1978971090.243601059−0.770283481.0218905476.2768316412
CE388.1783702591.40070609−0.0830889541.3094527365.7305140321
CE3911.069846040.7016769640.48973607−1.6497512447.6054283063
CE408.7761922641.93027361−1.5307917890.0935323386.201788672
CE417.220803605−0.248896734−0.5992179860.5412935324.8753395741
CE427.533233196−1.5763459840.6129032260.1154228864.9268991091
CE439.0349230191.312444837−2.059628543−0.9800995026.3153686632
CE449.422080361.4660194170.0078201370.8945273636.5846410842
CE458.59218926−1.102383054−1.5972629520.1681592045.7028318252
CE468.3803980470.721977052−0.6999022480.3442786075.7834935581
CE479.280886219−0.507502207−1.036168133−0.8587064686.2514837782
CE4810.89372888−1.066195940.945259042−1.00398017.267332082
CE499.875328577−1.301853486−1.6392961880.0139303486.5520093742
CE509.4791588430.859664607−0.880742913−0.1054726376.5493863022
CE5110.262861431.0432480140.070381232−1.8736318417.1032313382
CE528.340968832−1.3636363641.326490714−0.8885572145.4941562511
CE538.9297784451.158870256−0.4701857281.277611946.2083747572
CE548.6841907621.404236540.2199413491.1860696526.0771047362
CE558.911002629−0.0229479260.7302052791.2706467666.0599259072
CE568.2087870820.379523389−0.192570870.6885572145.6254064081
CE577.9361622230.596646072−0.050830890.8875621895.4673688231
CE588.078107398−0.377758164−0.594330401−0.6298507465.4466372121
CE597.9737138570.3283318620.0606060610.3024875625.4602864161
CE609.6462636120.837599294−0.254154448−0.1323383086.659877442
CE619.526849418−0.72109444−0.003910068−0.3791044786.3867484882
CE629.6924521221.5948808471.693059629−0.3562189056.7803932922
CE6310.49267743−0.6672550750.0566959920.8208955227.0501367942
CE6411.27224934−1.837599294−1.260019552.8417910457.4130012333
CE6510.84003004−0.556928508−1.019550342−0.2278606977.3009868663
CE669.981224183−1.025595763−0.615835777−0.1104477616.6585507312
CE6711.10101389−1.641659312−2.720430108−0.4179104487.3506741452
CE6810.706346231.586054722−2.013685239−0.2009950257.4748566753
CE6910.514457380.1544571930.0332355821.1900497517.1659875152
CE7010.542996620.3318623120.3460410560.2825870657.2075808532
CE7110.26511453−2.035304501−0.4046920820.1393034836.7265032342
CE7211.433345851.537511033−3.8690127080.4875621897.9484814463
CE7313.22756291.991173875−2.568914956−0.957213939.2514259043
CE7411.406684192.134157105−1.7223851420.1343283588.0142712163
CE7511.56102140.094439541−0.622678397−0.1791044787.8704161723
CE7611.346226060.73874669−0.3870967740.7940298517.801024513
CE7711.466015771.590467785−0.049853372−0.3651741297.989296623
CE7810.969958690.329214475−0.409579668−0.7353233837.4987550792
CE7913.32219302−0.361871139−0.641251222−0.2358208969.0116086093
CE8011.05595193−0.589585172−1.748778104−1.3124378117.4568317622
CE819.6901990241.375110327−1.4213098730.3691542296.7523225342
CE829.656402554−1.340688438−0.8680351910.9830845776.3931526662
CE8312.980473151.276257723−0.7302052790.3910447768.9780970843
CE8411.308298911.812886143−1.825024438−1.2159203987.9234343273
CE8511.84040556−0.481906443−0.531769306−0.1741293537.9892899513
CE8611.56590312−0.464254192−1.375366569−0.6895522397.8103151222
CE8711.52985355−0.433362754−0.6617790811.3820895527.7777821433
CE8810.691325571.2744924980.3763440860.3800995027.4246553492
CE8913.318437850.9152691970.485826002−2.2308457719.1583339343
CE9011.316935790.467784643−1.99315738−1.0507462697.7630313713
CE9113.78107398−0.483671668−1.5386119260.6189054739.301520873
