Materials 2016, 9(5), 362; doi:10.3390/ma9050362

Evaluation of Bonding Shear Performance of Ultra-High-Performance Concrete with Increase in Delay in Formation of Cold Joints

1
Department of Architecture Engineering, Hanyang University, 55, Hanyangdaehak-ro, Sangrok-gu, Ansan-si, Gyeonggi-do 15588, Korea
2
Structural Engineering Research Institute, Korea Institute of Civil Engineering and Building Technology, 283, Goyangdae-ro, Ilsanseo-gu, Goyang-si, Gyeonggi-do 10223, Korea
*
Author to whom correspondence should be addressed.
Academic Editor: Eduardo Júlio
Received: 22 February 2016 / Revised: 21 April 2016 / Accepted: 4 May 2016 / Published: 12 May 2016
(This article belongs to the Section Structure Analysis and Characterization)
View Full-Text   |   Download PDF [5925 KB, uploaded 12 May 2016]   |  

Abstract

This study set out to derive the optimal conditions for ensuring the monolithicity of ultra-high-performance concrete (UHPC). Direct shear tests were performed to examine the influence on the bonding shear performance. The experimental variables included tamping and delay, which were set to 0, 15, 30, and 60 min. SEM and XRD analyses of the microstructure and composition were performed. The direct shear tests showed that the bonding shear strength was enhanced by the addition of tamping. For the normal-strength concrete (NSC), it is thought that a monolithicity of around 95% can be attained with a cold joint formation delay up to 60 min. In contrast, while the normalized bonding shear strength reduction of UHPC with a delay of 15 min was the lowest at around 8%, a dramatic degradation in the bonding shear performance was observed after 15 min. XRD analyses of the middle and surface sections revealed the composition of the thin film formed at the surface of the UHPC and, as a result, the main component appeared to be SiO2, which is believed to be a result of the rising of the SiO2-based filler, used as an admixture in this study, towards the surface, due to its low specific gravity. View Full-Text
Keywords: ultra-high-performance concrete (UHPC); cold joint; bond strength; direct shear test; delay; SEM; XRD ultra-high-performance concrete (UHPC); cold joint; bond strength; direct shear test; delay; SEM; XRD
This is an open access article distributed under the Creative Commons Attribution License which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited. (CC BY 4.0).

Scifeed alert for new publications

Never miss any articles matching your research from any publisher
  • Get alerts for new papers matching your research
  • Find out the new papers from selected authors
  • Updated daily for 49'000+ journals and 6000+ publishers
  • Define your Scifeed now

SciFeed Share & Cite This Article

MDPI and ACS Style

Lee, H.-S.; Jang, H.-O.; Cho, K.-H. Evaluation of Bonding Shear Performance of Ultra-High-Performance Concrete with Increase in Delay in Formation of Cold Joints. Materials 2016, 9, 362.

Show more citation formats Show less citations formats

Note that from the first issue of 2016, MDPI journals use article numbers instead of page numbers. See further details here.

Related Articles

Article Metrics

Article Access Statistics

1

Comments

[Return to top]
Materials EISSN 1996-1944 Published by MDPI AG, Basel, Switzerland RSS E-Mail Table of Contents Alert
Back to Top