Next Article in Journal
Urban Heat Stress Vulnerability in the U.S. Southwest: The Role of Sociotechnical Systems
Previous Article in Journal
Underground Potential for Urban Sustainability: Mapping Resources and Their Interactions with the Deep City Method
Article Menu

Export Article

Open AccessArticle
Sustainability 2016, 8(9), 843; doi:10.3390/su8090843

Research of Coalbed Methane Development Well-Type Optimization Method Based on Unit Technical Cost

School of Business Administration, China University of Petroleum (Beijing), Beijing 102249, China
*
Author to whom correspondence should be addressed.
Academic Editor: Andrew Kusiak
Received: 16 July 2016 / Revised: 18 August 2016 / Accepted: 19 August 2016 / Published: 25 August 2016
(This article belongs to the Section Energy Sustainability)
View Full-Text   |   Download PDF [1154 KB, uploaded 25 August 2016]   |  

Abstract

Coalbed Methane (CBM) is a high-quality unconventional energy resource. The successful development and utilization of a CBM resource needs to consider technical feasibility and economic viability. These factors are also necessary for the improvement of production safety in coal mines, reducing carbon emission, and optimizing energy structure. Because of its unique resource characteristics, surface drilling is the prevailing development approach all over the world. Directional and horizontal wells are generally the two major well-types for CBM development. Development well-type is an important factor affecting CBM efficient development, as it is a key factor in the process of the economic and effective development of CBM resource. In this paper, a method based on Unit Technical Cost (UTC) will be constructed from the perspective of economic viability, and will be used for more simple and accurate optimization of CBM. This method is used for practical well-type optimization in two major CBM development basins in China, and the application results prove that this method is scientifically accurate and feasible. View Full-Text
Keywords: Unit Technical Cost (UTC); well-type optimization; CBM development Unit Technical Cost (UTC); well-type optimization; CBM development
Figures

Figure 1

This is an open access article distributed under the Creative Commons Attribution License which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited. (CC BY 4.0).

Scifeed alert for new publications

Never miss any articles matching your research from any publisher
  • Get alerts for new papers matching your research
  • Find out the new papers from selected authors
  • Updated daily for 49'000+ journals and 6000+ publishers
  • Define your Scifeed now

SciFeed Share & Cite This Article

MDPI and ACS Style

Li, S.; Zhang, B. Research of Coalbed Methane Development Well-Type Optimization Method Based on Unit Technical Cost. Sustainability 2016, 8, 843.

Show more citation formats Show less citations formats

Note that from the first issue of 2016, MDPI journals use article numbers instead of page numbers. See further details here.

Related Articles

Article Metrics

Article Access Statistics

1

Comments

[Return to top]
Sustainability EISSN 2071-1050 Published by MDPI AG, Basel, Switzerland RSS E-Mail Table of Contents Alert
Back to Top