CE9210.948929782.0953221540.124144673−0.1711442797.6996896292
CE9313.41832521.300970874−0.2961876830.9950248769.2786896163
CE9410.95043184−0.233009709−0.3489736072.3691542297.4091524232
CE9513.315058210.5278022950.730205279−1.1373134339.1099773153
CE969.4070597072.7634598411.9990224830.3283582096.7381728032
CE9711.02215546−0.2038834950.793743891−0.8905472647.4622480222
CE9810.054449871.833186231−2.351906158−2.3870646777.0952425472
CE9910.349605712.154457193−1.4232649072.2676616927.2792410893
CE10013.276380020.329214475−0.438905181−0.0507462699.0646712523
CE10111.720991360.448367167−0.9130009780.8208955228.0172231613
CE10211.36687946−0.53309797−2.259042033−2.27.6921049213
CE10314.279384150.422771403−0.2043010750.479601999.7571648624
CE10411.474652651.203883495−0.9217986310.0129353237.9474162983
CE10513.5148329−0.1315092671.0273704790.7263681599.1746657253
CE10612.48291401−1.138570168−1.7302052791.4706467668.3284745683
CE10715.39466767−1.395410415−2.091886608−0.01194029910.292328164
CE10815.15133308−1.554280671−0.530791789−0.47860696510.108841864
CE10913.527975970.3477493380.8484848480.6507462699.2413273834
CE11013.964325950.770520741−0.2825024440.7820895529.5850191424
CE11113.6436351.92321271−1.3225806451.0308457719.5015991614
CE11213.295531361.5207413950.239491691−2.0656716429.2209932463
CE11311.947803231.3962930270.2199413490.1124378118.2929232753
CE11413.24596320.79082083−1.2825024440.1671641799.0992830833
CE11515.015771690.051191527−1.9481915931.12338308510.198702584
CE11615.80247841−0.2771403350.710654936−0.62487562210.704116054
CE11713.418700711.45631068−0.5141739981.5422885579.2948913644
CE11814.284265870.231244484−1.304007820.0656716429.7369987924
CE11915.535486290.048543689−0.5425219940.28855721410.564533114
CE12015.515208410.54015887−0.677419355−0.62786069710.614926014
CE12112.76943297−0.315092674−1.725317693−0.5442786078.6466522823
CE12216.00638378−0.2947925860.2971652−0.08855721410.843192744
CE12315.742395790.059135040.216031281−0.02487562210.70743364

Appendix J

Table J1. PCA Descriptive Statistics.
Table J1. PCA Descriptive Statistics.
NRangeMinimumMaximumSumMeanStd. DeviationVarianceSkewnessKurtosis
StatisticStatisticStatisticStatisticStatisticStatisticStd. ErrorStatisticStatisticStatisticStd. ErrorStatisticStd. Error
F112311.7844.221916.00631258.1810.22910.234582.601656.7690.2780.218−0.4600.433
453623015383777694754034434172894290152969
F21234.9214−2.0352.8861434.48890.2803980.094261.045411.0930.0800.218−0.4790.433
474843045029832306734331084822154677867551
F31235.8680−3.8691.99902−57.145−0.464590.092301.023731.0480-.5080.2180.6430.433
351900127724828936500488780887517559893283
F41235.2288−2.3872.8417910.3740.084340.085430.947490.898−0.0900.2180.5940.433
55721064671044781293532515062925606980313
Fs1237.94772.895410.8431859.4536.987420.160391.778913.1650.2360.218−0.5320.433
897820295992741644426276362829466966143930
Valid N (listwise)123

References

  1. Fernández, J.A.; Fernández-Stembridge, L. China’s State-Owned Enterprise Reforms: An Industrial and CEO Approach, 1st ed.; Routledge: New York, NY, USA, 2007; p. 21. [Google Scholar]
  2. Bai, J. On regional innovation efficiency: Evidence from panel data of China’s different provinces. Reg. Stud. 2013, 47, 773–788. [Google Scholar] [CrossRef]
  3. Han, S.S.; Ofori, G. Construction industry in China’s regional economy, 1990–1998. Constr. Manag. Econ. 2001, 19, 189–205. [Google Scholar] [CrossRef]
