Next Article in Journal
Energy Management and Control of Electric Vehicles, Using Hybrid Power Source in Regenerative Braking Operation
Next Article in Special Issue
Computational Fluid Dynamic Analysis of a Floating Offshore Wind Turbine Experiencing Platform Pitching Motion
Previous Article in Journal
Research on Energy Saving Potential for Dedicated Ventilation Systems Based on Heat Recovery Technology
Previous Article in Special Issue
Refined Diebold-Mariano Test Methods for the Evaluation of Wind Power Forecasting Models
Article Menu

Export Article

Open AccessArticle
Energies 2014, 7(7), 4281-4299; doi:10.3390/en7074281

Unit Commitment Considering Interruptible Load for Power System Operation with Wind Power

School of Electrical Engineering & Computer Science, Seoul National University, Gwanak-ro 599, Gwanak-gu, Seoul 151-744, Korea
Wind Energy Grid-Adaptive Technology Research Center, Chonbuk National University, Jeonju 561-756, Korea
Author to whom correspondence should be addressed.
Received: 7 May 2014 / Revised: 20 June 2014 / Accepted: 26 June 2014 / Published: 3 July 2014
(This article belongs to the Special Issue Wind Turbines 2014)
View Full-Text   |   Download PDF [774 KB, 17 March 2015; original version 17 March 2015]   |  


A high wind-power penetration level causes increased uncertainty in power system operation because of the variability and limited predictability of wind generation. This paper proposes a novel type of unit commitment (UC) considering spinning reserve and interruptible load (IL) as operating reserve facilities to increase system flexibility for reliable, economical operation. Two uncertainty sources, load and wind generation, were modeled via autoregressive moving averages (ARMA). The formulation of interruptible load was considered in the implementation of unit commitments. Lagrangian relaxation-dynamic programming (LR-DP) was used to solve the unit commitment problem efficiently. The expected energy not supplied (EENS) was regarded as a probabilistic reliability criterion. The effectiveness of the proposed unit commitment was evaluated using an IEEE 118-bus system. The simulation results clearly demonstrated that with demand-side participation, the operating cost was significantly reduced when handling the increased uncertainty due to wind power integration within the required reliability criteria.
Keywords: unit commitment; interruptible load; spinning reserve; wind generation unit commitment; interruptible load; spinning reserve; wind generation
This is an open access article distributed under the Creative Commons Attribution License (CC BY 3.0).

Scifeed alert for new publications

Never miss any articles matching your research from any publisher
  • Get alerts for new papers matching your research
  • Find out the new papers from selected authors
  • Updated daily for 49'000+ journals and 6000+ publishers
  • Define your Scifeed now

SciFeed Share & Cite This Article

MDPI and ACS Style

Park, H.-G.; Lyu, J.-K.; Kang, Y.; Park, J.-K. Unit Commitment Considering Interruptible Load for Power System Operation with Wind Power. Energies 2014, 7, 4281-4299.

Show more citation formats Show less citations formats

Related Articles

Article Metrics

Article Access Statistics



[Return to top]
Energies EISSN 1996-1073 Published by MDPI AG, Basel, Switzerland RSS E-Mail Table of Contents Alert
Back to Top