  4. Hong, J.; Shen, Q.; Xue, F. A multi-regional structural path analysis of the energy supply chain in China’s construction industry. Energy Policy 2016, 92, 56–68. [Google Scholar] [CrossRef]
  5. Zhang, J.-X.; Li, H. Analysis on ther eliability assessment of the construction enterprises novation net in China’s construction industry. J. Xi’an Univ. Archit. Technol. Nat. Sci. Ed. 2012, 44, 406–411. [Google Scholar]
  6. Zhang, J.-X.; Li, H. Research on the economic growth difference of region construction industry in northwest China. Constr. Econ. 2012, 33, 23–27. [Google Scholar]
  7. Zhang, J.-X.; Li, H.; Zhou, T.-H.; Zhai, Y. The capital structure, business extension and profitable performance of construction enterprises—Civil engineering listed company taken as an example. J. Xi’an Univ. Archit. Technol. Nat. Sci. Ed. 2014, 46, 454–460. [Google Scholar]
  8. Zhang, J.; Xie, H.; Schmidt, K.; Li, H. Using PCA and clustering algorithm to identify powerfactors and transformation pattern of regional construction. In Journal of Computational and Theoretical Nanoscience; Schommers, W., Ed.; Universityof Texas: Arlington, TX, USA, 2015; pp. 1–50. [Google Scholar]
  9. Li, J.; Chiang, Y.; Choi, T.; Man, K. Determinants of efficiency of contractors in Hong Kong and China: Panel data model analysis. J. Constr. Eng. Manag. 2013, 139, 1211–1223. [Google Scholar] [CrossRef]
  10. Shang, G.; Pheng, L.S. Barriers to lean implementation in the construction industry in China. J. Technol. Manag. China 2014, 9, 155. [Google Scholar] [CrossRef]
  11. Xiaoling, Z.; Skitmore, M.; Yuzhe, W.U.; Kunhui, Y.E. A regional construction R&D evaluation system for china. Constr. Manag. Econ. 2010, 28, 1287–1300. [Google Scholar]
  12. Bonenberg, W.; Wei, X. Green BIM in sustainable infrastructure. Procedia Manuf. 2015, 3, 1654–1659. [Google Scholar] [CrossRef]
  13. Emmanuel, M.R.; Baker, K. Carbon Management in the Built Environment [Electronic Resource]/Rohinton Emmanuel and Keith Baker; Routledge: Abingdon, UK, 2012. [Google Scholar]
  14. Lewis, J.I. Green innovation in China: China’s wind power industry and the global transition to a low-carbon economy. In Contemporary Asia in the World; Columbia University Press: New York, NY, USA, 2013; p. 1. [Google Scholar]
  15. Munier, N.; Jiménez-Sáez, F.; Fernández-Diego, M. Project Management for Environmental, Construction and Manufacturing Engineers a Manual for Putting Theory into Practice; Springer: Dordrecht, The Netherlands; New York, NY, USA, 2013; p. 1. [Google Scholar]
  16. Stubbs, W.; Cocklin, C. Conceptualizing a “Sustainability business model”. Organ. Environ. 2008, 21, 103–127. [Google Scholar] [CrossRef]
  17. Wang, S.H.-M. Sustainable Program Quality Management of International Infrastructure Construction. Available online: http://academic.hep.com.cn/fem/EN/10.15302/J-FEM-2016047 (assessed on 10 January 2017).
  18. Xu, D.; Lu, J.W.; Gu, Q. Organizational forms and multi-population dynamics: Economic transition in China. Adm. Sci. Q. 2014, 59, 517–547. [Google Scholar] [CrossRef]
  19. Castro-Lacouture, D.; Irizarry, J.; Ashuri, B.; American Society of Civil Engineers; Construction Institute. Construction Research Congress: Construction in a Global Network. Available online: http://ascelibrary.org/doi/book/10.1061/9780784413517 (assessed on 10 January 2017).
  20. McIntyre, C. A Framework for Understanding IAB Output and IAB Management. Available online: http://www.acce-hq.org/images/uploads/IAB_Growth_Management_Model_Version_3.pdf (accessed on 10 January 2017).
  21. Jouvet, P.-A.; de Perthuis, C. Green growth: From intention to implementation. Int. Econ. 2013, 134, 29–55. [Google Scholar] [CrossRef]
  22. Komarkova, L.; Pirozek, P.; Pudil, P. The factors and other characteristics influencing competitiveness of enterprises in countries in the post-transition phase of the economy. Eng. Econ. 2014, 25, 513–521. [Google Scholar] [CrossRef]
  23. Cable, V.; Fallon, M.; Higgins, D. Construction 2025; HM Government: London, UK, 2013; p. 80. [Google Scholar]
  24. Lucas, L.; Mckenzie, L.; Simon, S.; Hunt, L.; Norris, D.; Pearson, L.; Raynsford, R.H.N.; Manus Ademson, J.W.; Clarks, K.; Barden, A.; et al. Strategy for Sustainable Construction-Progress Report; HM Government & Strategic Forum for Construction: London, UK, 2009; p. 71. [Google Scholar]
  25. Adamson, D.M.; Pollington, T. Change in the Construction Industry: An Account of the UK Construction Industry Reform Movement 1993–2003; Routledge: London, UK, 2006; p. 162. [Google Scholar]
  26. Adrian, J.J. Business Practices for Construction Management; Elsevier: New York, NY, USA, 1976; p. 425. [Google Scholar]
  27. Akintoye, A.; Goulding, J.; Zawdie, G. Construction Innovation and Process Improvement; Wiley-Blackwell: Hoboken, NJ, USA, 2012; p. 1. [Google Scholar]
  28. Anumba, C.J.; Egbu, C.O.; Carrillo, P.M. Knowledge Management in Construction. Available online: www.petronet.ir/documents/10180/2323250/Knowledge_Management_in_Construction-Chimay_J._Anumba__Charles_Egbu__Patricia_Carrillo-140512 (assessed on 10 January 2017).
  29. Atkin, B.; Borgbrant, J. Performance Improvement in Construction Management; Spon Press: London, UK, 2010; p. 330. [Google Scholar]
  30. Brooker, P.; Wilkinson, S.; Ebooks Corporation. Mediation in the Construction Industry: An International Review; Spon Press: London, UK, 2010; p. 1. [Google Scholar]
  31. Brookes, N. Construction project management. Constr. Manag. Econ. 2013, 31, 1019–1020. [Google Scholar] [CrossRef]
  32. Cain, C.T. Performance Measurement for Construction Profitability; Blackwell Publishing: Hoboken, NJ, USA, 2004; p. 214. [Google Scholar]
  33. Chinowsky, P.; Songer, A. Organization Management in Construction; Spon Press: London, UK, 2011; p. 204. [Google Scholar]
  34. Zhang, J.; Schmidt, K.; Li, H. An integrated diagnostic framework to manage organization sustainable growth: An empirical case. Sustainability 2016, 8, 23. [Google Scholar] [CrossRef]
  35. Badu, E.; Owusu-Manu, D.-G.; Edwards, D.J.; Holt, G.D. Analysis of strategic issues underpinning the innovative financing of infrastructure within developing countries. J. Constr. Eng. Manag. 2013, 139, 726–737. [Google Scholar] [CrossRef]
  36. Giang, D.T.H.; Pheng, L.S. Role of construction in economic development: Review of key concepts in the past 40 years. Habitat Int. 2011, 35, 118–125. [Google Scholar] [CrossRef]
  37. Lizarralde, G.; Tomiyoshi, S.; Bourgault, M.; Malo, J.; Cardosi, G. Understanding differences in construction project governance between developed and developing countries. Constr. Manag. Econ. 2013, 31, 711–730. [Google Scholar] [CrossRef]
  38. Kuo, Y. Technology readiness as moderator for construction company performance. Ind. Manag. Data Syst. 2013, 113, 558–572. [Google Scholar] [CrossRef]
  39. Zilber, S.N.; de Araújo, J.B. Small companies innovations in emerging countries: E-business adoption and its business model. J. Technol. Manag. Innov. 2012, 7, 102–115. [Google Scholar] [CrossRef]
  40. Bemelmans, J.; Voordijk, H.; Vos, B.; Buter, J. Assessing buyer-supplier relationship management: Multiple case-study in the dutch construction industry. J. Constr. Eng. Manag. 2012, 138, 163–176. [Google Scholar] [CrossRef]
  41. Park, K.; Kusiak, A. Enterprise resource planning (ERP) operations support system for maintaining process integration. Int. J. Prod. Res. 2005, 43, 3959–3982. [Google Scholar] [CrossRef]
  42. Sexton, M.; Barrett, P. Appropriate innovation in small construction firms. Constr. Manag. Econ. 2003, 21, 623–633. [Google Scholar] [CrossRef]
  43. Wang, X.; Chen, Y.; Liu, B.; Shen, Y.; Sun, H. A total factor productivity measure for the construction industry and analysis of its spatial difference: A case study in China. Constr. Manag. Econ. 2013, 31, 1059–1071. [Google Scholar] [CrossRef]
  44. Korman, T.M.; Huey-King, L. Industry input for construction engineering and management courses: Development of a building systems coordination exercise for construction engineering and management students. Pract. Period. Struct. Des. Constr. 2014, 19, 68–72. [Google Scholar] [CrossRef]
  45. Iammarino, S.; Piva, M.; Vivarelli, M.; von Tunzelmann, N. Technological capabilities and patterns of innovative cooperation of firms in the uk regions. Reg. Stud. 2012, 46, 1283–1301. [Google Scholar] [CrossRef]
  46. Dick, J.; Payne, D. Regional sectoral support: A review of the construction industry, smes and regional innovation strategies across europe. Int. J. Strateg. Prop. Manag. 2005, 9, 55–63. [Google Scholar]
  47. Herliana, S. Regional innovation cluster for small and medium enterprises (SME): A triple helix concept. Procedia Soc. Behav. Sci. 2015, 169, 151–160. [Google Scholar] [CrossRef]
  48. Laihonen, H.; Lonqvist, A.; Metsälä, J. Two knowledge perspectives to growth management. VINE 2015, 45, 473–494. [Google Scholar] [CrossRef]
  49. AlQahtany, A.; Rezgui, Y.; Li, H. A consensus-based frameworkfor the sustainable urban planning development: “As an approach for saudi arabian cities”. Int. J. Environ. Sci. Dev. 2014, 5, 124–131. [Google Scholar] [CrossRef]
  50. Benedetto, F.; Giunta, G.; Mastroeni, L. A maximum entropy method to assess the predictability of financial and commodity prices. Digit. Signal Process. 2015, 46, 19–31. [Google Scholar] [CrossRef]
  51. Bereziński, P.; Jasiul, B.; Szpyrka, M. An entropy-based network anomaly detection method. Entropy 2015, 17, 2367–2408. [Google Scholar] [CrossRef]
  52. Zhang, J.; Xie, H.; Schmidt, K.; Li, H. A new systematic approach to vulnerability assessment of innovation capability of construction enterprises. Sustainability 2016, 8, 25. [Google Scholar] [CrossRef]
  53. Aldana-Bobadilla, E.; Kuri-Morales, A. A clustering method based on the maximum entropy principle. Entropy 2015, 17, 151–180. [Google Scholar] [CrossRef]
  54. Li, B.; Yang, Z.; Su, F. Measurement of vulnerability in human-sea economic system based on set pair analysis: A case study of dalian city. Geogr. Res. 2015, 34, 967–976. [Google Scholar]
  55. Meng, X.-M.; Hu, H.-P. Application of set pair analysis model based on entropy weight tocomprehensive evaluation of water quality. Shuili Xue bao 2009, 40, 257–262. [Google Scholar]
  56. Su, M.R.; Yang, Z.F.; Chen, B. Set pair analysis for urban ecosystem health assessment based on emergy-vitality index. China Environ. Sci. 2009, 29, 892–896. (In Chinese) [Google Scholar]
  57. Li, F.; Wan, N.; Shi, B.; Liu, X.; Guo, Z. The vulnerability measure of tourism industry based on the perspective of “environment-structure” integration a case study of 31 provinces in mainland China. Geogr. Res. 2014, 33, 569–581. [Google Scholar]
  58. Zou, Q.; Zhou, J.Z.; Zhou, C.; Song, L.X.; Guo, J. Comprehensive flood risk assessment based on set pair analysis-variable fuzzy sets model and fuzzy ahp. Stoch. Environ. Res. Risk Assess. 2013, 27, 525–546. [Google Scholar] [CrossRef]
  59. Han, R.; Tong, L.; Tong, W.; Yu, J. Research on vulnerability assessment of human-land system of Anshan city based on set pair analysis. Prog. Geogr. 2012, 31, 344–351. [Google Scholar]
  60. Kohli, A.K.; Jaworski, B.J. Market orientation: The construct, research propositions, and managerial implications. J. Mark. 1990, 54, 1–18. [Google Scholar] [CrossRef]
  61. Deng, S.L.; Dart, J. Measuring market orientation: A multi-factor, multi-item approach. J. Mark. Manag. 1994, 10, 725–742. [Google Scholar] [CrossRef]
  62. Ng, Y.C.; Siu, N.Y.M. Training and enterprise performance in transition: Evidence from China. Int. J. Hum. Resour. Manag. 2004, 15, 878–894. [Google Scholar] [CrossRef]
  63. Deshpande, R. Developing a Market Orientation; Sage Publications: Thousand Oaks, CA, USA, 1999. [Google Scholar]
  64. Shu-Ching, C.; Quester, P.G. Developing a value-based measure of market orientation in an interactive service relationship. J. Mark. Manag. 2005, 21, 779–808. [Google Scholar]
  65. Domenge, R.; Arciniega, L. Development of a short questionnaire for measuring service quality perceptions. DECISION 2015, 42, 11–17. [Google Scholar] [CrossRef]
  66. Silverman, D. Qualitative Research: Theory, Method and Practice; Sage: London, UK; Thousand Oaks, CA, USA, 1997. [Google Scholar]
  67. Luk, C.-L.; Yau, O.H.M.; Chow, R.P.M.; Tse, A.C.B.; Sin, L.Y.M. Stakeholder orientation and business performance: The case of service companies in china. J. Int. Mark. 2005, 13, 89–110. [Google Scholar] [CrossRef]
  68. Li, Y.; Sun, Y.; Liu, Y. An empirical study of soes’ market orientation in transitional china. Asia Pac. J. Manag. 2006, 23, 93–113. [Google Scholar] [CrossRef]
  69. Tian, H.; Zhang, J. Regional vulnerability evaluation index system of environmental emergencies in petrochemical industry. Adv. Mater. Res. 2014, 1073–1076, 400–404. [Google Scholar] [CrossRef]
  70. Chen, J.; Yang, X.; Wang, Z.; Zhang, L. Vulnerability and influence mechanisms of rural tourism socio-ecological systems: A household survey in china’s qinling mountain area. Tour. Trib. 2015, 30, 64–75. [Google Scholar]
  71. Ruwanpura, J.; Mohamed, Y.; Lee, S. Construction Research Congress 2010: Innovation for Reshaping Construction Practice. Available online: http://ascelibrary.org/doi/book/10.1061/9780784411094 (assessed on 10 January 2017).
  72. Wang, N. The role of the construction industry in China’s sustainable urban development. Habitat Int. 2014, 44, 442–450. [Google Scholar] [CrossRef]
  73. Group, E.A.R. Government Construction Strategy? Cabinet Office: London, UK, 2011; p. 43. [Google Scholar]
  74. Group, S.C. Sustainability Action Plan 2012–2015; HM Managemment: London, UK, 2012; p. 13. [Google Scholar]
  75. Zhang, J.; Schmidt, K.; Li, H. BIM and sustainability education: Incorporating instructional needs into curriculum planning in cem programs accredited by ACCE. Sustainability 2016, 8, 32. [Google Scholar] [CrossRef]
  76. Petri, I.; Beach, T.; Rezgui, Y.; Wilson, I.E.; Li, H. Engaging construction stakeholders with sustainability through a knowledge harvesting platform. Comput. Ind. 2014, 65, 449–469. [Google Scholar] [CrossRef]
  77. Zhang, J.-X.; Li, H. Analysis on structure foundation and its index measurement for the excess capacity of construction industry. J. Xi’an Univ. Archit. Technol. Nat. Sci. Ed. 2013, 45, 105–110. [Google Scholar]
  78. Egan, J. Rethinking Construction: The Egan Report; Construction Task Force: London, UK, 1998; p. 38. [Google Scholar]
Figure 1. Cycle of accountability, predictability, balanceability, and policy (APBP) (Wang, 2016) [20].
Figure 1. Cycle of accountability, predictability, balanceability, and policy (APBP) (Wang, 2016) [20].
Sustainability 09 00143 g001
Figure 2. Incorporating growth management model (GMM) into local construction industry transition.
Figure 2. Incorporating growth management model (GMM) into local construction industry transition.
Sustainability 09 00143 g002
Figure 3. Research design. Note 1: (A) represents the previous studies and growth driver analyses that were adopted in this research; (B) represents the theoretical framework integration process; and (C) represents the test process of theoretical framework. Note 2: There are four growth drivers in the response wheel. Driver (a) represents implementation level of transformational development; Driver (b) represents external information integration; Driver (c) represents project knowledge management; and Driver (d) represents corporate brand building support.
Figure 3. Research design. Note 1: (A) represents the previous studies and growth driver analyses that were adopted in this research; (B) represents the theoretical framework integration process; and (C) represents the test process of theoretical framework. Note 2: There are four growth drivers in the response wheel. Driver (a) represents implementation level of transformational development; Driver (b) represents external information integration; Driver (c) represents project knowledge management; and Driver (d) represents corporate brand building support.
Sustainability 09 00143 g003
Figure 4. Level of Shaanxi’s construction industry growth management using average score method with GMM framework.
Figure 4. Level of Shaanxi’s construction industry growth management using average score method with GMM framework.
Sustainability 09 00143 g004
Figure 5. Level of Shaanxi’s construction industry using the entropy method with GMM framework.
Figure 5. Level of Shaanxi’s construction industry using the entropy method with GMM framework.
Sustainability 09 00143 g005
Table 1. The scope of each level in the growth framework of construction industry growth management using the average score method.
Table 1. The scope of each level in the growth framework of construction industry growth management using the average score method.
LevelIIIIIIIV
Scopen × [1,2)n × [2,3)n × [3,4)n × [4,5]
Note: n represents the number of indicators in m units. Source: Compiled by the authors according to the IABGMM level calculation proposed by Charles McIntyre (2015) [20].
Table 2. Scope and level of the growth framework of the construction industry using the entropy method.
Table 2. Scope and level of the growth framework of the construction industry using the entropy method.
LevelIIIIIIIV
Scope[1,2)[2,3)[3,4)[4,5]
Source: Compiled by the authors according to the grading rubric of the IABGMM level proposed by Charles McIntyre (2015) [20].
Table 3. Overview of items and principle components in the final questionnaire of Shaanxi’s construction industry.
Table 3. Overview of items and principle components in the final questionnaire of Shaanxi’s construction industry.
Original Question No.ItemPrinciple ComponentFormal Questionnaire(Appendix A)
Final Question No.Name of Principle Component
V11How significant is the attention given to propagating the advanced practice gained through successful projects in your company?F1-1No. 1Implementation level of transformational development
V14How often are transformational project delivery methods, such as EPC, BT, or BOT, used in your company?F1-2No. 2
V16What is the extent of standardization in your company?F1-3No. 3
V17What is the extent of improvement of living conditions of your company’s construction laborers?F1-4No. 4
V18At what level is your company’s implementation of project information management?F1-5No. 5
V19How often are joint venture and equity used in your company’s project management system?F1-6No. 6
V29How important is brand building to your company in improving its development?F1-7No. 7
V 15How important are your company’s corporate earnings from EPC, BT, or BOT?F2-1No. 1External information integration
V 36In your company’s project management services, how well is the information-related budget managed?F2-2No. 2
V37What is the extent of your company’s clarity of information channels and platforms used to share economic and market trends (e.g., in memos, company newsletters, and/or on the company’s website)?F2-3No. 3
V22How important is the implementation of quality and safety standards to your company’s corporate managers?F3-1No. 1Project knowledge management
V 23How well is project standardization managed in your company?F3-2No. 2
V24What is your opinion of the implementation of project knowledge training in your company?F3-3No. 3
V25How familiar are you with the Excellence Project Management Model published by the Ministry of Housing and Urban-Rural Development of the People’s Republic of China (MOURD, P. R. China)?F3-4No. 4
V26What is your opinion of your company’s implementation of the Excellence Project Management Model published by MOURD?F4-1No. 1Corporate brand building support
V27Does your company have a brand building department?F4-2No. 2
Source: Adoption of research of Zhang et al. [21].
Table 4. Growth level and scope using the average score method.
Table 4. Growth level and scope using the average score method.
LevelIIIIIIIV
Score[16,32)[32,48)[48,64)[64,80]
Table 5. Impact factors using the average score method.
Table 5. Impact factors using the average score method.
IndexF1-1F1-2F2-1F1-3F1-4F1-5F-16F3-1F3-2F3-3F3-4F4-1F4-2F1-7F2-2F2-3
Frequency62849994797866905988609382486281
Frequency %50.468.380.576.464.263.453.773.24871.548.875.666.73950.465.9
Table 6. Index entropy weight of Shaanxi construction industry.
Table 6. Index entropy weight of Shaanxi construction industry.
IndexF1-1F1-2F1-3F1-4F1-5F1-6F1-7F2-1F2-2F2-3F3-1F3-2F3-3F3-4F4-1F4-2
Entropy weight0.0610.0550.0650.0620.0560.0440.0430.0780.0500.0520.0430.1110.1140.0390.0620.065
Table 7. Impact factors using the entropy method.
Table 7. Impact factors using the entropy method.
Index F1-1F1-2F2-1F1-3F1-4F-15F1-6F3-1F3-2F3-3F3-4F4-1F4-2F1-7F2-2F2-3
Frequency5869999361351996356724959586081
Frequency %47.256.180.575.649.628.515.47828.554.519.577.277.26.548.865.9
Table 8. Top seven impact factors by using the entropy method and the average score method.
Table 8. Top seven impact factors by using the entropy method and the average score method.
RankAverage Score MethodEntropy Method
Impact FactorFrequency %Impact FactorFrequency %
1F1-739F1-76.5
2F3-248F1-615.4
3F3-448.8F3-419.5
4F1-150.4F1-528.5
5F2-250.4F3-228.5
6F1-653.7F1-147.2
7F1-563.4F2-248.8
Table 9. Impact factors of the growth driver aspect using the entropy method and the average score method.
Table 9. Impact factors of the growth driver aspect using the entropy method and the average score method.
Growth DriverMethodImpact Factor
Implementation level of transformational developmentAverage score methodF1-7
Entropy methodF1-7
External information integrationAverage score methodF2-2
Entropy methodF2-2
Project knowledge managementAverage score methodF3-2
Entropy methodF3-4
Corporate brand building supportAverage score methodF4-2
Entropy methodF4-1, F4-2

Share and Cite

MDPI and ACS Style

Zhang, J.; Li, H.; Wang, S.H.-M. Analysis and Potential Application of the Maturity of Growth Management in the Developing Construction Industry of a Province of China: A Case Study. Sustainability 2017, 9, 143. https://doi.org/10.3390/su9010143

AMA Style

Zhang J, Li H, Wang SH-M. Analysis and Potential Application of the Maturity of Growth Management in the Developing Construction Industry of a Province of China: A Case Study. Sustainability. 2017; 9(1):143. https://doi.org/10.3390/su9010143

Chicago/Turabian Style

Zhang, Jingxiao, Hui Li, and Steve Hsueh-Ming Wang. 2017. "Analysis and Potential Application of the Maturity of Growth Management in the Developing Construction Industry of a Province of China: A Case Study" Sustainability 9, no. 1: 143. https://doi.org/10.3390/su9010143